Mismatch NNSP sends porting LSR to ONSP to port number. End-user Contact End-user agrees to change to New Service Provider (NLSP) NLSP obtains end-user.

Slides:



Advertisements
Similar presentations
1 Number Portability Administration Center Change Orders NANC 399 & NANC 400 NANC Meeting March 15, 2005 Tom McGarry NeuStar, Inc.
Advertisements

Prepare LSR/SUPP using electronic system AT&T Prepares Order to send to BST Order Type? 1.0 AT&T Coordination required? Non-Mechanized Mechanized or Partially.
Prepare LSR/SUPP using electronic system AT&T Prepares Order to send to BST Order Type? 1.0 AT&T Coordination required? Non-Mechanized Mechanized or Partially.
Card Verification Support
Preventing and Resolving Reporting Errors Using Monitor Data Checking Software (MDC) Louis Nichols Clean Air Markets Division.
ATC Conference Call January 10, 2008 Thank you for joining the call. We will start the call shortly. Please enter * 6 to mute your line and # 6 to unmute.
CareCentrix Direct Training.
How to Submit a Matching Gifts Application.
FCC – RESELLER ORDER CALL FLOW DIAGRAM EXAMPLES GLOSSARY SCP – Service Control Point, also called Signal Control Point. A remote database within.
Internet Applications Update Internet Rechartering August 26, 2009.
1.  An inadvertent issue begins upon the discovery of an Inadvertent Gain or Move-In transaction submission. Upon identification of an Inadvertent Gain.
Page 1 of 16 The Work in Progress screen is accessed from the ETS main menu. The screen will be displayed when a user clicks on the ‘Work in Progress’
Hands-On Microsoft Windows Server 2003 Networking Chapter 7 Windows Internet Naming Service.
Using ITAMS as a Supervisor or ITAMS Approver Login to ITAMS as usual, at: Enter your User Identification Number (Same as your.
Page 1 of 23 The FMT system utilizes Roles to determine ownership and levels of responsibility within the FMT system. The Well Licensee/Unit Operator is.
LMS Gap Analysis 6/15/2011 Department of Personnel.
Virtual EMS Step by Step Instructions to Submit Online Room Reservation Requests Events Management Office Rick McCluskey
Double click on the Internet Explorer Icon on your Desktop. This should take you to the Polytechnic of Namibia Intranet Home site or Click on this link.
Enhanced Services Model Training Version 2 July 2010 Proprietary/Confidential. For Internal or Acronis Authorized Partner Use Only.
ASAP (Assessment Submission and Processing) Submission Processing Overview for IRF-PAI IRF Conference May 2, 2012.
NAMS Account Activation Training. 2 What is NAMS? The NASA Account Management System is NASA’s centralized process for requesting and maintaining accounts.
ECONZ Wireless. Support Process Technical Support o 1st line Support: 1940 o 2nd line Support: Econz Wireless o AM/PAM/BP:
Arizona Department of Education Exceptional Student Services Vouchers System RTC User.
Page - 1 Agenda  MFMP Overview  System Basics  Exploring Catalogs  Creating a Requisition  Following Up On Your Order  Receiving Commodities  Invoice.
Overview and Guidelines for... SOA/NPAC, Internal and Inter- carrier testing.
Version 4.0 NOTE: For a more detailed description of each process step within these flows, please refer to the accompanying Inter-Service Provider LNP.
AQS Web Quick Reference Guide Changing Raw Data Values Using Maintenance 1. From Main Menu, click Maintenance, Sample Values, Raw Data 2. Enter monitor.
WELCOME COACHES to the PARK VALLEY UNITED FUTBOL CLUB.
Lifecycle Workstation Operator Training: PIN Reset and Certificate Update Updated April 17, 2012.
WELCOME TO DCDS EMPLOYEE LEVEL PAYROLL ENTRY. WHAT IS DCDS? Data Collection Distribution System Collects Timesheet Data Collects Information on Payroll.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Office of Human Resources Payroll Department Time Entry (DTE) Approving Time 1.
© 2004 AT&T, All Rights Reserved. The world’s networking company SM VoIP, Portability, and the Evolution of Addressing LNPA & Future of Numbering Working.
Loan Transactions Making them simple 1. Loan or Lease? Functionality is the same Lease = $$$ changed hands – Temporary exhibits – May need permits! Loan.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Warehouse Report. Log into EDS using your Address/User Id and Password. If you have forgotten your password, click on the Forgot Password? link.
6/5/011 NPAC SMS BUSINESS DAYS/HOURS & TIMERS. 6/5/012 CONCEPTS Porting and Concurrence Business days Business hours Timers Service Provider profile.
1 6/19/98Copyright 1998 ITN with NPAC and 3rd Party Network Element Barry Bishop Director of Numbering Services Lockheed Martin ITN Number Pooling.
Slide #1 Computerised Transit Computer System Training Session Trader Application Users.
TX SET January 21, 2009 Retail Release Items for February 21, 2009 Kathryn Thurman ERCOT.
GSA’s Vendor and Customer Self Service (VCSS).  View and Print Statements  View and print statements for your accounts.  Statement Search by Agreement.
TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto.
Version 3.0 North American Numbering Council (NANC) Inter-Service Provider LNP Operations Flows NOTE: For a more detailed description of each process step.
Mismatch Is end-user porting all telephone numbers? New Service Provider notifies Old Service Provider of change using Local Service Request (LSR) Old.
GEtServices Purchasing Units & Materials Training For Suppliers Request.
North American Numbering Council (NANC) Inter-Service Provider LNP Operations Flows Version /16/2009.
Remote Data Entry Updates Lori Wangsness Kim Gallimore Lori Wangsness Kim Gallimore.
SIP Events: Changes and Open Issues IETF 50 / SIP Working Group Adam Roach
NCIC VALIDATION PROCESS. Control, Validation, and Other Procedures  Agencies that enter records in NCIC are responsible for their accuracy, timeliness,
Notifier Status Workshop Verizon East Agenda Overview of Notifier Status Review of Notifier Status Capabilities Accessing Notifier Status Demonstration.
Online Self Enrollment & Statement Access UCM Business Procurement Card (BPC) Bank of America Merrill Lynch.
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
How to CORRECTLY Complete a TEASE Access Request Form.
1.  What is the purpose of DEVs? Data Extract Variances (DEVs) are used to synchronize the data among all Market Participants (MP)  What is a DEV? It's.
BAU + PoV Order Handling Process Geographic Numbers Business M/L & S/L LP=Reseller X EU LCP GCP Gaining Chain Losing Chain CLoA GP=Reseller Y PO+ CLoA.
LGC Resource 2016 FlexGen Business Tax Session 2 – State Processing.
American Diploma Project Administrative Site Training.
Cisco Public Sector Contract Sales Reporting Web Portal
Schools Leavers System
Number Pooling Donna Navickas 12/7/97 D.Navickas.
SAMMS Secure Authorized Monitored Messaging System
HB4034 – Duplicate Batch Process
To the ETS – Encumbrance Online Training Course
Porting Process : Denmark
Loan Transactions Making them simple
To the ETS – Encumbrance Online Training Course
Chorus Portal and B2B Changes Design Document
Presentation transcript:

mismatch NNSP sends porting LSR to ONSP to port number. End-user Contact End-user agrees to change to New Service Provider (NLSP) NLSP obtains end-user Authorization NNSP notes “not all TN/MDNs being ported” in remarks field on LSR Old (optionally) and New Service Providers notify NPAC. NPAC performs data validation on each individual message. Did NPAC receive both and matching create messages within t 1 ? Does NPAC SMS receive create message within the limits of the t 2 timer ? Is create message missing from New or Old Service Provider? Did Old SP place order in Conflict? NPAC logs no response NPAC notifies appropriate Service Provider that create message is missing. NPAC notifies both Service Providers that transaction is cancelled and change is rejected. New Service Provider coordinates Physical changes with Old Service Provider Yes No END timer expired C match no match yes New Old INTER-SERVICE PROVIDER LNP OPERATIONS FLOWS - PROVISIONING WITH LSR - Is data valid? yes Return data to Service Provider Data corrected & forwarded no 11/06/01 NNPO Draft A Is the trigger being used? no yes AA B A 14B figure 1 NPAC notifies Old Service Provider that porting proceeds under control of the New Service Provider NPAC logs request to place order into Conflict including cause code BB NPAC notifies appropriate Service Provider that create message is mismatched (Optional) NLSP requests CSR from OLSP. 4 Is NLSP a wireline Reseller? 5 Is OLSP a wireline Reseller? 6 D No Yes Is OLSP a wireline Reseller? 7 E Yes Is end user porting all TN/MDNs? 8 No ONSP provides FOC to NNSP. 11 ONSP and NNSP create and process service orders. 12 Yes No

NPAC SMS downloads (real time) to all Service Providers NPAC SMS records date and time in history file Old Service Provider removes translations in Central Office NPAC SMS logs failures and non-responses, and notifies Old and New Service Providers of failures New Service Provider activates (locally) Old and New Service Providers make physical changes (where necessary) New Service Provider notifies NPAC to activate subscription A All Service Providers update routing data bases (real-time download). END INTER-SERVICE PROVIDER LNP OPERATIONS FLOWS - PROVISIONING WITHOUT TRIGGER - 10/28/98 NANC figure New Service Provider may verify completion 9 10

NPAC SMS downloads (real time) to all Service Providers NPAC SMS records date & time in history file NPAC SMS logs failures and non-responses, and notifies Old and New Service Providers of failures Old and New Service Providers make Physical Changes (where necessary) New Service Provider notifies NPAC SMS to activate subscription All Service Providers update routing data bases (real-time download) New Service Provider may verify completion END 10/28/98 NANC AA Old Service Provider activates unconditional 10 digit trigger in Central Office figure 3 1 New Service Provider activates C.O. translations INTER-SERVICE PROVIDER LNP OPERATIONS FLOWS - PROVISIONING WITH UNCONDITIONAL 10-DIGIT TRIGGER - Old Service Provider removes appropriate translations. 9

New Service Provider contacts the Old Service Provider to resolve Conflict. If no agreement is reached, begin normal escalation. yes Was conflict resolved within 30 calendar days ? yes 10/28/98 NANC figure 4 Cancel Orders How was Conflict resolved? B 6 8 NPAC SMS rejects conflict request. 5 NPAC initiates cancellation and notifies both Service Providers Is Conflict restricted? no 2 4 NPAC changes the subscription to Conflict Status and notifies both Service Providers 3 7 END NPAC notifies both Service Providers of conflict off via SOA 9 “Timeout” If conflict was resolved within 6 business hours, only the Old Service Provider may notify NPAC of “conflict off”. If conflict was resolved after 6 business hours, either New or Old Service Provider may notify NPAC of “conflict off”. 10 Revert to porting process BB INTER-SERVICE PROVIDER LNP OPERATIONS FLOWS - CONFLICT FLOW FOR THE SERVICE CREATION PROVISIONING PROCESS - C BB 11

End-user Did end-user contact Old or New Service Provider? Old Service Provider obtains end-user authorization Old Service Provider sends notification to New Service Provider sends LSR to Old Provider noting cancellation as soon as possible prior to activation time. New Service Provider sends notification of cancellation to NPAC if appropriate. Old New Old Service Provider sends cancellation to NPAC, if appropriate. Did NPAC receive notification(s) within 9 business hours? NPAC logs information, cancels subscription, and notifies both Service Providers of cancellation END Does NPAC receive concurring notification within 9 business hours? NPAC notifies appropriate Service Provider that information is missing. no yes F F 10/28/98 NANC figure C H INTER-SERVICE PROVIDER LNP OPERATIONS FLOWS - CANCELLATION FLOW FOR PROVISIONING PROCESS - no 12

Old NPAC logs information, place subscription in “conflict status” with proper conflict cause code and notifies both Service Providers. H Is Old or New Service Provider cancellation notification missing or inaccurate? NPAC logs information, cancels subscription, and notifies both Service Providers of cancellation with proper cause code New Service Provider notifies NPAC to cancel subscription NPAC logs information, cancels subscription, and notifies both Service Providers of cancellation END How does New Service Provider wish to continue? NPAC waits for 30 calendar days, cancels subscription, and notifies both Service Providers of timeout New Service Provider notifies NPAC to remove subscription from Conflict Status NPAC notifies both Service Providers of conflict off via SOA BB Cancel Subscription Ignore Revert to Pending (Proceed with porting process) New 10/28/98 NANC figure INTER-SERVICE PROVIDER LNP OPERATIONS FLOWS - CANCELLATION CONFLICT FLOW FOR PROVISIONING PROCESS -

Current Service Provider arranges intercept treatment. Current Service Provider creates and processes service order. NPAC broadcasts subscription deletion to all applicable Service Providers NPAC deletes telephone number from its active database on effective release date. END 10/28/98 NANC figure 7 End-user Current Service Provider initiated disconnect. 2 Current Service Provider notifies NPAC of disconnect date and indicates effective release date. 5 3 NPAC notifies NPA/NXX owner/holder of the disconnected telephone number(s), effective release and disconnect dates 7 8 INTER-SERVICE PROVIDER LNP OPERATIONS FLOWS - DISCONNECT PROCESS FOR PORTED TELEPHONE NUMBERS -

INTER-SERVICE PROVIDER LNP OPERATIONS FLOWS - AUDIT PROCESS - 10/28/98 NANC Service Provider requests NPAC for audit 1 NPAC SMS issues queries to appropriate LSMSs 2 NPAC SMS compares own Subscription Version to LSMS Subscription Version 3 NPAC SMS updates appropriate LSMS with Subscription Version updates 4 All audits completed ? 5 figure 8 NPAC reports audit completion to requesting Service Provider 6 END 7 No Yes

INTER-SERVICE PROVIDER LNP OPERATIONS FLOWS - CODE OPENING PROCESSES- 10/28/98 NANC NPA-NXX Code Opening NPA-NXX holder notifies NPAC/SMS of NPA-NXX Code(s) being opened for porting 1 NPAC SMS updates its NPA-NXX databases 2 NPAC SMS sends notice of code opening to all Service Providers via LSMS 3 First TN Ported in NPA-NXX NPAC SMS receives subscription Create request for first TN in NPA-NXX 1 NPAC SMS sends notification of first TN ported to all Service Providers via SOA and LSMS 2 figure 9