COMPRES 2007 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC.

Slides:



Advertisements
Similar presentations
T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
Advertisements

Brillouin Scattering With Simultaneous X-Ray Diffraction at GSECARS, Advanced Photon Source: Toward Determination of Absolute Pressure Scales Jay Bass.
On-line Brillouin spectroscopy at GSECARS Vitali B. Prakapenka, Mark L. Rivers, Stephen R. Sutton, Alexei Kuznetsov - University of Chicago Jay Bass, Stanislav.
Stanford Synchrotron Radiation Lightsource Sources and Optics for XAS Apurva Mehta.
Structure determination at megabar pressure New possibilities for high-pressure single-crystal XRD Development project and COMPRES sponsored workshop Przemek.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Damping Wiggler Beamline: XAS Preliminary Design Summary Paul Northrup January 16th,
Synchrotron applications of pixel and strip detectors at Diamond Light Source Julien Marchal, Nicola Tartoni, Colin Nave Diamond Light Source 03/09/2008.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Imaging x-ray generation and Scattering Tabletop soft x-ray coherent imaging microscopes.
GeoSoilEnviroCARS Matt Newville, Steve Sutton, Mark Rivers Applications: XANES EXAFS Techniques: Near-neighbor distances and coordination environment.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
LCLS Studies of Laser Initiated Dynamics Jorgen Larsson, David Reis, Thomas Tschentscher, and Kelly Gaffney provided LUSI management with preliminary Specifications.
Infrared Radiation 780 nm m Near, Mid and Far
Advanced Photon Source. GeoSoilEnviroCARS Operate a national user facility at the APS for the conduct of frontier experiments in earth, planetary,
20-Jun-2003  XRF and  XAFS with the GSECARS X-ray Microprobe Matthew Newville, Steve Sutton, Mark Rivers, Peter Eng, Tom Trainor Consortium for Advanced.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
1 BROOKHAVEN SCIENCE ASSOCIATES Steve Hulbert, for John Hill CFAC May 8, 2007 Experimental Facilities Update.
What are the key ingredients for a successful laser heating experiment at the synchrotron? Guoyin Shen CARS, University of Chicago GeoSoilEnviroCARS The.
GSECARS Update 13-BM-C Side Station Scientific programs is DAC diffraction and surface science Proposed partial funding as COMPRES Infrastructure Project.
1 BROOKHAVEN SCIENCE ASSOCIATES John Hill PAC May 24 th 2007 Initial Beamline Suite and Beamline Development.
Introduction to Synchrotron Radiation Instrumentation
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
DAC Center at NSLS H. K. Mao (spokesperson)
Environmental Sciences Department BNL Environmental Sciences Dept. and EnviroSuite: from NSLS to NSLS-II Jeff Fitts July 18, 2007 Environmental Research.
1 BROOKHAVEN SCIENCE ASSOCIATES Lonny Berman and Dario Arena, NSLS Summary The present built-out NSLS-II design includes: 30 bending magnet ports, each.
HXMA BL Status CLS AUM 07 June 15, 2007 XAFS: operational; Microprobe: opening for letter of intent; Diffraction: under commissioning.
Understanding typical users for this instrument Graduate studentGraduate student –not an X-ray expert but wants to make a spatially resolved measurement;
COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),
1 BROOKHAVEN SCIENCE ASSOCIATES John Hill EFAC May 10 th 2007 Experimental Facilities Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES User Access and Beamline Development John Hill Director, NSLS-II Experimental Facilities Division NSLS-II User Workshop.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities J.P. Hill Experimental Facilities Division Director PAC Meeting November 20, 2007.
GeoSoilEnviroCARS The University of Chicago Matthew Newville, Stephen R. Sutton, and Mark L. Rivers Consortium for Advanced Radiation Sources, The Univeristy.
Construction of new Neutron Diffractometer and Neutron Optics Test Station at MIT for research in materials science and neutron optics and education of.
Neutron Diffractometer at MIT Nuclear Reactor Laboratory Neutron scattering and spectroscopy are among the pre-eminent tools for studying the structure.
Alexei Yu. Kuznetsov 1, Vitali B. Prakapenka 1, Andrew J. Campbell 2, Thomas S. Duffy 3, Guoyin Shen 4, Dion L. Heinz 1, Mark L. Rivers 1, Stephen R. Sutton.
IFAE-ALBA Meeting, December 13 th 2012BL24 - CIRCE 1 of 13 BL 24 – CIRCE Photoelectron spectroscopy and microscopy.
Stability Requirements for Superconducting Wiggler Beamlines
Multi-anvil at the NSLS Michael Vaughan Liping Wang Jiuhua Chen Baosheng Li Li Hélène Couvy Wei Liu Carey Koleda Bill Huebsch Ken Baldwin.
7/23/99 NIH/NIGMS Support of Structural Biology NIH individual research grants with crystallography projects (FY 98) –primary: 225 grants, $51M total costs.
Gary Feldman MINOS in Cambridge 24 March NO A Update MINOS Collaboration Meeting Cambridge, England 24 March 2009 Gary Feldman.
West Coast Light Sources Simon Clark 2004 COMPRES Annual Meeting Granlibakken Resort and Conference Center, Lake Tahoe, California June 19-22, 2004.
Consortium for Materials Properties Research in Earth Sciences [COMPRES] Draft COMPRES II Proposal for May 1, 2007—April 30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
COMPRES Facilities Agenda 9:30 Mark Rivers—Introduction to COMPRES Community Facilities 9:40 Mark Rivers—GSECARS Update 9:45 Simon Clark—West Coast Synchrotrons.
Laser heating in DAC for mantle melting DAC at XMCD for magnetic probe In situ transport measurements Quantum criticality in Cr Nanoprobe at Mbar Wired.
IFAE-ALBA | Alba, 13 th December, 2012BL29 - BOREAS 1 of 20 BOREASBORE AS BOREAS, Beamline Of REsonant Absorption and Scattering: status report Javier.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition from NSLS to NSLS-II Chi-Chang Kao Chairman, NSLS NSLS-II EFAC October 5, 2007.
NSLS X-Ray High Pressure Research Workshop (February , 2006 ) Strategic Plan for XR-DAC at the NSLS.
X-17 DAC Operations at NSLS Progress Report June 2007 Jiuhua Chen.
Plans for the DAC Program at X-17 Short term (existing $90K) Purchase symmetric DACs and diamonds Install Laue-Laue mono in 17B3 (NSLS provides) Improve.
1 BROOKHAVEN SCIENCE ASSOCIATES A Wiggler Beamline for XAS at NSLS-II Paul Northrup NSLS-II Project and Environmental Sciences Department Brookhaven National.
Infrastructure Development Committee The Mission of the COMPRES Infrastructure Development Committee is to identify, evaluate and pursue the development.
APS Upgrades / Changes Higher brightness (~x100) Higher coherent fraction (~x100) Superconducting undulator 3-Pole Wiggler may be used to replace Bending.
COMPRES Annual Meeting, June 2011 COMPRES is funded by Cooperative Agreements with the NSF Division of Earth Sciences [ ] COMPRES at Kingsmill.
NATIONAL SYNCHROTRON RADIATION CENTRE SOLARIS JAGIELLONIAN UNIVERSITY, KRAKOW, POLAND Piotr Goryl Tango Collaboration Meeting, Elettra,
National SYNCHROTRON Radiation Centre SOLARIS Jagiellonian University, Krakow, Poland Piotr Goryl Motion Workshop, Soleil,
Improving & combining the spatiale & temporal resolution
SSRL Beam Line Infrastructure Update February 2002
Gingin Advisory Committee Meeting 08 Dec 2009
Overview of LERF Status, Plans and Goals
Cornell’s Impact on Synchrotron Science Has Been Huge
X-ray Pump-Probe Instrument
XAFS Spectroscopy Katarina Norén 23/11/2018.
mXRF and mXAFS with the GSECARS X-ray Microprobe
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
PIXEL Project Status John Arthur Photon Instrumentation for
SOLID Collaboration Meeting
X-Ray Endstation Systems (XES) 2006 Schedule
Presentation transcript:

COMPRES 2007 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning) Techniques available to the scientific community  Diamond Anvil Cell: energy-dispersive and monochromatic diffraction and spectroscopy  Multi-anvil Press: energy-dispersive and monochromatic diffraction and imaging (250 ton and 1000 ton press; acoustics, tomography)  Microprobe:  XRF,  XAFS,  CMT,  XRD  Microtomography: absorption and edge CMT  Surface scattering and spectroscopy: CTR, XSW, reflectivity, GIXAFS.  Extended X-ray Absorption Fine Structure (EXAFS)  Microcrystal and powder diffraction  Inelastic scattering in the DAC  Brillouin spectroscopy in the DAC

COMPRES 2007 Annual Meeting GSECARS allocates 100% of available beam time on the basis of reviewed proposals through web-based forms (both GSECARS and APS ratings). All GSECARS proposals are submitted through the APS General User Program. GSECARS User Program

COMPRES 2007 Annual Meeting GSECARS Funding  NSF-EAR Operations funding for FY2007 is $1.81M. Grant was fully funded with increase to $2.05M in FY2008. However, in February we were told to submit flat budget ($1.81M) Operations funding for FY2007 is $1.81M. Grant was fully funded with increase to $2.05M in FY2008. However, in February we were told to submit flat budget ($1.81M) Essentially no money for equipment in FY2007 Essentially no money for equipment in FY2007  NSF-Major Research Instrumentation X-ray optics to complete the 13-BM-C side station ($550K; $88K match; 2004 – 2007) X-ray optics to complete the 13-BM-C side station ($550K; $88K match; 2004 – 2007) Another MRI grant to UNLV for single-crystal diffraction in DAC has $225 for CCD detector for GSECARS, received. Another MRI grant to UNLV for single-crystal diffraction in DAC has $225 for CCD detector for GSECARS, received.  COMPRES Infrastructure Projects CO2 Laser Heating: Postdoc and laser system support CO2 Laser Heating: Postdoc and laser system support Gas Loading Facility: $118K equipment Gas Loading Facility: $118K equipment Multi-anvil Module Project: $68K equipment Multi-anvil Module Project: $68K equipment Johnson Noise Thermometry Project: $36K Johnson Noise Thermometry Project: $36K

COMPRES 2007 Annual Meeting GSECARS Funding (cont)  NSF-Geophysics Rheology Grand Challenge project recently funded, contains $270K for post-doc and supplies for GSECARS. Rheology Grand Challenge project recently funded, contains $270K for post-doc and supplies for GSECARS.  DOE – Midscale Instrumentation Proposal $864K mostly detector-related equipment in main NSF/DOE renewal proposal submitted in Aug at request of DOE program manager. $864K mostly detector-related equipment in main NSF/DOE renewal proposal submitted in Aug at request of DOE program manager. No funds in FY2007. Proposals will be held over for FY2008 when program should be funded. No funds in FY2007. Proposals will be held over for FY2008 when program should be funded.  NSF-EAR Nanoscale Research (NIRT) Award to U. Alaska (T. Trainor, PI; $1.3M, ; $310K subcontract to UofC (P. Eng, PI) supports postdoc Award to U. Alaska (T. Trainor, PI; $1.3M, ; $310K subcontract to UofC (P. Eng, PI) supports postdoc

Canted Undulator Upgrade Proposal submitted to APS SAC Dec. 2006, waiting for response Greatly increases time for high-pressure, microprobe is separated and runs 100% of time

COMPRES 2007 Annual Meeting Detector Highlights MAR-165 CCD detectors (2) One funded by GSECARS-NSF and second by NSF- MRI UNLV/Dera single-crystal diamond cell grant. MAR-345 online image plate GSECARS now has 2, new one funded by GSECARS-NSF Roper visible light CCDs 4 new cameras for LVP, tomography, diagnostics

COMPRES 2007 Annual Meeting Detector Highlights Silicon Drift Diode detectors for energy-dispersive spectroscopy GSECARS has 4-element detector on 6-month loan from SII under SBIR grant, being used right now. Second 8-element (?) detector to be funded by grant to Kathy Kitts at NIU. Pilatus Pixel Array detector State of the art detector. 500x200 array of 170x170 micron pixels. Each pixel has energy discriminator and 20-bit counter. Can count 2MHz/pixel, more than 200 frames/second. Revolutionary for surface diffraction. Could be used for very fast diffraction studies

COMPRES 2007 Annual Meeting Hardware Development Highlights BM-C Development (interface diffraction and single- crystal diffraction at high pressure): Mirror tank, vertical focusing mirror installed. Unfocussed monochromator being used, bender being fabricated. In commissioning for surface diffraction this week, DAC experiments soon Proposals in BM-D Brillouin Spectroscopy Instrument Upgrade to diamond cell apparatus COMPRES infrastructure project led by UIUC (J. Bass) Two cycles now run in “user mode” Report at this meeting

COMPRES 2007 Annual Meeting Hardware Development Highlights (cont.) ID-D CO 2 heating laser Being installed in 13-ID-D. Alexei Kuznetsov talk at this meeting. Gas loading facility for DAC Gas loading system being built by GSECARS with COMPRES funds, will be available to all high-pressure users at the APS. Progress report at this meeting. Multianvil Tomography D-DIA30 Torroidal cell

COMPRES 2007 Annual Meeting Hardware Development Highlights (cont.) ID-D Diode Laser Upgrade Fiber laser replacements for YLF heating lasers received and installed. Higher power and stability. 3 fiber lasers received, one will be for offline heating in laser lab, 2 for online use in ID-D. YLF lasers could be moved to X17 to replace old YAG laser there Microprobe Stage Upgrade Sample stage has been upgraded with a second X- Y-θ tier with 10 nm precision equipped with encoders.

COMPRES 2007 Annual Meeting

B: DIAC: D-DIA D: T-CupE: T-10 F: Hi-P Tomogr. A: T-25 Multiple LVP Techniques G: Torroidal cell

COMPRES 2007 Annual Meeting GSECARS Personnel News Przemek Dera began as beamline scientist for the DAC program on June 15. Norimasa Nishiyama, beamline scientist for the LVP has returned to Japan. Alexei Kuznetsov, post-doc for CO 2 laser heating development; COMPRES and GSECARS funding Atsushi Kubo, post-doc for DAC Takeshi Sanehira, post-doc for Johnson noise thermometry project, COMPRES and GSECARS funding.

COMPRES 2007 Annual Meeting GSECARS Near Term Goals  Bring the 13-BM-C station fully online with scientific programs in interface diffraction and single-crystal diffraction at high pressure  Further develop the D-DIA apparatus for deformation experiments in the multi-anvil press  Further develop the high-pressure tomography technique in the multi-anvil press  Expand user program on the Brillouin spectroscopy system in 13-BM-D  Install and commission CO 2 laser heating for the DAC in 13-ID-D  Install and commission gas loading system for DAC  If APS SAC approves proposal for simultaneous operation of 13-ID-C and D with canted undulators then submit NSF-MRI proposal for upgrades downstream of shield wall.