Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.

Slides:



Advertisements
Similar presentations
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Advertisements

Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
Trigger-less and reconfigurable data acquisition system for J-PET
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
Andris Skuja :: January 2012 Kolkata-Mumbai Workshop Overview1 H C A L Kolkata-Mumbai HCAL Upgrade Workshop Overview of HCAL Upgrade Workshop Andris Skuja.
LHC The Large Hadron Collider (LHC) is an accelerator with 27 km circumference. Being built on the France- Switzerland border west of Geneva. It will start.
Integration of Forward Detectors, ZDC, and CASTOR into CMS Experiments Kevin Reynolds Michael Murray, Mentor David d'Enterria, Co-mentor 2006 Michigan.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Status & Plans for Backend Program  Backend Architecture  Current Status  Schedule for HF Backend  Schedule for HB/HE Backend  Summary & Plans November.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
Evaluation of Emerging Parallel Optical Link Technology for High Energy Physics John Chramowicz, Simon Kwan, Alan Prosser, Melissa Winchell Fermi National.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
1 Status of Zero Degree Calorimeter for CMS Experiment O.Grachov, M.Murray University of Kansas, Lawrence, KS A.S.Ayan, P.Debbins, E.Norbeck, Y.Onel University.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
HCAL Summary CMS Upgrade Workshop November 10, 2011 Jeremiah Mans University of Minnesota.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
D. Breton, S. Simion February 2012
Scintillation Detectors in High Energy Physics
Resolution Studies of the CMS ECAL in the 2003 Test Beam
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Status of the oSLB project
LHCb calorimeter main features
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Robert Reed | University of the Witwatersrand
PID meeting Mechanical implementation Electronics architecture
The LHCb Front-end Electronics System Status and Future Development
FED Design and EMU-to-DAQ Test
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Commissioning of the CMS Hadron Forward Calorimeters Phase 1 Upgrade
Presentation transcript:

Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear & Particle Physics Division Saha Institute of Nuclear Physics Design, Fabrication & Characterization of Optical Splitters for CMS HCAL Back-End Electronics Upgrade 1

Outline Introduction --CMS Detector --Hadron Calorimeter --Electronics Motivation Major Milestones --Installation & Validation of  TCA crate Prototype Optical Splitter & Test India and CERN Summary & Conclusion Future plan 2

Introduction  The CERN Hadron Collider (LHC) is the world’s highest energy particle collider.  Designed to reach a luminosity of cm -2 s -1 at the center of mass energy of 14TeV.  The Compact Muon Solenoid (CMS) detector has been working extremely well since the start of data taking at LHC CMS-Detector HO HB HE HF Electro-magnetic Calorimeter (ECAL) Hadron-Calorimeter (HCAL) Muon Detectors Pixel CMS-Hadron Calorimeter HO HB HE HF HB/HE/HO: Tile Calorimeters HF: Cherenkov Calorimeter 3 Discovery of Higgs boson in center of mass energy of 8TeV

Trigger System Overview of Current HCAL Electronics How data flow from HCAL-front-end to back-end electronics HCAL Front-end Electronics HCAL Back-end Electronics (VME) HCAL Charge Integrator (QIE) DAQ Photo diodes Fiber optic link Data Concentrator Card HCAL Trigger & Readout Cards Front-end (FE) Electronics  Measure the charge of electrical signal  Digitization of charge by charge integrator QIE Back-end (BE) Electronics  Receive and buffer the incoming data from FE though Trigger & Readout (HTR) cards and transfer it to the Data Concentrator Card (DCC)  The DCC is responsible for collating the data from all HTR cards and send this information to the DAQ 4

Motivation  To meet the expected performance of high luminosity of upgrade of LHC, the present CMS-HCAL will require upgrade of detector system and its electronics.  To store information of more depth in the detector, very high speed DAQ is required  Problem: Current HCAL back-end (VME based system) does not support high bandwidth for global DAQ --Upgraded data transfer rate of front-end is high (4.8Gbps) as compare to current data transfer rate (1.6Gbps)  Solution:  TCA (Micro Telecommunication and Computing Architecture) based system will provide more accessible environment and high bandwidth for global DAQ in the CMS experiment.  HF: PMT--Single anode  Multi-anode system HB/HE/HO: HPDs  SiPM -Reduce noise and improve performance of detector -Increase Segmentation depth 5

 To validate the  TCA, it is required to run  TCA in parallel with current VME.  Split the optical signal coming from front-end electronics into two equal parts to feed the present VME and µTCA simultaneously for complete HB/HE. HCAL Front-end Electronics Current Optical Splitters (OSB) Prototype  TCA Crate for HB/HE Upgrade Future back-end (  TCA) Current back-end (VME) 6

  TCA crate has been installed successfully at CMS.  For one HCAL slice, different tests have been performed. All cards are successfully found to receive the data, and error bit rate is found to be zero. Validation of  TCA Crate for HB/HE Upgrade Validatation of micro TCA with 2012 data, CMS-Detector Note. CMS DN-2013/003 Commercial MCH module AMC13 Module AMC Card Major Milestones 7

The present splitting System at CERN  Constraint: Size of current optical splitter (OSB) at CERN, which can not be fitted into the available space.  Tested at P5 (CERN) - found 12 weak fibers out of 1728 Need of Prototype Optical Splitter for HB/HE Upgrade  We have searched for different industries MICROTEK, AUTORAMAA and PDR-Mumbai in INDIA  PDR-Mumbai provide required specification of optical splitter 8

Specifications: Operating wavelength: 850nm Size: (80  100  10)mm 3 50:50 splitting ratio Diameter of input & output channel: 3.0mm PVC jacket Prototype optical splitters manufactured by PDR-Mumbai fulfils specification requirements. Prototype Design  TCA VME Prototype Optical Splitter for HB/HE Upgrade 9

Testing Procedure Light Loss = Input power (P Source ) – output power (P power meter) ) Coupler 8  (1  2/50/125/50:50) Prototype Optical Splitter for HB/HE Upgrade 10 Wavelength of 850nm Input (MTP male) Output (MTP female) 8-fiber splitting assembly Optical Splitter 8  (1  2/50/125/50:50) PDR-Mumbai

Laser source of wavelength 850 nm was used for testing.. losses were measured including the connector Light Loss (dB) Test Results in India 11 Input (MTP male) Output (MTP female) 8-fiber splitting assembly Optical Splitter 8  (1  2/50/125/50:50) PDR-Mumbai

Measured optical losses in the splitters with HO signal Input/ output Prototype Optical Splitter (From India) Orange Green current OSB P1 P2 Prototype Optical Splitter (From India) Orange Green current OSB P1 P Power Meter OVPM B1365A OSB (CERN) Prototype optical Splitter (India) Good Result : Losses with prototype optical splitter (India) 3dB dB Losses with OSB (CERN) > 5dB Test CERN Prototype Optical splitter (India) vs current OSB (CERN) 12

OSB Splitters (CERN) 12 channels were weak Prototype Optical Splitter (by Indian group) 1 channel was weak Total Fibers = 1728 Test Results with HB/HE CERN Good results with prototype optical splitter Four more optical splitter ordered (PDR-Mumbai) for optical margin P5 (CMS) and delivered at CERN. 13

 To house optical splitters of a crate, it is require to have a good designed rack Rack containing 96 connector Two design of racks (PDR-Mumbai): (A) 19 in. 2U containing 48 connectors (B) 19 in. 4U containing 96 connectors Good for cabling Can customize it to 3U for housing 72 connectors for  TCA Design of Rack 14

 CMS-HCAL(HB/HE) upgrade require running VME and µTCA simultaneously.   TCA is installed successfully at CMS.  First prototype optical splitter made in India- successfully tested and being CERN  Optical losses have been measured with HO signal at CERN. with prototype optical splitter (India), losses: 3dB – 4dB with OSB (CERN), losses are  5dB  Tested prototype optical splitter with HB/HE signal, only one channel was weak out of 1728 fibers as compared to OSB where 12 channels were weak.  Four more optical Splitter ordered for optical margin CMS and delivered at CERN. Summary and Conclusion 15

 Testing and validation of Four optical CERN.  Final requirement will be of 250 optical splitters for complete HB/HE upgrade.  Fabricate a prototype of rack for housing a crate.  Plan to make a setup for in-house testing of optical splitters.  Participation in the fabrication and testing of  HTR card at SINP, INDIA. Future Plans 16

17

Back up slides 18 Why 72 connectors ? one crate has 12 uHTR cards Each card has two part (bottom and top) Each splitter has one input and two output = 3 connectors) Total connectors for one crate = 12*2*3 = 72 Each crate need two splitters The other reason we are replacing uTCA with VME is because electonics will be now almost 20 years old and it is difficult to get replacements and spares. The CMS -HCAL is the first sub system to adopt this change. Later on other systems like Tracker, Pixel are expected to go for this change

Total fibers:1728 For HB/HE, we need 9 crates of  TCA Each crate has 12  HTR cards Each  HTR has top and bottom part and each part need 8 fiber input So we need 2 splitters per  HTR card So total splitters required: 9*12*2= 216 Each output fiber has 8 fibers in bundle so 216 * 8 = 1728 fibers in total  HTR Cards (12) Top Bottom Crate (  = 360  /40 0 = 9 crates) 19

Upgraded Back-end Electronics  TCA Electronics (High speed, small size computing system): Single  TCA crate consist of  HTR Cards (HCAL Trigger & Readout Card) : a. Receive the continuous stream of ADC and TDC data from Front-end Electronics. b. Calculates & transmits Trigger Primitives 2. AMC-13 (Advanced Mezzanine Card): responsible for data aquisition as well as distribution of LHC clock and fast control signal HCAL Back-end Electronics will use modern FPGA (Field Programmable Gate Array) and  TCA (Micro TeleCommunications Computing Architecture) 3. Micro TCA Carrier Hub (MCH): a. supply voltage, current on AMC card b. Responsible for the control of power to each slot and for general house-keeping of the crate 20

Current Hcal Back-end Electronics (VME): HTR (HCAL Readout and Trigger cards): The HTR cards receive and process the incoming digital data and transfers it to the Data Concentrator (DCC) when trigger L1 is accepted DCC (Data Concentrator Ccard): The DCC is responsible for collating data from up to eighteen HTRs and transferring it on to the Central DAQ. HRC (HCAL Readout Control card): this card is responsible for fast and slow monitoring As well as trigger control distribution. INDIA-CMS Meeting, 4 th April

Splitters will replace existing fiber-ways 22

23