Jet trigger news R.Gonçalo (LIP) D.Miller (Chicago) Jet trigger meeting 11 August 2014.

Slides:



Advertisements
Similar presentations
Global Strategic Planning Meeting for Teacher Training on Human Rights Education Evaluation Results — Day 1.
Advertisements

Sander Klous on behalf of the ATLAS Collaboration Real-Time May /5/20101.
Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 9 July 2014.
Jet Trigger Planning R.Goncalo (LIP), D.Miller (Chicago) Jet Trigger Meeting, 22 Sep.2014.
Alain Romeyer - January Light higgs decay in SUSY cascade - Status report Introduction Trigger efficiency B tagging Jet calibration Invariant mass.
Trigger validation Ricardo Goncalo, RHUL Physics Validation - 14 September 2007.
HiT – Higgs and Top (Thursday, June 22, 2000) 1.News - Boaz/Meenakshi 2.Trigger Simulator Status – who?? 3.Proposal for a HiT workshop – Meenakshi/Boaz.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
Jet and MET HLT Monitoring for HI Running Ken Johns, Sam Silva, Venkat Kaushik, (U. Arizona)
CSC Note Jet 8 Meeting – April 11 '07 Status and plan for single hadron scale check with minimum bias events N. Davidson The University of Melbourne.
Update FTK Meeting 07/13/06 Erik Brubaker U of Chicago.
Analysis Meeting – April 17 '07 Status and plan update for single hadron scale check with minimum bias events N. Davidson.
Status: WW,ZZ->H->  Catalin, Kevin, Tony, Dovid.
MKEA Conference Workshop # 6 Skills necessary to support classroom observations Eleonora Villegas-Reimers Wheelock College April 7, 2014.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The GlueX Collaboration Meeting October 4-6, 2012 Jefferson Lab Curtis Meyer.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 28 th August, 2007 Outline: Introduction & release plans Progress in menus for cm -2 s -1 Workshop on trigger.
Offline Coordinators  CMSSW_7_1_0 release: 17 June 2014  Usage:  Generation and Simulation samples for run 2 startup  Limited digitization and reconstruction.
Ricardo GonçaloRobustness Workshop - 4/3/08 Slice Studies I Goals of this session ID/MS misalignment Data samples for trigger studies.
Jet Trigger On-Call Shift Summary Ricardo Gonçalo - LIP.
HLT Selection at Phase II John Baines. Assumptions Phase II: 5-7 x10 34 Much of what is currently done at Level-2 will now be done at Level-1, incl. –
24/06/03 ATLAS WeekAlexandre Solodkov1 Status of TileCal software.
ATLAS Data Challenges US ATLAS Physics & Computing ANL October 30th 2001 Gilbert Poulard CERN EP-ATC.
Hadron energy reconstruction in ATLAS Ongoing work (Per, Kerstin and C Santoni and V Giangiobbe from C-F): Analysis of combined test beam data: reconstruction.
Muon trigger validation report M.Biglietti, S. Giagu, A. Policicchio, A. Ventura July 8, 2015.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
TDAQ Upgrade Software Plans John Baines, Tomasz Bold Contents: Future Framework Exploitation of future Technologies Work for Phase-II IDR.
IOP HEPP: Beauty Physics in the UK, 12/11/08Julie Kirk1 B-triggers at ATLAS Julie Kirk Rutherford Appleton Laboratory Introduction – B physics at LHC –
News from Jet/Etmiss Monica. Jet/Etmiss meeting yesterday (25/5) at P&P week – Mostly review of conf notes for ICHEP10 – Good review to check where we.
Questions to Signature & Performance Groups Possibilities for tightening/adding selection cuts: comparison of online and offline selection cuts: – cuts.
1 TRIGGER AND PHYSICS WEEK and MENUS FOR EARLY RUNNING WITH BEAM Building on discussions in PESA Algorithms and Performance meetings, in Trigger and Physics.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Artemis School On Calibration and Performance of ATLAS Detectors Jörg Stelzer / David Berge.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 8 February 2011.
CMS Week Sept '07Leonard Apanasevich (UIC) Pedrame Bargassa (Rice) 1 Physics Priorities for Trigger Development Leonard Apanasevich (UIC) Pedrame Bargessa.
ATLAS Trigger Development
S t a t u s a n d u pd a t e s Gabriella Cataldi (INFN Lecce) & the group Moore … in the H8 test-beam … in the HLT(Pesa environment) … work in progress.
Upgrade Software University and INFN Catania Upgrade Software Alessia Tricomi University and INFN Catania CMS Trigger Workshop CERN, 23 July 2009.
How to prepare a workbook in the OCC. 1. Access the OCC with the school code, username and password for this Academy In the future, as a workshop leader,
FCC-hh HCAL software goals Ana Henriques (thanks for Clement Helsens, Carlos Solans input)
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
USCMS Physics, May 2001Darin Acosta1 Status Report of PRS/  D.Acosta University of Florida Current U.S. activities PRS/  Activities New PRS organization.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Jet/MET Trigger On-Call Report Ricardo Gonçalo – LIP Jet Trigger Meeting – 31/3/2015.
ATLAS Distributed Computing perspectives for Run-2 Simone Campana CERN-IT/SDC on behalf of ADC.
David Berge – CAT Physics Meeting – 9 May Summary Hadronic Calibration Workshop 3 day workshop 14 to 16 March 2008 in Tucson, Arizona
QCD Background Estimation From Data Rob Duxfield, Dan Tovey University of Sheffield.
Trigger Input to First-Year Analysis Model Working Group And some soul searching… Trigger Open Meeting – 29 July 2009.
Jet Slice – use of TopoClusters Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 20 August 2014.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
CMS week1 Agenda Sarah Eno: Status of project Volker Drollinger: jet energy scale and top mass Ritua Kinnunen: Higgs mass resolution E. Doroshkevic:
Alain Romeyer - Sept Light Higgs search in SUSY cascades Introduction (Previous studies) Plans for this analysis Simulation chain Reconstruction.
Detector SimOOlation activities in ATLAS A.Dell’Acqua CERN-EP/ATC May 19th, 1999.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 15 February 2011.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
Some topics for discussion 31/03/2016 P. Hristov 1.
Progress on Simulation Software Hai-Ping Peng(USTC) Xiao-Shuai Qin(IHEP) Xiao-Rong Zhou(USTC) Yu Hu(IHEP) 2014 STC Workshop (ITP) Hai-Ping Peng.
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
Latest News & Other Issues
Monitoring of L1Calo EM Efficiencies
Background Rejection Prep Work
Status of the CERN Analysis Facility
The ADC Operations Story
HCS 455 Teaching Effectively-- snaptutorial.com
Julie Kirk Rutherford Appleton Laboratory
Loading… Please Wait $ $ $100 $100 $100 $100 $100 $200 $200 $200 $200 $300 $300 $300 $300 $300 $400 $400 $400 $400 $400 $500 $500 $500 $500 $500.
Agenda SICb Session Status of SICb software migration F.Ranjard
Presentation transcript:

Jet trigger news R.Gonçalo (LIP) D.Miller (Chicago) Jet trigger meeting 11 August 2014

News Trigger Operations – Mini-workshop tomorrow (40-4-C01, 15h-18h) Dataset lifetimes – Lifetimes will be introduced (see – Current proposal: – 4 months: NTUP_TRIG with x-tag (x-tag datasets are superseded by bulk processing) – 1 year: NTUP_TRIG, NTUP_TRIGBJET, NTUP_TRIGMU NTUP_L1CALO, NTUP_L1TGC – What this means: Datasets older than 1 year and not touched for 9 months can be deleted from both disk and tape All run-1 trigger ntuples (including reprocessings) will be deleted as soon as this policy takes effect jet trigger performance paper – Waiting for MC to add stats for forward jet study

Full-scan versus Partial scan Bug found, probably in Region Selector, affecting Partial Scan (D.Freeborn) Seems to affect only very large RoIs and come from geometry (phi wrapping) Should be fixed by migration of core sw code (Mark Sutton) But PS vs FS study timeline too short to wait for that (next 2 weeks) Studies proceeding with smaller RoI sizes – need to check for effects of this bug Internal note starting, to document study

M5 jet trigger chains Current proposal: – Chains both with and without LCW – All running TopoClusters and full-scan – Aim to see HLT code running on noise (L1 random triggers) – Also on events with some activity (starting from L1 muon trigger) – HLT in passthrough Possible chains are (naming to be clarified): – Random seed -> FS jet (passthrough): j0_perf_L1RNDM —> with LCW j0_cell_perf_L1RNDM —> without LCW – L1 Mu seed -> FS jet (passthrough): j0_perf_L1MU10 —> with LCW j0_cell_perl_L1MU10 —> without LCW

Hadronic Calibration Workshop 2014 Hadronic Calibration Workshop begins in 1 month: – Jet & MET Trigger Session on Tuesday 9 September 2014: – Instructions for uploading contributions: Interesting topics: – Jet & MET trigger performance and lessons from Run I – Calibration considerations for Jet & MET triggers in Run I – Physics analysis experiences and perspective on Jet & MET triggers in Run I – Plans for Jet & MET triggers in Run II – Performance of Jet & MET triggers for physics analysis in Run II – Pile-up dependence of Jet & MET triggers in Run II – Plans for monitoring Jet & MET triggers in Run II – Partial Scan vs. Full Scan Jet triggers in Run II – Performance of topoclustering for Jet & MET triggers for Run II – Use of reclustered jets for fat jet triggers in Run II – Multijet trigger performance and considerations in Run II – Phase I and Phase II Jet & MET triggers Please submit your contributions as soon as possible, or let us know of your intended contributions