Visit on Friday 15 th March 2013
Still a building site – due to open in August
A standard classroom
Martine Scott taking pictures for the records
A science lab – the chairs in the middle can be rearranged
Stairs that are wide with windows and outside light!
Home Economics – plenty of space
Toilets – the cubicle walls are still to be built! There will need to be discussion about the best design.
Looking into the canteen area – the steps on the right will also be an informal seating area
A high quality wooden finish in many areas with plenty of daylight throughout the building
High quality games hall. Very effective soundproofing panels and systems are used all over the school
Quality Welsh slate finish to the outside walls