1 Direct burial cable, up to 24 individual fibers, reinforced.

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

Close Fit Pipe Lining. Overview Close Fit Pipe Lining is an internationally recognised technique which involves inserting a compact pipe or sleeve into.
…your final connection. Mine Cable Services Corporation. Cable Repairs: Vulcanized Splices.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
The DUCTZ (of the Upper Bay Region) Experience
KOSMAK MACHINE ELECTROFOK (MICRO FIBER OPTIC CABLE BLOWING MACHINE WITH ELECTRIC)
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
Report #5 Brief Description A laborer was steam cleaning a scraper. The bowl apron had been left in the raised position. The hydraulically controlled apron.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Vent window installed. Install door frame side latch.
intra-modal competition
American Electrical, Inc. Junction Box / Hookup Box Fast and easy way to make electrical connections An assembled kit – no need to procure and assemble.
Pulse Echo Tester works on principle.
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WFP Slideshow Photos from Water For People Projects Courtesy of Jody Camp Photos from.
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
Power distribution units for home, office and professional use.
CONSTRUCTING A FIVE CABIN LATRINE
Mechanical for Oil Heat
Sales Training Outline 2006 Jeff Roye Product Manager DIN Enclosures 35 Royal Road Flemington, NJ
IMMOBILE ACCESS FLOOR SYSTEM  The immobile access floor system is a product which is suitable for different official places. The material.
Best sensitivity in the world. ( Lux F# IRE) Best sensitivity in the world. ( Lux F# IRE) 700 TV line in B/W and 600 TV line.
“Move & leave” lens zoom and focus adjustment method. “Move & leave” lens zoom and focus adjustment method. Patent no.: Patent no.:
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1. 2 T-SEAL index T-SEAL characteristics T-SEAL specifications.
Column Chromatography
Introduction to a pit installation
Fiber Optic splicing process Technology Partners.
Fiberglass Chassis Cover 101 Why custom shape lightweight strong Why not time consuming Brought to you by: detail oriented can be costly.
HFA Robot Guarding Robot / Conveyor Guarding Built to Customer Specifications ● Optional Doors with Safety Interlock Switch ● Stand Alone Units and / or.
RICE-II Engineering & Deployment Kenneth Ratzlaff, John Ledford Instrumentation Design Lab The University of Kansas.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
Presented To You By BELT MAINTENANCE GROUP The Project THE WORLD’S LONGEST SINGLE FLIGHT CONVEYOR SYSTEM 40.6 KM OF 36” WIDE ST900 STEEL CORD CONVEYOR.
Backfilling new sewer line trench/excavation Multitask sewer installation: trenching and installing new sewer line followed by trench backfill and compaction.
This week we are learning about Jewish homes.
Khulanathi “grow with us” Children’s home Khulanathi “ Grow with us”
1 Home Gardening and Nutrition Training Material GROW FOOD AT HOME Homestead gardening for food security in Lesotho.
Retractable Techniques in fibre optic infrastructures Öner Özemre – Telecom Sales Regional Manager TLC 19th – 20th April 2012.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
 Sonic Stories Emily Hughes.       “It was a warm summer evening and Klausner walked quickly through the front gate and around the side of.
UNDERGROUND CABLE.
A valve must be used to control water flow from ablution hose. Sample drawing for 6270 WC pan. ABLUTION HOSE APPLICATIONS.
 Step 1: Digging the Hole  First dig yourself a good hole. I had a look at pond liners that were available first and knew that I could get one that.
My Birdhouse Step 1 First I sanded my wood so I would not get slivers and so the birds would not get slivers when they had babies.
DEMONSTRATION ON PLANTING MAIZE USING A SINGLE SEED PER STATION Self instructional material for extension workers With review questions By Yakosa Tegha.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
1 Welcome John Mellis BT Laboratories Blown Fibre as a Reduced Cost Network Planning Solution.
Take equipment out of the box Lay out equipment on the table Step 1. Click the colony walls together Step 2. Clip the curtains on both sides - this.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
DOMESTIC ELECTRICAL CIRCUITS National Diploma Mechanical and Electrical Services Construction.
Three View Drawing Technical Drawing and Design Osbourn Park High School Mrs. House.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
ΒΡΑΔΙΕΣ ΚΟΙΝΟΥ – ΑΣΤΡΟΝΟΜΙΑ ΓΙΑ ΟΛΟΥΣ Ε.Γ. Ανασοντζής – Ε.Κ.Π.Α. Τίτλος WP5, Paris, Feb.09.
Ability To Deliver E2E Turnkey Solution 03 of 30.
How to Make, Use, and Reuse an Arborloo. Step 1: Make the Concrete Slab Create 1 m Diameter ring of bricks and line with plastic and place brick/bucket.
10 Deck Washing Tips for Washington, DC Homeowners You can find many tips online on deck washing and cleaning but here are some effective tips on deck.
LED Flashlight.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Objective 6.02 part 2: Recognize components of construction
VELO-installation meeting CERN, January 17, 2006
Flood: Build a Stronger Plinth
Geologic Sequestration
Strip Foundations The foundation runs under all the loadbearing walls.
Barrier Awareness Week 5.
Testing Apparatus Construction
Компания Reichle & De-Massari (R&M)
ELECTRICAL INSTALLATION
Presentation transcript:

1 Direct burial cable, up to 24 individual fibers, reinforced.

2 Direct Burial Cable. Reinforced, flexible, up to 24 fibers per cable. Final leg to the home/ apartment building, terminated in small box inside the building. Two fibers from box to each apartment.

3 Front door of apartment building. Direct Burial cable is fed into the apartment through a hole of 20 mm in foundation or wall.

4 Start of process: The pavement is removed for a trench of 25 cm wide, the fiber cables are prepared

5 Digging the trench

6 Immediately after digging the trench. The cables and ducts can be put into the trench directly after digging.

7 Laying the cables. Yellow cables: direct burial for individual point-to-point connection to the apartments. Blue tube is high density fiber cable, from underground hand hole (connection to individual fibers in yellow cable) to local switch house. Covered with foil for protection and separation/ identification.

8 Filling the trench after laying the cables

9 Mid afternoon: Filling up the trench, compacting the sand

10 Cleaning up and compacting the dirt

11 End of the day: the sand has been compacted, cleaned up, ready for restoring the pavement

12 Second day: restoring the pavement

Vragen? &