Www.wv.doe.gov Phase I Decommissioning Project Update West Valley Demonstration Project Presented by: Bryan Bower, Department of Energy November 14, 2012.

Slides:



Advertisements
Similar presentations
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Advertisements

Watts Scale Control Technology. Fort Bend, Independent School District Overcomes Destruction of Equipment from Scale Armstrong Elementary Formerly Quail.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
International Atomic Energy Agency IX.4.3. Waste management.
Liquid Waste Organization
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
Progress on Cleanup of the INL Site for the INL Retired Employees Association Bob Iotti, President and CEO September 2008.
1 Decontamination, Deactivation, and Demolition David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel November 25, 2013 Patrick Daly.
DEPUTY DESIGNATED FEDERAL OFFICIAL PRESENTATION JOEL BRADBURNE, PORTS SITE LEAD U.S. DEPARTMENT OF ENERGY Portsmouth Site Specific Advisory Board September.
1 Ray Geimer CH2M HILL B&W West Valley, LLC. Quarterly Public Meeting August 27, 2014 CHBWV Project Update
Decommissioning of Nuclear Power Plants Case Study: Dounreay Nuclear Facility Case Study: Dounreay Nuclear Facility Samuel Chapman Heriot-Watt University.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Initial PEP II Radioactive Waste Disposal Estimate Olga Ligeti August 6, 2007.
1 Waste Management David Nickless Environmental Management Los Alamos Field Office March 3, 2015.
1 Hanford Transportation and Packing Overview Presented by: Jim Portsmouth and Marshall Myrick July 2015 CHPRC
Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Engineering Standards Working Group Annual Meeting June 24-25, 2002 DOE Nevada Support Facility June 2002 Joe B Stringer, PE Framatome ANP DE&S.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. Gerard van Noordennen September 29, 2014.
Importation of Class A Waste Texas Compact Commission January 16, 2014.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
One Project. One Team. One Goal.
U. S. Department of Energy West Valley Demonstration Project 18096_1 HLW Project Status Bryan Bower, DOE WVDP Denis Koutsandreas, DOE EM HQ Ron Farchmin,
Nuclear Fuels Storage and Transportation Planning Project
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
Housekeeping. Responsibilities Supervisors are to ensure that good housekeeping is maintained at all Universal Compression’s office, shop and work locations.
May Hazard Classification of the Remote Handled Low-Level Waste Disposal Facility Boyd D. Christensen Battelle Energy Alliance, Idaho National Laboratory.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
West Valley Demonstration Project Environmental Characterization Services Contract Update November 14, 2012 Zintars Z. Zadins, Ph.d. U.S.
Retrieval and Treatment of Problematic MLLW Streams Renee Echols Senior Vice President CTMA Partners in Progress, July 7, 2015.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager June 8, 2015.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 2001: WTP Construction Began. 2 WTP in 2015 Pretreatment Facility High-Level Waste Facility Low-Activity Waste Facility Analytical Lab.
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
Progress in EM’s Footprint Reduction for the Oakland Projects Office Projects Rich Schassburger November 16, 2010.
Geothermal Energy System Progress Update. Will cut annual energy use by 50% Will reduce carbon dioxide emissions by 25,000 tons per year Will cut water.
Program Manager’s Review Joe Christy September 19, 2005.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
South Carolina Nuclear Advisory Council SRS Update and FY 2017 Budget Service ● Safety ● Security ● Stewardship ● SRNL ● Sustainability April 14, 2016.
From Pink Motel to Fire House Site History Site originally developed in 1950 Hotel closed and abandoned in 1996 Assessments under the Nye County Brownfields.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager February 22, 2016.
Miller Driscoll Building Committee Construction Update Thursday February 4, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions &
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Infrastructure Revitalization Project
Radioactive Waste Management Infrastructure in Egypt:
Analysis of Low Activity Waste Streams and Volumes in Decommissioning NPPs  Lisa Edwards Sr. Program Manager, EPRI LLW Forum April 13-14, 2016.
Filter Rehabilitation and Seismic Upgrades – Construction Update
John Christian President, Logistics, Processing and Disposal
Toolik Field Station – Annual Meeting – January 2017
Response Actions To A Fiber Release
CR3 and Crystal River Energy Complex
Transportation of Radwaste from Exelon Sites Mark Ross – Exelon Corporate Manager Radwaste Date: 10/07/2016.
Chemical Metals Industries, Inc. (CMI)
Pinole-Hercules Water Pollution Control Plant Upgrade Project
West Valley Demonstration Project Status Update
Northeast High-Level Radioactive Waste Transportation Task Force
Chemical Metals Industries, Inc. (CMI)
Presentation transcript:

Phase I Decommissioning Project Update West Valley Demonstration Project Presented by: Bryan Bower, Department of Energy November 14, 2012

Current Activities: Reviewed Concrete Storage Cask fabrication activities at Zion (CHBWV) NAC prepared the project plan (NAC) Design for Storage System - Due December 31, 2012 (NAC) Design for Storage Pad (NAC) – January 30, 2013 Design for transport system (NAC) – Dec 31, 2012 Request For Proposal for decontamination canisters (CHBWV) – December NAC Project using Vertical Storage High Level Waste Canister Relocation and Storage Project

Continued pre-demolition activity in the Lower Extraction Aisle and Chemical Operating Aisle for systems disposition Continued asbestos abatement in Cold Lab of the Analytical Aisle Continued characterization of high hazardous areas MPPB Accomplishments Drilling Tell-Tale in LXA/COA Draining Piping in LXA/COA 3

Vitrification Facility Accomplishments Completed air gap of Vitrification Off-Gas piping between trench and Building, including grout bulkhead Removed components containing hazardous constituents from Vit Facility Aisles (e.g., circuit boards, lamps, batteries) – formerly used for treatment Vit Off-Gas Pipe Air Gap in Trench Haz. Component Removal in Vit 4

01-14 Building Accomplishments Completed electrical and mechanical isolations and air gap to facility Completed removal of shielded pipe chase Shut down facility blowers and stack monitoring Completed Off-Gas and main plenum filter removal Prepared for demolition Shielded Pipe Chase Cutting Shieled Pipe Chase Air Gap 5

01-14 Building: Demolition Phases 6 Original Construction After Step 1 After Step 2

Completed demolition of: Maintenance Storage Area Product Storage Area Old Warehouse and Counting Lab Slabs Vehicle Repair Shop Vitrification Test Facility Waste Area Slab Vitrification Construction Fab Shop Slab Waste Tank Farm Test Tower Balance of Site Facilities Accomplishments Vehicle Repair Shop Demo Vit Fab Shop Slab Demo 7 Waste Tank Farm Test Tower

Waste Shipping Accomplishments Completed 5 of 12 low level waste (LLW) and 2 of 4 mixed low level waste (MLLW) interim shipping milestones Total volume of legacy waste shipped since contract start: ̶ 44,335 ft 3 versus plan of 41,951 ft 3 of legacy LLW Exceeds FY2012 plan 6 months ahead of schedule ̶ 1,607 ft 3 of legacy MLLW ̶ 120 ft 3 of legacy hazardous and universal waste (Completed) ̶ 814 ft 3 of legacy industrial waste Loading LLW shipment in LSA 4 LSA 4 TRU and LLW container storage 8

Waste Shipping Accomplishments Total volume of newly generated (NG) waste shipped since contract start: ̶ 3,696 ft 3 of NG LLW ̶ 110 ft 3 of NG MLLW ̶ 204 ft 3 of NG Hazardous and Universal waste ̶ 10,185 ft 3 of NG Industrial waste Waste Load Out of the Old Warehouse Pad 9

Questions? 10