Soil Excavation and Concrete Penetration Permitting Process at LLNL Dennis Chew Plant Engineering Department September, 2006 UCRL-PRES-224319 This work.

Slides:



Advertisements
Similar presentations
Ways to Improve the Hazard Management Process
Advertisements

Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
SOS Representative (SR) Training UC Irvines Injury and Illness Prevention Program
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
TurnKey Project Management Services Capabilities Briefing.
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
LEAN PROCESS IMPROVEMENT Office of Plan Review & Inspections Wisconsin LEAN PROCESS IMPROVEMENT Office of Plan Review & Inspections Wisconsin.
FHWA Sustainable Highways Self- Evaluation Tool Tracking Environmental Commitments Recycle and Reuse Materials Construction Equip. Emission Reduction Construction.
113 East College Avenue, Suite 200 Tallahassee, Florida
© Business Review - Arabian Peninsula January 24, 2010 / Slide 1 ABB Contractors Business Partners John Hartnett May, 2010.
Environmental Compliance Team (ECT) February 28, 2008.
Hillyard – Vektr CQI ™ Continuous Quality Improvement Hillyard Inc. has partnered with Nuvek LLC, to gain hosting capabilities for a new and innovative.
Developing GIS for Scottish Canals
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
LLNL and LANL Portal Update Cathy Aaron, Lawrence Livermore National Laboratory Katherine Norskog, Los Alamos National Laboratory Presented at InterLab.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Developing a Chemical Risk Management Program
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
ERIKA BARRETT TECHNICIAN, BIOLOGICAL SAFETY OFFICE OF RADIATION, CHEMICAL & BIOLOGICAL SAFETY FRIDAY, OCTOBER 3.
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
Avoiding a Dam Midlife Crisis 2011 NWHA Annual Conference Scott Larrondo—Idaho Power Company Manager, Power Plant Engineering & Construction.
The Quality Management System
BUILD WITH US. ™ Contractors
OH&S Management System
I n t e g r a t I n g C S S Practitioner Module 6 1 Module 6: CSS and Livability in Construction, and Maintenance.
Gulf of Mexico Simultaneous Operations Safe Work Practice
EHS Management System Elements
Process Safety Management
Authorization and Inspection of Cyclotron Facilities Inspections.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.
What Do Inspectors Need To Know About BMPs? Tim Zimmerly, Terrill Lemke Los Alamos National Laboratory LA-UR
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Environmental Restoration Projects Methods for Safety Culture Realization November 30, 2007.
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
Work-Specific Hazard Checklist (WSHC) May 20, 2013 Mark Berkheimer, CHMM ORAU EH&S Specialist 3/Chemical Hygiene Officer 1.
HBR Best Practices Seminar Presented by CertifiedSafety Brady’s Landing June 30, 2005.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Public Protection Service 2008/9 Charter Mark and Electronic Data Management System (EDMS) Improve performance and efficiency together with improving customer.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Compliance Suite™ Compliance Suite™ is Physical Plant’s software program for regulatory compliance and training tracking.
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
1 IMPLEMENTING DOE ORDER ENVIRONMENTAL MANAGEMENT SYSTEMS U.S. Department of Energy Richland Operations Office.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
. 1.  EH&S Strategic Plan ◦ Review Mission, Vision, Values ◦ Strategic Objectives  Projects and Action Plans to support Objectives  Aligning Working.
Electronic Design Change Process Paul Tobin Jr.- PKMJ Technical Services.
Date and page number - 1 Safety Management at the NNSA Service Center (Albuquerque) Dennis Curtis Complex Support Department Occupational Safety and Health.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
HORSE CREEK WATER SERVICES INC GENERAL RATE APPLICATION.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Chicago Area Facilities (CAF) Ground Disturbance and Excavation Procedure.
Records Management with MOSS, K2, & PsiGen Deepa Patadia
OH&S Management System
Quality Management in Gas Operations Survey Responses
Environmental Health and Safety (EH&S) Supplier Awareness Training
AGA Distribution Best Practices Program Control Room Management
Excavation.
Public Awareness Compliance Elevating Awareness...Creating Engagement
What Safety Success Does Not Look Like…
SAFETY STANDARDS FINAL JEOPARDY
County Wide Safety Program
DOE Review of the LCLS Project October 2006
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Soil Excavation and Concrete Penetration Permitting Process at LLNL Dennis Chew Plant Engineering Department September, 2006 UCRL-PRES This work performed under the auspices of the U.S. Department of Energy by the University of California, Lawrence Livermore National Laboratory, under Contract No. W-7405-ENG-48

Brief History  Began with the purchase of LLNL’s first Audio Frequency instrument in the early  Proactive step taken by LLNL as a result of an increasing number of utility strikes  Locates were performed out of the Craft Shop of Plant Engineering  External building Locates  Between 1990 and 1998  Permit Process Documents  Internal & External building Locates  30” No Dig rule  Ferromagnetic scanners & Ground Penetrating Radar (GPR)  Between 1999 and 2000  Established Permit Database – issuing paper permits  LLNL “One Call” center concept  Mindset / Purpose  Preventing unplanned outages  Reducing unplanned project costs  Safety

Where we are at today  Permit Office has grown  Size and responsibility  Improved database tracking methods  Two types of permits Soil Excavation and Concrete Penetration  Mindset / Purpose  Preventing unplanned outages and reducing unplanned project costs  Safety Culture shift  Today the permit office issues an average of 60 permits per month  Education/Training  3 rd party certification required  Safety Video  Incorporating new technologies  Radio/Audio, GPR, and ferro-magnetic scanning  Marker Ball program (open trench) Integrating with the Facility Information Center

The Permit Process  Responsible Individuals  LLNL employees who serve as the point of contact  Partnering with the Permit Office to ensure compliance  Annual training requirement  Permit Office  Locators Perform the locates and add any comments they may have on the permit – resources include As-builts / construction drawings / Utility drawings, etc…  Issue the permit upon receiving all approvals Regulatory approvals Utility Owner approvals Signature Approvals  Job site field visits Compliance Inspections  Permit Closure Archived into the Permit database

The Permit Process Utility Location Database Locate Findings / Field Markings

Locating Instruments

Programmable Marker Ball Program

Documentation and Configuration Management Governing procedures for the permit process  Continually evolving  Lessons Learned & Process Improvement  Customer feedback  Staying ahead of the game  On-going Communication  Roll-out meetings and newsletters  Eyes and Ears in the field  Partnering with the Utility owners  Provide up to date utility documentation  Involve them in the approval process as owners PROC-CON 0002 Concrete PenetrationPROC-CON 0003 Soil Excavation

Safety Integration * * Safety Video * * * * Job Safety Analysis * * * * Locator Field Survey * * * * Pre-Task Hazard Analysis * * * * Compliance Inspections * * * * Compliance Inspections * * * * Outage Requirement * * * * 30” No Dig Zone * * * * 30” No Dig Zone * *

Closing Thoughts Innovative Thinking Continued Awareness Of the Safety Culture Partnering

Q & A