The Project Development Process: Setting the Context for Project Control Part #1 November 28, 2015.

Slides:



Advertisements
Similar presentations
Project Control: Control of Work and Cost Versus Time Part #4 May 29, 2014 Hide/Unhide Exercises?
Advertisements

Project Control: Developing the As-Planned S-Curves
Fawzy Al-Alami G Term Paper.  Introduction.  Effect of Teamwork in Design-Build. Construction Contract.  Factors Can Enhance Design-Build.
Planning for Program Delivery Presented By: Michael A. Haithcock, P.E. Assistant State Program Delivery Engineer October 27, 2009.
CIVL202 Construction Engineering I Tutorial 6 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Software Engineering General Project Management Software Requirements
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Chapter 3: The Project Management Process Groups
Chapter 3: The Project Management Process Groups: A Case Study
Project Management Basics
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Management, Supervision, and Decision Making
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Project Control: Developing the As-Built S-Curves Part #3 June 26, 2002 Hide/Unhide Exercises.
9 Closing the Project Teaching Strategies
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
3/11/2003CVEN Maxwell1 Types of Contracts, Ownership, etc. Module Follows Halpin Chapter 5 Updated: March 11, 2003.
Chapter 1 Introduction.
Ordinary Capital Expenditures Approvers’ Course Course runtime approximately: XX Minutes.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Warm-Up Rules of Engagement Office hours are in the afternoons, unless you have made other arrangements. If the door is open, I’m in the area come look.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Construction Contracts and Project Delivery Methods
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Project planning and Management By Fouad CSI1. MODULE III: PROJECT LIFE CYCLE Project Life Cycle A project life cycle is the series of phases that a project.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
4/28/2003CVEN Maxwell 1 Job Site Issues Module October 14, 2015.
Software Project Management
Managing the Information System Project Dr. Dania Bilal IS 592 Spring 2005.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
In the name of Allah the Most Gracious the Most Merciful.
Agency Construction Management :CM NOT AT-RISK
4/21/2003CVEN Maxwell 1 Project Control: Control of Work and Cost Versus Time Part November 19, 2015.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
3/19/2003CVEN Maxwell1 Forms of Organization Presentation: March 19, 2003.
Winter 2011SEG Chapter 11 Chapter 1 (Part 1) Review from previous courses Subject 1: The Software Development Process.
 Context for the Training  Training Related to Implementation of Safety Decision Making Methodology  Fidelity of the Family Functioning Assessment.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Project Control: Work and Cost Versus Schedule Module: April 22, 2003.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
UNIT III. A managerial problem can be described as the gap between a given current state of affairs and a future desired state. Problem solving may then.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
Chapter 3: The Project Management Process Groups: A Case Study 1.
Longreach Mains Replacement an ECI Model. Parties involved in the Project MARK SHIRLEY ENGINEERING CONSULTANTS.
CHANGING PROJECT DELIVERY SYSTEMS
Lease-Leaseback Project Delivery Method
CONTRACT ADMINISTRATION
Project Management Processes
Project Controls: As-Built S-Curves
Chapter 3: The Project Management Process Groups: A Case Study
CHANGING PROJECT DELIVERY SYSTEMS
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Project Estimating Overview
The Project Development Process:
Traditional Steps Leading To A Bid Document
Introducing ISTQB Agile Foundation Extending the ISTQB Program’s Support Further Presented by Rex Black, CTAL Copyright © 2014 ASTQB 1.
CIS 210 Systems Analysis and Development
Project Management Processes
The Design Process.
Chapter 3: The Project Management Process Groups: A Case Study
Presentation transcript:

The Project Development Process: Setting the Context for Project Control Part #1 November 28, 2015

Purpose Establish the context for understanding how to use project control techniques to control costs and time during a typical construction project development process. Establish the context in which the Project Manager relates to the process and his/her role in controlling the process.

Learning Objectives Be able to draw and annotate a sketch of the Project Development Process. Be able to identify the points in the Process where both the Planned and Actual data are developed. Be able to identify where and when the application of Project Controls is appropriate.

There Is No Unique Process There is a general process for the development of engineering projects Every situation will create a unique variation on the general theme Unusual situations often create the need to make substantial changes to the traditional process.

The Usual Parties Involved The Owner: the party receiving the value and underwriting expenses. The Designer: the party creating all or part of the design on behalf of the Owner (in-house). The Builder (usually referred to as the Contractor): the party executing the design on behalf of the Owner (in house). The Project Manager’s role in controlling the process depends upon his relationship to one or more of these parties.

The Traditional Project Development Process ** Owner usually retains a design consultant during the design portion of the process.

Exercise #1.1 – The Process Individually, sketch the process just described (2-3 minutes). As Pairs, Combine your sketches (3-4 minutes). Get several pairs to explain their sketch to the rest of the class (4-5 minutes). By Pair, Identify all of your work, staple the three pages together, and turn in.

The Traditional Process Steps Recognize the need and gather support Assess the need and “scope” the project Generate conceptual designs (without evaluation) Evaluate alternatives (time, cost, performance, etc.) Select feasible design(s) and revaluate Develop final, detailed design(s) (PS&E) Select builder (bids, negotiation, partnering, etc.) Build according to the final design and specifications and monitor and control progress Take corrective actions when necessary Accept upon satisfactory completion Put completed project into service

Fast Tracked Process 1.Designer and Contractor selected early in the process; perhaps before detailed design has begun. 2.Owner, designer, and contractor must “partner” for this to be really successful. Responsibility for project controls must be “shared” among all parties concerned. 3.Principal advantage is time savings; principal disadvantage is design changes or “scope creep” leading to disputes between the owner, designer, and the contractor.

Discussion Exercise #1.2, Ask Selected Individuals As an Owner, why would you consider “fast tracking” a project? As a Contractor, why would you enter into such a risky venture? As a Designer, what are the hidden dangers for you?

Discussion Exercise #1.3 Ask selected Pairs to report on the following issues: Assume that you are the Builder’s Project Manager, what part of the process concerns you? Assume that you are the PM for the Designer? Assume that you are the PM for the Owner?

Project Manager Responsibilities Regardless of the Project Manager’s role, he/she has four primary project control responsibilities : Complete the project on schedule Complete the work under budget Deliver the proper quality and quantity of work Maintain a safe and non threatening work place. Project controls are designed to ensure success in all four areas.

PM’s Role Depends Upon Location Within Process

Discussion Exercise #1.4: As a Project Manager, assume that you work for the designer, what does a safe and non- threatening work place mean? Does it mean? Sexual Harassment, or Dangerous Horse Play, or Bullying. From another point of view, what risk are you trying to control in this case? What other risks are there?

Optional Readings Halpin and Woodhead, Chapter 1 – History and Basic Concepts.

Reminder! Class Assessment Questions In 1 sentence what was the muddiest part of this module? In 1 sentence, what part of this module could be improved the most?