Traffic Barrier Guidelines Tracy Borchardt February
Traffic Barrier Guidelines 2 BWA Process Usage Guide
Barrier Usage Guide 3 Guardrail Traffic Barrier Terminals Attenuators Cable Median Barrier Concrete Barrier
References AASHTO Roadside Design Guide, 4 th Edition –
Traversable Element RDG-Figure 4-1. Breakaway Support Stub Height Measurements 5 4 in. 5 ft.
Traversable Element (cont.) 4’ 1:6 (V:H) 6
Traversable Element? 7
8
9 YES
Warrant Analysis Level 10
Flowchart for Analysis of Existing Obstacles 11
Proliance Updates – October
Proliance Updates – October
Level 0 Table Analysis Level then Level
RSAP Guidance – Determination of Alternatives 15
Presentation of Barrier Warrant Analysis Checklists Cover Sheet Table of Contents Disposition Location Plan Data Sheet Calculation Sheet Site Plan Summary Site Plan Cross Sections Level 0 Table Level 1 Analysis Level 2 Analysis Level 3 Analysis 16
Barrier Warrant Amendment Process 17 What initiated change to design? Who initiated change? Who completes Amendment to BWA? In addition to GEC, who reviews BWA Amendment? Field change CM or Contractor DSECM Value Engineering Proposal Contractor Contractor’s Designer DSE / CM Performance Based Design Contractor Contractor’s Designer DSE / CM
Gutter and Guardrail G-3 Modified GutterG-3 Gutter 18 Gutter may be constructed in conjunction with guardrail, but is not required solely because of the presence of guardrail and vice versa. Guardrail shall not be constructed to shield improperly placed gutter or curb. Guardrail
Barrier Clearance Distance Measured from back of post to face of obstruction. 19
Barrier Clearance Distance Guardrail System Post SpacingDesirable Barrier Clearance Distance Minimum Barrier Clearance Distance MGS- 31” Type A 6’- 3”42” 28” MGS- 31” Type B ½ Post Spacing 3’- 1 ½”30” 23” MGS- 31” Type C ¼ Post Spacing 1-’6 ¾”24” 14” 20 Minimum Barrier Clearance distances are only to be used for Existing Obstacles
Galvanized Steel Plate Beam Guardrail 21 Transition to ½ -Post Spacing
Galvanized Steel Plate Beam Guardrail 22 Transition to ¼-Post Spacing
Roadside Safety Analysis Program (RSAP) 23
Traffic Barrier Guidelines – Next Steps Hands-on Workshops Late Summer
Traffic Barrier Guidelines – Next Steps Construction Manager’s Training March 22 nd and TBD 25
Questions ? 26