PIP Status Report Linac Startup plans 12/05/2012.

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
MCTF C. Johnstone All Exp. Meeting 14 Mar First Beam to Muon Test Area Description and commissioning of beam to MTA Experimental Hall C. Johnstone,
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
ESS DTL beam commissioning
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
REFERENCES [1] C.Y. Tan, FNAL Beams-doc-3646-v16, 2011 [2] V.N. Aseev, TRACK, the beam dynamics code, PAC05 [3] S. Kurennoy, LA-UR TRANSMISSION.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Anders Sunesson RF Group ESS Accelerator Division
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
AEM – Special Report Linac Current Stability and Modulation June 25, 2007 Presented by: Doug Moehs Philippians 4:6-7 (Doug) Do not be anxious about anything,
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
The Stripping Foil Test Stand in the Linac4 Transfer Line
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
PIP Status Report Linac Startup plans 12/05/2012.
TLM example application T. Leveling March 15, 2013 Attendees: Don Cossairt Kamran Vaziri Adam Olson Dave Peterson John Anderson Paul Czarapata Tony Leveling.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Run 10 Start-up Status
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Linac Weekly Operational Report May 9 th – May 16 th 2008.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
LINAC4 commissioning plans etc.
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
commissioning and measurements
LCLS Commissioning P. Emma, et al
Status of the JLEIC Injector Linac Design
Presentation transcript:

PIP Status Report Linac Startup plans 12/05/2012

Linac Shutdown Activities 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans2

Linac Tunnel Activities 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans3

Linac Low Energy Activities 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans4

Linac HE Activities 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans5

Linac Performance Prior Shutdown /5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans6 Average Input beam current: 48 mA Output beam current: 34.5 mA Efficiency: 74% Peak Values Input beam current: ~54 mA Output beam current: ~38 mA Efficiency: 70% Nominal: Beam current: 34.5 mA

NTF at a Glance 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans7  Treatment occurs 3 times a week Tuesday, Thursday and Friday Time: 8:00 A.M. 11:30 A.M.  Treatment typically lasts 4 weeks Not counting the setup time which takes a couple of hours typically one week prior the setup  Beam to NTF extract at 66 MeV H - beam, 15 Hz, nominal Linac intensity (34.5 mA), 64  sec macro pulse length

A glance at the NTF program 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans8 Courtesy of T. Kroc

Typical NTF Beam 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans9 CTOR2 ~ 30 mA TO1IN 47.2 mA TO4OUT ~ 34 mA Eff ~ 72% CTOR TO1IN 50 TO4OUT TO4OUT/ TO1IN Nov-2011 – 28-Nov-2011

Lower Beam Intensity = Longer Treatment Time 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans10 Treatment times are inversely proportional, but linear, to TLG percentage & beam current Tom Kroc On Feb. 24, 2012: CTOR2 = 32.5 mA The given dose was MU Beam time was 2.23 min (0.343 MU/min) On Sept. 10, 2012: CTOR2 = 27 mA The given dose was MU Beam time was 3.67 min (0.248 MU/min) Holding still time causes all the stress. T. Kroc

RIL & 66 MeV Commissioning 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans11  RIL delivered 750 keV to entrance of DTL tk1 Nov 14 th, first day of RFQ commissioning  poor capture and transmission  small intensity beam seen at DTL tk3 & tk4  12 days later, a buncher phase scan was performed  better matching into Linac  transmission improved  Initial beam study the beam pulse length and rep.rate set to 10  sec long and 1 Hz, respectively  to avoid possible accelerator components damage rr

NTF Schedule  NTF has been off since September 10, 2012 for RFQ Installation  Treatment schedule resumes December 11, 2012  3 patients booked  setup time occurring this week  NTF beam permit was revised and signed November 16, 2012  NTF staff is ready for resuming treatment  … and so is RIL and Linac 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans12

Beam is making to NTF 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans13 Oct 2011 Nov 2012

Linac Performance RIL – 66 MeV Commissioning 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans14 Average Input beam current: 21.5 mA Output beam current: 20 mA Efficiency: 84% Peak Input beam current: 28 mA Output beam current: 23 mA Efficiency: 90% Nominal: Beam current: 34.5 mA

12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans15 LINAC 400 MeV Startup Schedule

LINAC 400 MeV Startup Studies Plan 12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans16 Dec 17 th 2012 – Jan 7 th 2013 Initiate 400 MeV commissioning Beam commissioning mA, 10  sec, 1-5 Hz Limited by beam losses, beam heating interceptive instruments studies will be performed by a small group Beam diagnosticBeam position monitors, Multi Wire, Toroids Turn-on & Commissioning Measurements Transmission efficiency differential current meas. (toroids) Transverse matching beam size (wire scanners) Restore nominal trajectories beam position (BPMs) Feb 2013 …Goal: beam study time schedule to take into account NTF treatment and to be negotiated among Booster study groups & Operations After MI comes online Goal: beam study time schedule to take into account NTF treatment or it can be performed parasitic or integrated into shift time

12/5/2012F.G. Garcia - PIP Mtg: Linac Startup Plans17 TO1IN Toroid Prototype Module