Devico AS Olkiluoto September, 2007. Olkiluoto nuclear power plant Olkiluoto Nuclear Power Plant is one of Finland's two nuclear power plants. The Olkiluoto.

Slides:



Advertisements
Similar presentations
Devico AS The company: Business segments: Company arena:
Advertisements

Chris Tai Devico AS Regional Manager 30th Nov 2007
CONSTRUCTION DRILLING INC.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Lithuanian concept for disposal of
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
IT IS PROFITABLE TO COOPERATE WITH THE NATURE ISA Stockholm
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
district development Tanzania – Lake Victoria Greenstone Belt.
Henderson Mine Site. Henderson Mine Central Campus Shaft Collar Elev 10,400 ft Shaft Bottom Elev 7,500 ft LA Ramp Primary Access Ramp 3600 ft Central.
Decommissioning of Nuclear Power Plants Case Study: Dounreay Nuclear Facility Case Study: Dounreay Nuclear Facility Samuel Chapman Heriot-Watt University.
The Safe Working Practice of Changing Out a Raisebore Reaming Head Underground Eloise Copper Mine.
Dounreay Nuclear and Chemical Land Contamination.
First European High-Level Nuclear Waste Repository – OLKILUOTO, FINLAND – Rock Model Verification and Validation Calin Cosma & Nicoleta Enescu 7th International.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
The Yucca Mountain Repository for Nuclear Waste April 23, 2007 Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Alternative Modeling Approaches for Flow & Transport in Fractured Rock Douglas D. Walker, DE&S Jan-Olof Selroos, SKB Supported by Swedish Nuclear Fuel.
Pyhäsalmi (site review) W. H. Trzaska on behalf of the Finnish LAGUNA team.
EVOLUTION OF DEVICO TECHNOLOGY CDDA 2015 Ben L’Heureux.
Braidwood Status Report Jonathan Link Columbia University APS Study, Reactor Working Group February 7&8, 2004.
Joint Migration of Primary and Multiple Reflections in RVSP Data Jianhua Yu, Gerard T. Schuster University of Utah.
Waiting for the Nuclear Renaissance: Exploring the Nexus of Expansion and Disposal in Europe Jane I. Dawson Weinmann Professor of Government & Environmental.
Interferometric Multiple Migration of UPRC Data
Autocorrelogram Migration for Field Data Generated by A Horizontal Drill-bit Source Jianhua Yu, Lew Katz Fred Followill and Gerard T. Schuster.
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
The Future of Nuclear Waste Management, Storage, and Disposal Thanassi Lefas 26 November 2008 ChE 359 Energy Technology and Policy.
Task Force meeting #29, Lund, November Task 8 1 Some ideas for continuation of Task 8 Task 8 is intended to lead to:Task 8 is intended to lead to:
Changes in the Directional Drilling And Surveying Markets.
Posiva Oy Olkiluoto Eurajoki Puh. (02) 8372 (31) faksi (02) DOPAS Demonstration of Plugs and Seals Posiva Plug Experiment POPLU at URCF.
Jun Cao Institute of High Energy Physics, Beijing Daya Bay Neutrino Experiment 3rd International Conference on Flavor Physics, Oct. 3-8, 2005 National.
- D TR ADPE / A © FORCE shale seminar 18 &19 Sept Stavanger Stress determination and pore pressure measurements performed at the Meuse/Haute-Marne.
November 11, 2004 Biogeohydrological Environment and Physical Aspects of the Henderson Mine Site Climax Molybdenum Company Henderson Operations.
Devico in Zinkgruvan, Sweden. Zinkgruvan mine Owned by Lundin Mining Zinc Lead, silver, copper Greatly folded mineralization Ore body varies from 700.
Tecto Energy Pebble Creek Geothermal Project Outline Outline  World Geothermal Power Status  BC Geothermal Prospects  Pebble Creek (North Meager) Prospects.
Handling of Future Human Actions in the safety assessment SR-Site Eva Andersson.
Core orientation in vertical holes. Vertical hole in Portugal Ground investigation for mine shaft 1250m deep (planned) 5m radius Drillcon drilling contractor.
1 1 Dr Jan Wright Parliamentary Commissioner for the Environment 10 December 2012 Strategic issues facing New Zealand and overview of report on fracking.
Plus an Introduction to the: Institute of Earth Science & Engineering RESOURCE INDEX MAPPING: Getting the Right Data for the Right Model.
The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.
Geo-Engineering In North Wales A Study of the A55 Between Chester and Anglesey.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Nuclear safety regulatory structure Finland NNRP Workshop July 4-6,2011.
Slide 1 A Carillion plc company. 30 th September 2008 SAFESPUR and Brownfield Risk Management Forum Radioactive vs Non-radioactive Contamination – Tools.
Hydro power 16.3 % Wind power 0.1 % Peat 6.9 % Other renewable 11.4 % Nuclear power 26.8 % Natural gas 10.3 % Coal 14.1 % Oil 1.9 % Net imports 12.2 %
CDDA AGM ‘Deep Hole Innovations’ C. Drenth & C. James  Variable Wall Coring Rod  Fast Descent Core Barrel*  Alpha Stage3 Diamond Bit* * Patents.
Outokumpu Deep Drill Hole Mica schist Pegmatitic granite Serpentinite, skarn, black schist = Outokumpu assemblage Depth (m)Lithology Main ore belt Prot.
Clear thinking on Nuclear: Waste disposal 1.One site for high-level radioactive waste is easier to monitor, regulate, and secure 2.A repository will provide.
Nuclear Power Plants  There are over 500 worldwide that produce 1/6 of the world’s power.  In the U.S. there are over 100 and they produce about 20%
11 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 15 – 18, 2015 Breakout Session Summary Failure Rates and Failure.
EXPERIMENTAL RESEARCH ON NUCLEAR WASTE DISPOSAL Disposal of Spent Nuclear Fuel from NPP Krško Tine LOGONDER.
Slim Borehole Scanner (SBS) An Update
Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Procedures and.
How sustainable is North America's energy future? What role could/will nuclear power play in North America?
Geothermal Energy Renewable Resources. Introduction to Geothermal Energy OjV26Q
AREVA’s Reactor Projects: Building on Experience Kathy Williams, Chief Financial Officer AREVA Inc. July 29, 2014.
1 António Pereira Fysikum The backend of the nuclear fuel cycle in Sweden.
Core orientation in vertical holes
$150K Chicago/ANL seed funding for Braidwood site investigation
INTRODUCTION A method of rotary drilling in rock, usually for exploratory purposes using hollow diamond-crowned bits to obtain a core for examination.
Electro Pulse Boring (EPB): Novel Rock-breaking Technology for
The Future of Nuclear Waste Management, Storage, and Disposal
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
True or False: Suppose the graph of f is given
Radioactive Waste and Spent Fuel Management in Hungary
NUCLEAR ENERGY What is it?
Nuclear safety regulatory structure Finland
Handling of Future Human Actions in the safety assessment SR-Site
Finding the Optimum BHA through Data Analytics & Modeling
DOWN HOLE SURVEY CC Supplier Portfolio.
Presentation transcript:

Devico AS Olkiluoto September, 2007

Olkiluoto nuclear power plant Olkiluoto Nuclear Power Plant is one of Finland's two nuclear power plants. The Olkiluoto plant consists of two reactors each 860 MW. One 1720 MW reactor is under construction. Supposed to start in 2011.

Onkalo All nuclear waste produced in Finland must be disposed in Finland. Olkiluoto has been determined to become the site of disposal of Finnish nuclear waste. Long term project, intend to start up in 2020.

Repository Access tunnel: 5.5 km tunnel 1:10 Main characterisation level –420 m Lower characterisation level –530 m Repository Ventilation shaft

Depth: 530 meter deep. The ventilation shaft will be reamed up later. Our drilling demands was less than 1,75 meter deviation from vertical axis.

Olkiluoto 2005 Devico was first time hired in 2005 in Olkiluoto for a similar project Successful results, no survey shows more than 2 meters deviation from vertical axis. 3 steerings on the way down.

SMOY Worked in cooperation with SMOY. - Diamec U8 drill rig. - NQ rods. - Triple tube Corac N3/50. 2 shifts – App. 25 days to finish the borehole.

Directional drilling Challenges: - Stringent demands - Find the correct direction. - Find the toolface. Solutions: - Accurate surveying. - Repeated and overlapping surveying. - Some statistical approaches.

Statistics DepthDirectionInclination

Statistics DepthDirectionInclination

Drilling Drilled two sections à 9 meters meters: Dogleg setting 2.5 / Dogleg app meter: Dogleg setting 2.5 / Dogleg app. 5 No return water. Dark, very hard granite. Almost without fractures, but quart veins.

Results – meters. DeviFlex PeeWee Smoy’s EMS North - East

Conclusion - Possible to orientate hole within stringent demands. - Some “confusing” survey results. - Important to know the steering capabilities of the DeviDrill in the rock. - Teamwork, teamwork! Easy cooperation on the drill site in this project.

Thanks for the attention!