RTF5018A Assess Trees 1. Determine tree survey program requirements.

Slides:



Advertisements
Similar presentations
Accident and Incident Investigation
Advertisements

Barhale Procedure for Site Establishment
Problem solving methodology Information Technology Units Adapted from VCAA Study Design - Information Technology Byron Mitchell, November.
National CAD Standard In a world where globalization is invading and distinction is becoming the rule, We feel the urge to pass some of the knowledge.
Informed consent: What if I get it wrong? Greg Hill ACLCA – 17 February 2011.
1 Writing Landscape Unit Objectives 2 Planning for Old Growth Retention Data Preparation Delineate OGMAs Develop WTR Targets Write LU Objectives Establish.
Tailing Dams – A Consultants Perspective
HERITAGE - LOCAL GOVERNMENT by Susan O’Neill. Heritage - Local Government Strategic heritage planning – identifying and listing heritage items and translating.
ICASAS305A Provide Advice to Clients
Operator Performance Appraisal Byron Tilly RS Unit Manager, SEPA.
BASICS OF SURVEYING Ivy Tech Community College. Surveying Definition DEFINITION The art and science of making such measurements as are necessary to determine.
Presented By: Wasel A. Al-Muhammad 24 December 2002 by Ahmad I. Al-Musallami MS Thesis: CEM, KFUPM, 1992.
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Health and Safety.
UK’s CDM Regulations 2007 and its Applications in Singapore
TRAINING SOLUTIONS RISK ASSESSMENT For more information contact Victoria: (Tel) (Fax) ( )
Codex Guidelines for the Application of HACCP
Problem Solving Methodology
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
CADASTRAL DATA FOR NATIONAL HERITAGE MANAGEMENT..
Brownfields Odell Zeigler, Katie Dilbeck, Shirley Green, Genarde Garnica.
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
Tendering in Poland. INTRODUCTION Company Setup Tendering Project Delivery.
Obligations and Practices Information Session April 2013 regulations PRIVATE CERTIFICATION FOR PLANNING ASSESSMENTS.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
The Design Brief How to Write. Any step can be revisited throughout the Product design process 1. Identify client, user, need, problem or opportunity.
Road safety audits on mining operations Damir Vagaja Manager Mining and Resources ARRB Group.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Problem solving methodology Information Technology Units Adapted from VCAA Study Design - Information Technology Byron Mitchell, November.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
1 Identifying Properties at Risk of Flooding Duncan McLuckie Principal Flood Specialist NSW Office of Environment and Heritage Department of Premier and.
Sample Codes of Ethics in Adventure Tourism
CDM ( Construction design and management). The Construction (Design and Management) Regulations 2007 (CDM) are there to : improve health and safety in.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
National Science Foundation. Seeking Doctoral Dissertation Support from the National Science Foundation: Do’s and Don’ts Program Officer Political Science.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
How to Read Site Plans and Development Plans Mary Pennock, Principal Planner Lee Garman, Principal Planner 2014 Commonwealth Planning and Zoning Conference.
د. باسم ممدوح الحلوانى Lecture 3 Scope Management.
Private Sector  Buildings and structures built for ordinary people.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Copyright © 2007 Pearson Education Canada 1 Chapter 18: Completing the Tests in the Acquisition and Payment Cycle: Verification of Selected Accounts.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
Unit 11.2a: Data Quality Attributes Data Quality Improvement Component 12/Unit 11 Health IT Workforce Curriculum Version 1.0/Fall
Types of Heritage Buildings Other structures Archaeological sites Moveable objects Plantings Heritage areas & landscapes Intangible heritage HELP Symposium.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
14 May 2014 Information Security, Information Governance and the Law – Confidence in Compliance © Contact Leonardo for reuse
Owners Corporations Car Stackers, Online Info Land Victoria October 2013 Disclaimer The content of this Land Victoria presentation is provided for information.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Portmoak Community Council: Conservation Areas Rachel Haworth Conservation Officer – Design Conservation & Regeneration Team Planning Service.
Wetland Restoration Planning considerations New Forest Consultative Panel – 3 Sept 2015.
Land Surveying and Mapping Services in Dubai
Coleshill Parish Council Internal Audit Final Report
Desk Based Preconstruction – Planning
Tree Inspections for Real Estate Transactions
Auditor Training Module 1 – Audit Concepts and Definitions
Dissemination Workshop for African countries on the Implementation of International Recommendations for Distributive Trade Statistics May 2008,
Pedestrian Survey.
Scope management Chapter 5 Copyright ©2016 Pearson Education, Inc.
Tree related planning legislation
Heritage Protection Perspectives of Bathurst Regional Council
WHAT TO EXPECT: A CROWN CORPORATION’S GUIDE TO A SPECIAL EXAMINATION
Researching Historic Designed Parks and Gardens for Local Listing
CEng progression through the IOM3
Presentation transcript:

RTF5018A Assess Trees 1. Determine tree survey program requirements

Performance Criteria 1.Scope of survey is identified in line with client needs. 2.All current data relevant to survey requirements is identified, sourced and recorded according to enterprise guidelines. 3.Processes for data capture are identified in line with budgetary constraints. 4.Equipment for tree assessment is checked and prepared for use.

Scoping the Survey Why define the scope? –Cost –Methodology –Time requirements –Resources necessary –Limit the project to fixed requirements –Avoid conflict over ‘creep’ of survey –Meet statutory requirements

Types of surveys Single trees for residential properties Development applications Risk management for properties with lots of trees and users Environmental condition of sites prior to mining Heritage assessment Compensation and economic loss Aboriginality/cultural heritage Bushfire risk Planning for regeneration Verification of contractual requirements

Defining the scope Local government regulations –LEP’s and DCP’s Time frame for survey and report writing Legal access to construction sites Documentation to assist in survey What will not be included Copyright and intellectual property rights Methods and equipment used Costs Format of reports and number of copies

Residential surveys

Manage risk Client usually seeks professional advice to protect themselves or to remove a tree they believe is hazardous Owner of the property usually has a good historical knowledge Often emotive reasons and fears involved

Scoping a residential survey What do you need to define?

Cost Number of trees for that cost Information to collect relating to local government regulations TPO’s, LEPand arborist report guidelines Site information Aerial inspection? Boundaries and services Availability of relevant information Intention of the report and its audience

Development site surveys FROM THIS … To THIS!!!

Scoping surveys for development sites Site location Scale of survey – a few trees to thousands Degree of detail required Level of documentation required Timelines and what degree of documentation has been developed Accessibility Client – small or large, government or private

Documentation required Survey of existing site in detail with all trees shown on site Concept plans showing building layout, road and parking design Sections and elevations Drainage plans Earthworks plans (CC stage generally) Landscape Concept plans Environmental and geotechnical reports

Other documentation Conditions required by Council if DA has been lodged initially Client’s brief where no Council requirements have been provided or where the clients requirements are not normal practice Information on the users of the site and any legal issues relating to the development

Assessing risks & developing management plans Purpose of the report Possible legal ramifications of the survey and report Extent of the survey on the site What methods will be applied? Budget of client Time frames for completion/staging Human resources Physical resources Length of risk assessment cycle.

Determining heritage values Extent of survey in relation to heritage plan development Historic Data available Budget of client Purpose of survey Where is the information likely to end up? Cultural or natural heritage survey

Tree valuation survey Tree owner’s reasons for survey Budget and costs Method of survey required Availability of accurate parameters and historical information Data on frequency of use of the site

Cultural significance Generally sensitive to minority groups