Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.

Slides:



Advertisements
Similar presentations
Repository Analysis Review NSNFP Strategy Meeting Washington, DC Henry Loo April 2009.
Advertisements

1 Extension of Construction Authorization for the Mixed Oxide Fuel Fabrication Facility David Tiktinsky Senior Project Manager Division of Fuel Cycle Safety,
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Slide 1 NRC Perspectives on Reactor Safety Course Special Features of BWR Severe Accident Mitigation and Progression L. J. Ott Oak Ridge National Laboratory.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
> NRC Regulatory Information Conference March 12, 2009 AREVA NP Inc. 2 AREVA Perspectives on the Containment Sump Design and Downstream Effects for U.S.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy A History of Standardized, Multipurpose Canister.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
Performance-based demands ID seminar October Steffen Petersen PhD-student BYG.DTU and Birch & Krogboe.
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT Ed Freeman Engineering Manager 1.
Office of Nuclear Energy U.S. Department of Energy
GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
1 presented to National Governors Association Federal Facilities Task Force National Transportation Program: A Policy Perspective J. Kent Hancock, Director.
Carol L. Sohn Senior Nuclear Safety Advisor, Office of Science, SC-33 1 May 5, 2011 Review of Science Sites Hazard Categorization.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy Criticality Safety Assessment for As-loaded Spent.
November 9, 2005 Thomas Hill, NSNFP DOE SNF Canister Planned Activities.
13 th Nuclear Utility Meteorological Data Users Group Meeting Lessons Learned From Establishing Design- and Operating-Basis Regional Meteorological Conditions.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Rail Transportation Casks
1 Resuming Operations at WIPP Frank Marcinowski Acting Associate Principal Deputy Assistant Secretary for The Office of Environmental.
SNF/HLW Repository Acceptance Presented by Steve Gomberg Office of Systems Analysis and Strategy Development Office of Civilian Radioactive Waste Management.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Nicolas Solente Workshop on Regulatory Requirements to Ensure Safe Disposal of Disused Sealed Sources for Operators and Regulators Amman, JORDAN 7-11 April.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
IGD-TP Pilot Project on Operational and Construction Safety Status May 2014.
License Application Status Presented to: National Nuclear Spent Fuel Program Presented by: Joseph D. Ziegler, Director Office of License Application and.
November 9, 2005 Thomas Hill, NSNFP DOE Spent Nuclear Fuel Licensing Path Forward PacTec Review of Transportation Strategy for DOE Fuel.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 RIC 2009 Perspectives on Digital I&C Licensing in the 10 CFR 52 Environment Thomas R. Fredette, PE NRO/DE/ICE2 March 11, 2009.
Template Update on Progress of FY12-13 Work Plan Activities Presentation to the NETAC Policy and Technical Committees Sue Kemball-Cook and Greg Yarwood.
Presented to: National Spent Nuclear Fuel Program Presented by: Ned Larson, Director Infrastructure Development Division Office of National Transportation.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
DOE EM RAI and Contention Support NSNFP Strategy Meeting Washington, DC Henry Loo April 2009.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
EQuest Modeling Building Energy Systems Session 4: Building energy and modeling overview.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
LTP and FSS Plan Project Status Overview Presented by Bill Barley September 28, 2015.
Bringing together leading research institutions to advance electric ship concepts. Bringing together leading research institutions to advance.
April 13, 2005 Philip Wheatley Incorporation of HLW Activities Within the NSNFP.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
NFPA 805 AND CONFIGURATION MANAGEMENT JIM LECHNER JUNE 7, 2016.
Prescriptive vs Performance-Based Regulatory Approaches
Industry Guidance on Part 21 Evaluation and Reporting
Flooding Walkdown Guidance
NRC CM Pilot Inspections Methodology and Results
NRC Cyber Security Regulatory Overview
Complementarity of deterministic and probabilistic approaches
Vendor Technical Information
Presentation transcript:

Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD

2 YMCraun_DOE-NRC_ ppt Design Update  Design Status  Design Products Alignment  Path Forward

3 YMCraun_DOE-NRC_ ppt Design Status  NRC’s October 8, 2004, letter identified design information needs, which we are addressing  DOE/BSC reviews during the summer and fall of 2004 identified potential surface facility enhancements, based upon the design at that time  DOE has defined the work scope for design enhancements and schedules have been developed for those enhancements

4 YMCraun_DOE-NRC_ ppt Bases and Objectives for Enhancements  Continue development of the design for the operations approach (e.g., fuel in air)  Increase conservatism in Preclosure Safety Analysis (PCSA) (e.g., use of bounding versus mean values in Category 1 event sequence analyses)  Enhance the design solution (e.g., addition of fire suppression system)  Improve the documentation of how the design satisfies the design bases (e.g., reliability values)

5 YMCraun_DOE-NRC_ ppt Examples of Enhancement and Design Development Areas  Expand the design details for the site specific aging system  Define system boundaries for the important to safety (ITS) electrical system design  Advance the design of non-standard equipment to confirm Preclosure Safety Analysis reliability analyses  Evaluate potential effects of Non-ITS structures, systems, and components (SSCs) on Important to Waste Isolation (ITWI) SSCs  Issue aircraft hazard analysis  Issue seismic design methodology and preliminary facility seismic analysis  Enhance the thermal management strategy

6 YMCraun_DOE-NRC_ ppt Aging System  Existing dry storage system design(s) already certified under 10 CFR 72 –Evaluate existing storage system designs against YMP site specific criteria (with vendor support) –Determine extent of existing vendor Safety Analysis Report (SAR) analyses that are “bounding” for Geologic Repository Operations Area (GROA) conditions –Perform YMP-specific analyses where warranted (e.g., seismic)  Site-specific cask/canister system –Canister designed for direct emplacement after aging –Conceptual design based on existing waste package design configurations (Navy long waste package with pressurized water reactor (PWR) and boiling water reactor (BWR) waste package inner basket designs)  Design supported by the suite of calculations and analyses described in NUREG-1567 and NUREG-1536

7 YMCraun_DOE-NRC_ ppt Thermal Management Strategy  Develop waste package and drift loading plans –Plans will need to address key parameters (e.g., thermal, shielding, condition of fuel, and criticality)  Forms the bases for developing future technical specifications for waste package loading –Demonstrate technical flexibility and sensitivity in computer calculations and thermal models (e.g., subsurface thermal performance with waste package and drift loading operational approach)

8 YMCraun_DOE-NRC_ ppt Design Products Alignment  Content alignment issues between design and PCSA products –Driven by the need to incorporate mitigation as well as prevention features  Improved understanding of facility event sequences resulted in a re-classification of portions of the heating, ventilation, and air-conditioning (HVAC) and electrical systems as ITS –Driven by an improved understanding of ITS determination methodology

9 YMCraun_DOE-NRC_ ppt Design Products Alignment (Continued)  Transparency issues with design products –Issues related to clarity of bases for assumptions  Technical adequacy was not challenged  What did we learn –Improve documentation for selecting the design methodology and analysis inputs

10 YMCraun_DOE-NRC_ ppt Conclusion and Path Forward  Significant technical progress over the past year  Project focus –License Application readiness –Support to NRC information needs  Path forward – specific areas ready for technical interactions –Material handling –Building designs –HVAC systems