International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.

Slides:



Advertisements
Similar presentations
Global ATM Operational Concept
Advertisements

International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-102 Increased Effectiveness of Ground-Based Safety Nets SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
1 IATA / Airline Views on Performance Based Navigation Theo van de Ven/KLMAnthony van der Veldt/IATA Senior Manager Strategy & User ChargesAsst Dir Safety.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/7
Workshop on preparations for ANConf/12 − ASBU methodology
Global ATM Operational Concept
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Descent Operations (CDO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Trajectory-Based Operations(TBO) Saulo Da Silva
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance Workshop on preparations for ANConf/12 − ASBU methodology (Nairobi, August 2012) SIP/2012/ASBU/Nairobi-WP/16 A

2 Module N° B0-65 Optimization of Approach Procedures Including Vertical Guidance ICAO SIP ASBU WORKSHOP Summary -PBN-T: First step toward universal implementation of GNSS-based approaches. -Achieved through application of Basic GNSS, Baro VNAV, SBAS and GLS. Main Performance Impact KPA-01 Access/Equity, KPA-02 Capacity, KPA-04 Efficiency, KPA-05 Environment, KPA-10 Safety Operating Environment/Phases of Flight Approach Applicability Considerations This module is applicable to all instrument and precision instrument runway ends, and to a limited extent, non-instrument runway ends Global Concept Component(s) AUO – Airspace User Operations AO – Aerodrome Operations Global Plan Initiatives (GPI) GPI-5 RNAV and RNP (PBN); GPI-14 Runway Operations GPI-20 WGS84 Main dependencies NIL

3ICAO SIP ASBU WORKSHOP Module N° B0-65 Optimization of Approach Procedures Including Vertical Guidance Global readiness checklist Status (ready now or estimated date). Standards readiness (B0 - GLS CAT I only) Avionics availability Ground system availability Procedures available Operations approvals

4 Limited number of GNSS-based PBN implemented, compared with conventional procedures. ICAO SIP ASBU WORKSHOP Module N° B0-65 – Baseline

5 PBN-Terminal procedures require no ground-based Nav Aids. Allows designers complete flexibility in determining final approach lateral /vertical paths. States can implement GNSS-based PBN approach procedures with basic GNSS avionics with or without Baro VNAV capability, and for aircraft equipped with SBAS/GBAS avionics. Designed for runways with or without conventional approaches  providing benefits to PBN-capable aircraft. Key to maximum benefits is aircraft equipage. ICAO SIP ASBU WORKSHOP Module N° B0-65 – Change Brought by the Module

6ICAO SIP ASBU WORKSHOP Module N° B0-65 – Intended Performance Operational Improvement Access and EquityIncreased aerodrome accessibility CapacityRemoval of requirement for sensitive and safety- critical areas resulting in increased runway capacity. EfficiencyBenefits of lower approach minima: fewer diversions, over flights, cancellations and delays resulting in reduced fuel burn Environment Reduced CO 2 SafetyStabilized approach paths CBAAircraft operators and ANSPs can quantify the benefits of lower minima by using historical aerodrome weather observations and modelling airport accessibility with existing and new minima. CBA is positive

7 Documents providing background and implementation guidance for ANS providers, aircraft operators, airport operators and aviation regulators: – PBN Manual – GNSS Manual – Annex 10 – PANS-OPS Volume I – Manual on Testing of Radio Navigation Aids (Doc 8071) Volume II – Quality Assurance Manual for Flight Procedure Design (Doc 9906) ICAO SIP ASBU WORKSHOP Module N° B0-65 – Necessary Procedures (Air & Ground)

8 Avionics – PBN approach procedures can be flown with basic IFR GNSS avionics – Basic IFR GNSS receivers integrated with Baro VNAV functionality to support vertical guidance to LNAV/VNAV minima – Aircraft with SBAS avionics can fly approaches with vertical guidance to LPV minima, as low as ILS Cat I minima – Aircraft require GBAS avionics to fly GLS approaches Ground Systems – SBAS-based procedures do not require infrastructure at the airport, but SBAS elements (e.g. reference stations, master stations, GEO satellites) must be in place – A GBAS station can support vertically guided Cat I approaches to all runways at that aerodrome ICAO SIP ASBU WORKSHOP Module N° B0-65 – Necessary System Capability

9 Training in the operational standards and procedures are required for this module Likewise, the qualifications requirements are identified in the regulatory requirements ICAO SIP ASBU WORKSHOP Module N° B0-65 – Training and Qualification Requirements

10 Regulatory/Standardization: – No new or updated regulatory guidance or standards documentation is needed at this time. Approval Plans: – No new or updated approval criteria is needed at this time. Implementation plans should reflect available aircraft, ground systems and operational approvals ICAO SIP ASBU WORKSHOP Module N° B0-65 – Regulatory/Standardization Needs and Approval Plan (Air &Ground)

11 Standards – ICAO Annex 10 — Aeronautical Telecommunications, Volume I — Radio Navigation Aids. As of 2011 a draft SARPs amendment for GLS to support Category II/III approaches is completed and is being validated by States and industry. Procedures – ICAO Doc 8168, Aircraft Operations. Guidance Material – ICAO Doc 9674, World Geodetic System — 1984 (WGS-84) Manual; – ICAO Doc 9613, Performance-based Navigation (PBN) Manual; – ICAO Doc 9849, Global Navigation Satellite System (GNSS) Manual; – ICAO Doc 9906, Quality Assurance Manual for Flight Procedure Design, Volume 5 — Validation of Instrument Flight Procedures; – ICAO Doc 8071, Manual on Testing of Radio Navigation Aids, Volume II — Testing of Satellite-based Radio Navigation Systems; – ICAO Doc 9931, Continuous Descent Operations (CDO) Manual. Approval Documents – FAA AC (), TSO-C129/145/146() – ICAO Doc 4444, Procedures for Air Navigation Services — Air Traffic Management; – ICAO Flight Plan Classification; – ICAO Doc 8168, Aircraft Operations; – ICAO Doc 9613, Performance Based Navigation Manual; – ICAO Annex 10 — Aeronautical Telecommunications; – ICAO Annex 11 — Air Traffic Services; – ICAO Doc 9674, World Geodetic System — 1984 (WGS-84) Manual ICAO SIP ASBU WORKSHOP Module N° B0-65 – Reference Documents

12 Optimization of Approach Procedures Including Vertical Guidance Elements – APV with Baro VNAV – APV with SBAS – APV with GBAS To be reflected in ANRF ICAO SIP ASBU WORKSHOP Module N° B0-65 Implementation - Benefits and Elements Benefits - Main Key Performance Areas (KPA) KPAs AccessCapacityEfficiencyEnvironmentSafety ApplicableYYYYY

13ICAO SIP ASBU WORKSHOP