SiriusUVX LNLS – National Synchrotron Light Laboratory CNPEM – Brazilian Center for Research on Energy and Materials A R Rodrigues, M Lisboa, R Madacki.

Slides:



Advertisements
Similar presentations
USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
Advertisements

Short bunches in SPEAR J. Safranek for the SPEAR3 accelerator group November 2, 20101J. Safranek CLS THz Workshop.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Particle-Driven Plasma Wakefield Acceleration James Holloway University College London, London, UK PhD Supervisors: Professor Matthew wing University College.
Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
Beam Dynamics Tutorial, L. Rivkin, EPFL & PSI, Prague, September 2014 Synchrotron radiation in LHC: spectrum and dynamics The Large Hadron Collider (LHC)
BROOKHAVEN SCIENCE ASSOCIATES Radiological Design Considerations of Synchrotron Radiation Facilities P.K. Job Radiation Physicist National Synchrotron.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Status and new developments at ASTRID2 ESLS XXII, Grenoble 25-26/ Niels Hertel, ISA University of Aarhus, Denmark.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
AS Diagnostic Collaboration Mark Boland
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Page 1 Review 09/2010 Overview of MEIC Electron Collider Ring Yuhong Zhang.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
FFAG Accelerators for Proton Driver Alessandro G. Ruggiero Brookhaven National Laboratory FFAG 2007, Grenoble, France April 12-17, 2007.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
3 GeV, 1.2 MW, RCS Booster and 10 GeV, 4.0 MW, NFFAG Proton Driver G H Rees, ASTeC, RAL.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
CEPC Booster Zhang Chuang, Cui Xiaohao September 11,2015.
FCC-ee booster: preliminary design study Dmitry Shwartz BINP
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
MAX IV linac overview and scope of automation Sara Thorin.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Longitudinal Top-up Injection for Small Aperture Storage Rings M. Aiba, M. Böge, Á. Saá Hernández, F. Marcellini and A. Streun Paul Scherrer Institut LER’14,
Investigation of Injection Schemes for SLS 2.0
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Status of HESR 18th March Gießen Dieter Prasuhn.
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Sara Thorin, MAX IV Laboratory
A.Lachaize CNRS/IN2P3 IPN Orsay
Status and prospects of VEPP-5 Injection Complex
Estimation and Protection on Synchrotron Radiation in CEPC Main Ring
CEPC Injector Damping Ring
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
Injection design of CEPC
Presentation transcript:

SiriusUVX LNLS – National Synchrotron Light Laboratory CNPEM – Brazilian Center for Research on Energy and Materials A R Rodrigues, M Lisboa, R Madacki CNPEM Sirius the next LNLS synchrotron light source

Storage ring Booster LINAC Partially removable roof for ID and frontend installation 10 chicanes Sirius the next LNLS synchrotron light source

Sirius the next LNLS synchrotron light source

Building occupation

ParameterValueUnit Energy3.0GeV Maximum current500mA Circumference518.25m RF frequency500MHz Straight sections (SS), number x length 10 x 7 10 x 6 mmmm Emittance (without IDs)0.28nm.rad Harmonic number864 Bending field (dipoles / ”superbends”)0.58 / 2.0Tesla Critical energy from “superbends”11.7keV superbend, HxV11 x 4.0μm2μm2 short SS, HxV33 x 1.4μm 2 twenty-fold 5-bend achromat Storage ring specifications

ParameterMulti-bunchSingle-bunch Energy150 MeV Relative energy spread (rms)< 0.5 % Pulse charge> 3> 1nC Pulse width100 to 300< 1ns Repetition rate22Hz LINAC specifications

Parameter Extraction energy3.0GeV Injection energy150MeV Current2.0mA Circumference496.8m Revolution period1.66μs Cycling frequency2Hz Harmonic number828 Booster specifications

septa Storage ring Booster LINAC 150 MeV Linac 3 GeV Booster Injection system

Booster 3 GeV Storage ring 150 MeV LINAC Critical spots: BI – booster injection (150MeV) BE – booster extraction SI – storage ring injection Bulk shielding for the injection region

Copper vacuum chamber  26 mm, 1mm wall Booster ejection local shielding 15 cm steel Synchrotron radiation collimator (steel) Chicane Concrete 2.35 g/cm³ Bulk shielding geometry used in simulations FLUKA simulations

Bulk shielding geometry used in simulations FLUKA simulations RF waveguide passage Chicane

FLUKA simulations Bulk shielding geometry used in simulations

Injection losses at each septum in topup mode (localized) SeptumLosses Electron energy Incoming electrons Incoming power Expected losses at this point [GeV][e¯/h][W][e¯/h][W] BI20% E E BE20% E E SI20% E E BI: booster injection septum BE: booster extraction septum SI: storage ring injection septum Lifetime and ramp losses (distributed) Electron energyExpected losses [GeV][e¯/h][W] Storage ring E Booster0.15 to 3 GeV6.6E Estimated electron losses worst case (3 GeV)

Injection losses inside the SR/booster tunnel during normal operation (topup) Estimated electron losses

FLUKA x Swanson without steel local shielding Swanson0.2μSv/h FLUKA0.2±0.1μSv/h With 4.2e+11e¯/h on the target Simulations with FLUKA Booster ejection without the local shielding BE Swanson*43μSv/h FLUKA**8.8±1.0μSv/h With 4.2e+11e¯/h on the target *Thick target ** 2mm thick copper chamber

Without steel plate1.7±0.6μSv/h With steel plate1.1±0.2μSv/h With 4.2e+11e¯/h on the target Dose-eq [pSv/e¯] Effect of the 15 cm steel plate (FLUKA) Without steel plate8.8±1.0μSv/h With steel plate1.7±0.2μSv/h With 4.2e+11e¯/h on the target Simulations with FLUKA

Chicane Chicane with steel plate shield 0.05±0.01μSv/h 15 cm steel plate Chicane Simulations with FLUKA Tunnel chicane

RF cavity waveguide chicane FLUKA simulations Waveguide chicane Waveguide chicane with steel plate shield 0.2±0.06μSv/h

Preliminary situation Dose limit goal: 1 mSv/yr for all workers Accidents: local shielding Calculations and strategies are going on

Thank you very much for your attention! 20