10/9/2014LCWS14 : Accelerator : ADI / M. Woodley1 / 14 Status of ILC Decks.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.
Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
October 27, DESY TBR Central Region Integration Issues 1 Mark Palmer Cornell University.
Cost Impacts of two e- ML cycles at sqrt(s) < 250 GeV purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius,
Simulation of Positron Production and Capturing. W. Gai, W. Liu, H. Wang and K. Kim Working with SLAC & DESY.
Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
4/23/2015ALCW15 : Accelerator / M. Woodley1 / 30 TDR lattice (2015a) review and status.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Status of ILC Global Timing Ewan Paterson For Global Timing Working Group Masao Kuriki, David Rubin, Benno List, Ewan Paterson, Kaoru Yokoya LCWS 2014.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
(BDS) Lattice Integration Process at ILC Benno List DESY –IPP– BDS Lattice Webex Meeting B. List, (BDS) Lattice Integration at ILC 1.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
October 23, 2007ALCPG07 Accelerator Physics (Simulations) Parallel Session1 ILC Lattice Descriptions: The Big Picture M. Woodley, SLAC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
BDS Status Update Glen White, SLAC July ADI Fuze Meeting.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
THE NEXT LINEAR COLLIDER DAMPING RING COMPLEX J.N. Corlett, S. Marks, R. Rimmer, R. Schlueter Ernest Orlando Lawrence Berkeley National Laboratory, Berkeley,
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
N.Solyak, RTMLLCWS'11, Sept.26-30, Granada 1 Nikolay Solyak, Valery Kapin FERMILAB * CERN RTML upgrade New design of ILC RTML in central integration region.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
DR Interface to Sources and RTML
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
Specifications for Central Region Layout
ILC2016x 12/08/2016 LCWS2016 (Morioka, Japan).
ILC DR Lower Horizontal Emittance, preliminary study
ILC-CR-0004 Main Linac extension: Implementation status
LCLS2sc MAD files: Injector to Bypass Line
Status and Plan of GDE Design Work (Including Road Map for RDR)
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
LCWS2015 : Beam Dynamics / M. Woodley
Alternate Lattice for LCLS-II LTU Y
AD & I : BDS Lattice Design Changes
ILC BDS Emittance Diagnostics: Design and Requirements
Electron Source Configuration
Linear Collider Positron Source Update
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
ILC Baseline Design: Physics with Polarized Positrons
Central Region Working Group
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Lattice Session Summary
ILC - Global Design Effort
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley1 / 14 Status of ILC Decks

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley2 / 14 I last worked on ILC at SLAC in December 2007, doing lattice integration with Peter Tenenbaum and Andrei Seryi our last “official” release of ILC lattice description files (MAD8 Extended Standard Input Format), corresponding to the RDR, was designated “ILC2007b” - since then others have carried on the lattice work (SB2009, 2012 updates for CFS, the TDR) some things that have changed since I last did ILC work: -DESY’s ILC EDMS system (!) -offset Damping Rings in the central injector complex km circumference Damping Rings -Distributed Klystron Scheme (DKS) in Main Linacs -helical undulator for e+ production at high-energy end of e- Main Linac -relocation of e- MPS collimation and fast abort lines to u/s of the undulator -e- undulator-to-BDS dogleg line goals of present work: -collect set of most up-to-date decks which reflect the lattice described in the TDR -integrate deck sets for major subsystems (eSource, pSource, DRs, ELET, PLET) -reproduce TDR CFS geometry (EDMS Treaty Point coordinates) Perspective

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley3 / 14 EDMS: ILC TDR Design Register Thanks to Benno and to all who helped to assemble the brilliantly cross-referenced EDMS document archive!

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley4 / 14 EDMS: Treaty Point Definitions Absolutely essential!

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley5 / 14 subsystemssourcedoc / filecomments ESOURCEEDMSD* ,B,1,1 ES2012a.zip Design registry (exit of bunchers to end of ELTR) EDR / PDREDMSD* ,G,1,1 dtc04.zip DTC04 lattice ( m DR circumference) ERTML / PRTMLEDMSD* ,B,1,1 RTML2012a.zip KCS lattice EML / PMLDESY svn ilclattice-ml-dks _BL r234.tar.gz A. Valishev / B. List DKS lattice: svn branch: ILC2012dks_ML_3RFU_VK svn folder: ml-dks-BL EBDS / PBDSEDMSD* ,B,1,2 BDS2012b.zip Glen and Edu are updating the BDS Final Focus and dump line lattices PSOURCEEDMSD* ,B,1,1 ps-lattice-2012a.zip W. Liu / W. Gai TDR lattice described in IPAC2012 paper TUPPR041 Deck Files Obtained and Integrated so far

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley6 / 14 subsystemscomments EDREXT / PDREXT EDRINJ / PDRINJ created by MDW from: I. Reichel documents TDR text Treaty Point coordinate definitions PTURNsmall geometry changes in vertical dogleg (no matching) ELTL / PLTLconverted by MDW for DKS (no matching): lengthen ELTL FODO cell: m to m (ΔL = m) lengthen PLTL FODO cell: m to m (ΔL = m) UPTcreated by MDW (August 2014): END_EUND to target drift: L= m EBSY1 / EBSY2 PBSY1 / PBSY2 Redefinition errors discovered during “deck integration”: polarimeter chicanes were copied from *BSY2 to *BSY1 as separate laserwire detection chicanes names of elements (bends and drifts) were not changed names of parameters that defined bend and drift lengths were not changed values of parameters that defined bend and drift lengths were changed in *BSY1 files when *BSY1 file is loaded, LW chicane is 45.1 m long when *BSY2 file is loaded, LW chicane is redefined to be 76.9 m long (ΔL = 31.8 m) TDR CFS coordinates include BSY LW chicanes that are each 31.8 m too long PBDS is 0.95 m shorter than EBDS due to rematching between PBSY and PFFS TDR CFS coordinates include shorter PBDS Recreating the TDR CFS geometry

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley7 / 14 Damping Rings: Injection / Extraction From the TDR (v3.II, section 6.9):

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley8 / kickers Σθ = 1.2 mrad septum 1 & 2 BL = 18.1 kG-m bend BL = 21.9 kG 84 mm center of PDR INJ/EXT straight kicker #33 exit face septum 1 exit face TPS2DR X = m Y = m Z = m θ = rad Positron Damping Ring (DTC04): Injection

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley9 / kickers Σθ = 0.6 mrad septum 1 & 2 BL = 18.1 kG-m bend BL = 21.9 kG 42 mm center of PDR INJ/EXT straight kicker #1 entrance face septum 1 entrance face TPDR2RTML X = m Y = m Z = m θ = rad Positron Damping Ring (DTC04): Extraction

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley10 / 14 DR INJ/EXT straight centerline X= m Y e+ = m Y e- = m Z= m θ e+ = rad θ e- = π rad IP X= m Y= m Z= m θ e+ = π rad θ e- = rad e- systemse+ systems eSource + EDR + ELET + UPT + pSource + PDR + PLET undulator photons

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley11 / 14 e+ target ΔX = mm ΔY = mm ΔZ = mm |Δ| = mm TPS2DR ΔX = mm ΔY = mm ΔZ = mm |Δ| = mm IP ΔX = mm ΔY = mm ΔZ = mm |Δ| = mm Close-up: Central Region Note: e-/e+ path length difference, modulo the DR circumference, is m (Ewan and Benno reported m at the August ADI meeting … ) TES2DR ΔX = mm ΔY = mm ΔZ = mm |Δ| = mm

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley12 / 14 To Do List gather and integrate the remaining files -dump lines, abort lines, auxiliary source (?), … deck “cleanup” -remove unused stuff -eliminate redefinitions -make sure names are unique and follow some kind of naming convention -split magnets consistently -redefine deck “numbering” sequence check and fix the matching throughout -i.e. ELTL/PLTL, eSource, pSource -earth’s curvature following and vertical dispersion compensation decide how to handle lattice modifications that effect the CFS geometry -EBSY/PBSY laserwire chicane lengths -converting e- fast abort line in EBSY to DC tuneup line (?) -e-/e+ path length / global timing adjustments aim for a controlled and fully documented release of a complete “ILC2014a” deck set

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley13 / 14 Conclusions and Outlook using DESY EDMS system and SVN repository, MAD8 input files corresponding to the TDR for the major accelerator systems of ILC have been gathered and (partially) integrated -eSource, pSource, DRs, ELET, PLET the geometry of these systems has been verified to match the current CFS layout (sub- millimeter errors at Treaty Points) re-matching (Twiss) has been started … I’m presently working on the Source systems -LTRs need work after re-matching comes “deck cleanup” and standardization then comes documentation I estimate approximately 4 weeks of full-time work remains to be done to complete a packaged set of files (similar to ILC2007b) that can be released to EDMS, so an “ILC2014a” release in calendar 2014 seems possible … depending on funding and other commitments (i.e. LCLS-II, FACET, FACET-II, … )

10/9/2014LCWS14 : Accelerator : ADI / M. Woodley14/14 From the TDR …