1 GOES-R Series Program Update OCONUS Proving Ground Meeting Anchorage, Alaska Greg Mandt GOES-R System Program Director May 12, 2015.

Slides:



Advertisements
Similar presentations
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Advertisements

Dave Ector COSMIC PM for OSD 4 November 10
Dawn space probe launched September 28, 2007 Dawn lifted off at 7:34 am at Cape Canaveral Air Force station Florida. It is a project of the U.S.A and.
Jeffrey Kronenwetter PLT Director PLT Coordination & Field Campaign Preparations.
NWS Use of Direct Broadcast Geostationary Weather Satellite Data
Kennedy Space Center Shuttle Operations Team New Employee Orientation Training KLASS.
DSCOVR Overview Mike Simpson and Doug Biesecker COPC November 4, 2014.
GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010 Vanessa Griffin Project Manager,
Launch Procedures No-Go Criteria 1.Winds exceeding 10 knots steady from any direction 2.Cloud ceiling below 10,000 ft AGL 3.Data acquisition systems not.
Constellation Orion Visible Light Constellation Orion Infrared Light.
July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.
California's first Delta 4-Heavy arrives at Vandenberg AFB, CA The three Common Booster Cores and the cryogenic upper stage to comprise the West.
COMSTAC Launch Operations Support Working Group October 24, 2006 Jim Ball Spaceport Development Manager NASA Kennedy Space Center Spaceport Development.
NASA Goddard Space Flight Center Direct Readout Laboratory NPP/JPSS HRD/LRD Status Patrick Coronado NASA Goddard Space Flight Center directreadout.sci.gsfc.nasa.gov/ipopp.
Hosted by: ATIA Executive Director, David Dikter ATIA Director of Programs, Caroline Van Howe ATIA Conference Marketing Manager, Andrea May ATIA Conference.
Progress Report 2010 John Parker Chairman, Get Ready Central Florida.
1 GOES-R Update Greg Mandt System Program Director GOES User Conference 3 Nov 2009.
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
“BUILDING SUCCESS WITH S..T..E..M” (S CIENCE, T ECHNOLOGY, E NGINEERING & M ATH ) Presented by Scientist Wardell Huff And Sharon Huff April 2014.
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Kennedy Space Center Spaceport Engineering and Technology.
The crew of the space shuttle Columbia wave before boarding January 16. They are leaving the Operations and Checkout Building at the Kennedy Space Center.
Rachel Weintraub Public Affairs Officer & TV Producer NASA Goddard Space Flight Center More information:
Space Shuttle Columbia By: Stephanie Benson. The Space Shuttle Columbia.
The Proving Ground Regional Combines. Mission Statement The Proving Ground was created to provide legitimate on court exposure opportunities for rising.
1 Commercial Crew Program The Next Step in U.S. Space Transportation Brent W. Jett October 11, 2012 Commercial Crew Program - Same Crew…New Ride.
Satellites. Satellites that are circling the Earth and orbit at a speed matching the Earth’s rotation There are currently two in orbit They monitor and.
CALIFORNIA WELCOME CENTER ORANGE COUNTY Initiative.
National Suborbital Education and Research Center (NSERC) Web site: Northern Great Plains Center for People and the Environment University.
Air Operations Branch Director Course Status Boards & Situation Maps U.S. AIR FORCE AUXILIARY U.S. AIR FORCE AUXILIARY.
Mrs. W. Smith Throughout time man has dreamed of space travel. Science fiction movies and books are full of tales about travel to other planets.
The Messenger By:Nathan.M (launched in 2004) Perpose. The Messenger was a satellite that was launched to mercury to unlock the secrets of mercury, or.
2015 OCONUS Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES-R Ground.
Invitations are mailed approx 4-6 weeks prior to launch All guest activities will be outlined Driving directions and map (from local areas) Transportation.
Probabilistic Technology Initiative for NASA Pam Caruso Technical Assistant to the Director, Engineering NASA/Marshall Space Flight Center Presented to.
LRO/LCROSS Launch Preview How Where When Presentation for NASA Solar System Ambassadors and Museum Alliance March 20, 2009 Brooke Hsu, LRO E/PO Lead Brian.
NOAA Science Week – Kansas City, MO. 30 April 2012 Non Export-Controlled Information GOES-R – System Validation and User Readiness Planning Stephen D.
1 AAE 450 Spring 2008 Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site.
Federal Aviation Administration 1 FAA AST Overview Presentation Federal Aviation Administration Overview of the Federal Aviation Administration.
NOAA Satellite Direct Readout Conference Welcome! – to the 2011 NOAA Direct Readout Conference! Kathleen Kelly Director, Office of Satellite Products and.
Greg Mandt GOES-R System Program Director 2011 OCONUS MEETING July 26, 2011.
AWIPS Readiness for New Satellite Products Mike Johnson (NWS/OBS) OCONUS Proving Ground 13 May,
Redstone-mercury 3-freedom 7 By: Karlee Post Huntze.
© 2014 Orbital Sciences Corporation. All Rights Reserved. SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, Welsch.
Stephen Ambrose GOES-R Data Operations Manager (DOM) OSPO/SPSD March 12, 2013 GOES-R Ground Segment Project Data Operations Support Team System Validation.
PAO 1 Telecon THEMIS Public Affairs Status Telecon.
Mission Status - S. Ritz 1 GLAST The Gamma-ray Large Area Space Telescope Mission Status DC2 Kickoff 1 March 2006 S. Ritz Gamma-ray Large Area Space Telescope.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
The word "rocket" can mean different things. Most people think of a tall, thin, round vehicle. They think of a rocket that launches into space. "Rocket"
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
RSES – The HVACR Training Authority. Through RSES Membership Offering Timely Information Providing Certification Preparation Delivering Training and Education.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
GOES-R Launch Guest Ops
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
The Vehicle Assembly Building (VAB) construction in early 1965
With Island Leisure Travel
Construction Report March 25, 2010.
TEMPO’s Commercially Hosted Payload Concept
Laura Pereira Physics Project D, # 15 Mr. Pagani October 16, 2000
Space Travel Present & Future
Cassini Retrospective
Thermal Vacuum Test: Plans and Procedures
OC Remote Sensing of the Atmosphere and Ocean - Summer 2001
International Space Station Providers
Update to IEEE Publicity Committee
Update on EUMETSAT CEOS Plenary 2018 Agenda Item # 4.3
Presentation transcript:

1 GOES-R Series Program Update OCONUS Proving Ground Meeting Anchorage, Alaska Greg Mandt GOES-R System Program Director May 12, 2015

Program Accomplishments: Flight Project 2

3 Mechanical Ground System Equipment (MGSE) in TVAC chamber

Release Mission Management Flight Ready and Release Final Product Set Handover on April 30 th ! NSOF antennas complete! 4 W-2 Feed Assembly installation at WCDAS 4 Program Accomplishments: Ground Segment Project

5 The Road Ahead: Testing, Testing, Testing… 5

6 The Road to Launch! Launching From: Cape Canaveral Air Force Station, Florida Vehicle: United Launch Alliance Atlas V (AV-541) Pad: Space Launch Complex 41 Launch Date: March 15, 2016 Time: 6:08pm ET 6

7 The Road to Launch! Launch Guest Ops Planning Working with NASA and NOAA/NESDIS to organize all launch guest operations to include: – Guest invitations: process will start ~6 months prior to launch – Guest information packages – Exhibits – Guest briefings and VVIP briefings – Tours – Launch viewing sites and guest transportation OSB II – VVIP guests (400 maximum) Banana Creek – VIP guests (3,500 maximum) NASA Causeway – VIP guests Turn Basin – Employee car passes KARS Park - Public launch viewing site. Non-KARS members charged $5.00 per car. Stay tuned for more information as we proceed to launch

8 Post-Launch Testing & Validation Launch and orbit raising: 12 days Level 1b products will be validated during Post Launch Test (six months) and will be available through GOES-R Rebroadcast (GRB) service as products are certified Level 2+ product certification begins after L1b products and will be distributed on a product-by-product basis as they mature GOES-16 extended validation: Sept 2016 – March 2017 GOES-16 operational: March 2017 at TBD orbit location