Sharing of Inter-State Transmission Losses 11/29/2015 1.

Slides:



Advertisements
Similar presentations
A DISTRIBUTED CSMA ALGORITHM FOR THROUGHPUT AND UTILITY MAXIMIZATION IN WIRELESS NETWORKS.
Advertisements

Sharing of ISTS Charges & Losses Regulation
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
EIUG – Wheeling Methodologies
Routing in WSNs through analogies with electrostatics December 2005 L. Tzevelekas I. Stavrakakis.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
OIS Model TCP/IP Model.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
Single Phase Transformer
Billing, Collection and Disbursement Procedures
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
Sharing of Inter-State Transmission Charges and Losses (PoC Regime) Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Bulk Power Transmission System
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
Announcements Homework #4 is due now Homework 5 is due on Oct 4
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
1 APPROPRIATE PRICING OF TRANSMISSION A PRESENTATION BY SRLDC, BANGALORE.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Optimization of active distribution networks: design and analysis of significative case studies for enabling control actions of real infrastructures D.Moneta*,
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
Implications of Engineering Analysis Assumptions Organization of MISO States: CARP XII December 14-15, 2009 Nick Bowden: 1.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Point of Connection Methodology for Sharing of Transmission Charges.
Instructor :Kashif Mehmood
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Sharing of Inter State Transmission Charges Eastern Regional Load Despatch Centre.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Overview of Market Reforms and the WESM
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Implementation of Point of Connection (PoC) Methodology.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Point of connection Mechanism
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
Parul Institute Of Technology Name Of Subject:-Electrical Machines Name Of Faculty:-(1) Suresh Sahoo (2) Yogendra Tiwari E&C 3 rd Sem. Prepaid By :- Sr.No.NameEnrolment.
Transmission Losses Physical System Operations. Transmission Losses NERC’s definition(s): Electric System Losses Total electric energy losses in the electric.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Transmission Tariff Regulations. 1. ‘Applicant’ means a generating company or transmission licensee who has made an application for determination of tariff.
Open Access.
Open Access.
The New Texas Wholesale/Retail Market
Scheduling of Collective Transactions Through Power Exchange
Sharing of Inter-State Transmission Losses
Congestion regulations
POWER SYSTEM ANALYSIS INTRODUCTION.
Philosophy of POC Transmission charge
Presentation transcript:

Sharing of Inter-State Transmission Losses 11/29/2015 1

Introduction Losses are physical phenomenon while transportation of electric energy from generation to load  Fixed losses  core or iron losses in transformers,  losses in shunt devices such as shunt reactors, shunt capacitors etc  SVC, part of losses in HVDC terminals and other FACTS devices  Generally depend on system voltage and thus constant.  Variable losses (I 2 R)  Copper losses in transformers, transmission lines  Depend on load current  Load current varies with quantum of load and thus variable  Resistance of lines and thus on line lengths  In transmission system variable losses >> fixed losses  Thus generally losses proportional to load and distance of transportation 11/29/2015 2

Introduction  Development of ISTS system  : State systems connected with few inter-state lines,  : Development of Central Generators and their associated transmission system.  1991: POWER GRID came in existence and transfer of associated system to new company  Post 2k/2003: ISTS licensees  Treatment of losses  Individual line losses  Associated Transmission losses with individual generator  Pooled losses 11/29/2015 3

Introduction  Sharing of Transmission losses  : Based on drawal on individual lines on some mutual/collective understanding  : based on drawal or actual energy allocation from concerned generator.  1990: Regional Pooled losses with some exceptions in proportion to the energy drawal.  Post ABT: Estimated Regional Pooled losses in proportions to schedules from Grid.  In all above drawee utilities used to bear the losses  Inter-regional Transactions:  Regional (whether pooled or otherwise) losses and inter-regional link losses.  Inter-regional link losses merged with regional pool  Thus regional postage stamp for losses. 11/29/2015 4

Introduction  Other changes  Sharing of losses for some state networks  In schedules….. SR  In actuals… NR  Operation of ‘POWER EXCHANGES’ in 2008  Based on point of connection (connection to which region)  Injector /drawee both have to bear losses  Wheeling region losses only if studies prove it. 11/29/2015 5

New Regulation for sharing of losses CERC Regulation on sharing of ISTS charges and losses  Regulation notified in in June 2010  NLDC has prepared procedure in compliance with Regulation 6(1)  Formation of Implementation committee and various meetings of Implementation committee  Validation Committee  Final approval of the commission for implementation  To be implemented w.e.f 1 st April /29/2015 6

International Practices Prevalent Losses settled  Paid  In kind  In Money  Settled  For each balancing period  on daily, weekly or yearly  Paid by  Only drawee  Both injector and drawee  In some adhoc ratio 50:50 or 45:55  Loss allocation factors may have two component  Fixed and variable(based on location, season, time of the day)  Paid based  on after the fact  on figures declared upfront 11/29/2015 7

Issues in Recovery of Transmission Losses System Operation Requirement  Losses are physical in nature and thus to be supplied in real time  Loss compensation shall be as actual losses in real time so that proper load generation balance is maintained. Market Operation Requirement  Losses to be known in advance (as longer as possible)  to plan for future scenario  to make bid/price strategy  Calculation of individual payout is easy.  Whole process is transparent  Allocation is fair Overall requirement  Administration of losses is easy 11/29/2015 8

Loss sharing Methods…explained in literature Loss allocation is a complex issue. To date no single loss allocation method has been universally accepted to be the most precise or the best one. Globally, different markets adopt different loss allocation schemes which suit their market structure. Various commonly followed methods are  Pro rata allocation  Proportional sharing  Marginal / Incremental loss allocation  Loss allocation methods using the admittance matrix  Each of the above mentioned method has its own advantages and limitations. 11/29/2015 9

Loss sharing Methods… Pro rata allocation This is the method presently being followed in India. Under this, the loss is shared among the beneficiaries on pro-rata basis in a pre-defined manner, based on schedules/shares. It is relatively a simple method to use, however this does not take in to account the geographic distribution of the loads and the generators and is not sensitive to distance and direction. Since the losses are socialized, the calculations are simple and clear. 11/29/

Loss sharing Methods… Proportional sharing In this method it is assumed that the inflow of power in to the bus is to be proportionally shared by all the out going feeders and the tracing of power between the generator and the load is to be achieved. It works on the principle that the loss of each line is to be shared by the loads in proportion to the power flow attributable to them and the respective losses are to be borne by the generators or the load. However the assumption of the proportional sharing of power may not always meet the electrical power flow laws and power tracing may also give erroneous results, particularly in the situations like loop flows and under such situations more assumptions have to be made to trace the power flows. 11/29/

Loss sharing Methods… Marginal / Incremental loss allocation Under this method losses are determined on the logic that any marginal change in bus injection/drawl leads to marginal change in the losses. Choosing of slack bus and handling of negative loss allocation etc, are some of the issues of this method 11/29/

Some further References IEEE Trans Power System pp May 2000 A Physical flow based approach to allocating transmission losses IEEE Trans Power System pp Feb 2000 Allocation of transmission losses to bilateral contracts IEEE Trans Power System vol16 pp Feb 2001 Z 'Z' Bus loss allocation IEEE Trans Power System vol 17 pp Feb 2002 Incremental transmission loss allocation under pool dispatch.... IEEE Trans Power System vol 15 pp Feb 2000 Fair allocation of transmission power losses IEEE Trans Power System vol17 no3 pp Aug 2002 Transmission loss allocation: A comparison of different practical algorithms. 11/29/

Procedure for sharing of losses based on June 2010 regulation of CERC Procedure for Sharing of ISTS Losses  Prepared by NLDC in compliance with Regulation 6(1) The procedure aims to keep computation:  Simple  Non-Recursive Loss Application on Regional Basis  In line with existing practice  No Pan caking. Injection and withdrawal loss would be calculated for each zone. 11/29/

New Methodology Point of Connection Losses  Independent of Contract Path 50% PoC losses + 50% Uniform Losses Uniform Loss component  Based on Regional Losses of last week Moderation of Losses  Based on Actual Regional Losses of last week and Losses based on studies 11/29/

PoC Loss Computation (1) Computation of changes in losses in the system due to incremental injection / withdrawal at each node. Loss Allocation Factor 11/29/

PoC Loss Computation (2) Output of System Studies  Loss Allocation Factor  MW Losses of each node  Weighted average losses (%) for each region Zonal Loss : Weighted Average of losses at each node Moderation of Zonal Losses One PoC Loss for each entity per week 11/29/2015 NRLDC 17

Loss Sharing Mechanism 11/29/2015 NRLDC 18 Zonal Losses as Computed from Hybrid Method Calculation of Previous week Losses from SEM Data Total Losses based on PoC Software Provided by CERC Total Losses (50% PoC+50%UC) Moderation Of PoC Losses

Moderation of Losses (1) Need of Moderation  Difference in actual and study scenarios  Correct computation of injection and drawal schedule of various utilities.  Scheduled losses to be closer to actual losses in the system so that system mismatch is avoided.  Minimizing the mismatch between UI payable and receivable Moderation at regional Level Moderation Factor = Actual Losses of previous week (A act ) ( In %) Regional Losses based on Studies (A s )(In %) 11/29/

Regional Losses Based on Studies (As) Weighted average Actual losses of a region Actual Transmission losses (in MWh) in Regional ISTS, L = ∑Injection of Regional Entities G + ∑Interregional injection I) - (∑Regional Entity drawals +∑Inter- regional drawals) Actual Percentage Regional losses, l = L*100/ (G+I) This would be computed for each 15 min time block and then averaged for each week. 11/29/

Application of Losses in Scheduling Net PoC Loss = 50% Moderated PoC Loss + 50% Uniform Loss Net PoC Loss to be applied on each regional entity Drawee Entity to bear full losses for :  Long Term Transactions Injecting Entity and Drawee Entity to share losses for:  Medium Term Transactions  Short Term Transaction  Collective Transactions  Bilateral Transactions 11/29/

Case I : Intra-Regional Long Term Transactions 11/29/ A B 100 MW MW Zone Moderated Loss (%) A3 B5

Case II : Inter Regional Long Term Transactions 11/29/ B A Zone Moderated Loss (%) A3 B5 100 MW 97 MW MW

Case III : Long Term Transactions Involving Wheeling Region 11/29/ B A 100 MW MW 97 MW Zone Moderated Loss (%) A3 B5

Case IV : Intra-Regional Medium / Short Term Transactions 11/29/ A B MW 95 MW Zone Moderated Loss (%) A3 B5 100 MW Contract

Case V : Inter Regional Medium/Short Term Transactions 11/29/ B A Zone Moderated Loss (%) A3 B MW 100 MW 95 MW 100 MW Contract

Case VI : Medium/Short Term Transactions Involving Wheeling Region 11/29/ B A MW 95 MW 100 MW 100 MW Contract

Thank You!