Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel

Slides:



Advertisements
Similar presentations
Background on Gigabit Ethernet ECE 4006 C G3: Karen Cano, Scott Henderson, Di Qian Dec,
Advertisements

ECE 4006 Presentation on Preliminary Results Group: G3 Member: Karen Cano, Scott Henderson, Di Qian.
Optical Link Budget ECE 4006 Gb Ethernet Optoelectronic Links.
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Final Report 1394b:Optoelectronic Data Communications Group G9: Tiffany Lovett, gte291r Tornya Moore, gte668r Mareisha Winters, gte824t ECE 4006C April.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Honeywell Advanced Photonics Development Overview ATLAS Meeting January 7, 1999 John Lehman Honeywell Technology Center
Final Presentation ECE 4006 C G3: Karen Cano, Scott Henderson, Di Qian April,
ECE 4006 Senior Design Project Talal Mohamed Jafaar Ibrahima Bela Sow Mohammad Faisal Zaman Gigabit Ethernet for the Masses.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 1 Vinh Nguyen January 9, 2005.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 This Week’s Highlights The optical link budget almost finished Website up on the ECE domainWebsite Yahoo Group set.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet: An Affordable Solution Preliminary Design G4 Gaurav Asthana James Denaro.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 5 Vinh Nguyen February 24, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Design Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
ECE Group 2 – Presentation 8
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Come and be a member of our website.
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
ECE 4006 CAPSTONE DESIGN R.Y.M.M.Y Georgia Institute of Technology
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
1394b Design for Gigabit Optoelectronic Data Communication
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
ECE135 Group 2 – Presentation 3
Capstone Design Update
Optical Gigabit Ethernet
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Group 5 – ECE 4006: Week 2 Jason Young 5/2/2019.
Task List Group management plan Background studies
Gigabit Ethernet Design ECE – Spring 2004
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Presentation transcript:

Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel Senior Design Project: Group IV 10 Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel

SO FAR, SO GOOD… Website is up on ECE domain. Finished building Maxim receiver board. Researched PD and VCSEL vendors and prices of parts.

GANTT CHART

Soldering…

TECHNICALLY SPEAKING… VCSEL Characteristics Photodiode Characteristics

VCSEL Characteristics 802.3z Standards Vendor: Honeywell   Speed (Gbps) Slope Efficiency (mW/mA), at 850 nm Threshold current (mA) HFE4384-522 (SC connectorized) Minimum 1.25 0.06 1.5 Typical 0.15 3.5 Maximum 0.3 6 http://standards.ieee.org/getieee802/download/802.3-2000.pdf http://content.honeywell.com/vcsel/products/datacom.stm

Photodiodes 802.3z Standards Vendors: Hamamatsu and Lasermate   Speed (GHz) Responsivity (A/W), 740 nm Capacitance (pF) Active Area (mm, dia.) S7911 (unconnectorized) Typical 2 0.47 0.45 0.1 S7912 (unconnectorized) 1.5 0.85 0.2 RSC-M65A306 (connectorized) Minimum 0.35 -- http://standards.ieee.org/getieee802/download/802.3-2000.pdf Hamamatsu: http://www.hpk.co.jp/eng/products/ssd/PDF/3/S7911,S7912_KPIN1041E02.pdf Lasermate:http://www.lasermate.com/ReGaAs.html

COMING UP NEXT… Continue researching vendors for parts. Completing building and testing of Maxim test board. Order parts from vendors.

QUESTIONS?