Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee August 28, 2013 Mira Vowles, P.E., CEM.

Slides:



Advertisements
Similar presentations
Energy-Efficient Process Cooling
Advertisements

Partnership Gwinnett + Southeast Green Series- Debunking Energy Efficiency Myths: Why your bottom line depends on Energy Efficiency Property of VIS VIVA.
Emerging Technology Field Test 1 February 5, 2015 Brown Bag Mira Vowles, BPA Wesley Saway, BPA.
Ductless Heat Pumps in Residential Applications Proposed Research Plan.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 28, 2011 Mira Vowles, P.E., CEM.
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
Evaluation of Energy Savings for Strip Curtains Presented To RTF Scott Moore PECI Sr. Engineer June 2, 2009.
Deeming Savings for Ductless Heat Pumps in Manufactured Homes Regional Technical Forum January 4 th, 2011.
Review Tabled Agenda Item: Additional M&V Data on Ag Pump VFD Projects Determination of M&V requirements and/or deemed savings Regional Technical Forum.
VRF for the Seventh Plan Preliminary Approach and Data for a Variable Refrigerant Flow Measure for the Seventh Plan Regional Technical Forum January 21,
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee April 25, 2012 Mira Vowles, P.E., CEM Emerging.
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Emerging Technology Update Presented To Conservation Resources Advisory Committee June 4, 2014.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Prioritization of VC HP Measures Variable Capacity Heat Pump Measure RTF Sub-Committee June 22, 2011 meeting.
Hawke’s Bay Refrigeration
1 SIMPLIFIED VOLTAGE OPTIMIZATION M&V PROTOCOLS Regional Technical Forum August 4, 2009.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee March 27, 2013 Mira Vowles, P.E., CEM Emerging.
Energy Free Stock Tanks Review of Existing Deemed Savings Regional Technical Forum July 7, 2009.
EDISON INTERNATIONAL® SM Internal Use Only Page 1 Circulating Block Heater Alfredo Gutierrez Cal TF Work Paper Presentation October 23, 2014.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Desuperheaters on Residential Air-Source Heat Pumps
How a Heat Pump Works By: Adam Meeker. What is a Heat Pump? A heat pump is a device which transfers heat energy from one place to another.
Regional Technical Forum October 9, ECMs for Compressor Head Cooling Fans  Measure –Retrofit of compressor head cooling fans on low temperature.
Standard Information Workbook (SIW) Update Proposal Regional Technical Forum May 13, 2014.
Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
N O R T H A M E R I C A C O M M E R C I A L TDP
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Deemed Savings Update: ECMs in Display Cases Ben Cartwright PECI January 5, 2009.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
Variable Capacity Heat Pump RTF Sub-Committee
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum September 17, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
Forecasting and Verifying Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum August 20, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee June 12, 2014 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 27, 2013 Mira Vowles, P.E., CEM.
1 Analysis of Cost and Savings Values for Revised Energy Star Dishwasher Specifications June 6, 2006 Revised August 8, 2006.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Measurement and Verification of Refrigeration Measures in 4 Grocery Stores in Pacific County Presented to the Regional Technical Forum August 8 th, 2006.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Alternative Incentive Approaches BPA Energy.
Northwest Power and Conservation CouncilProCost Version 2.2 RTF July 2007.
Ron Domitrovic Program Manager, Energy Efficiency Variable Capacity HP Subcommittee 8/28/2013 Load Based Testing for Unitary HVAC.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee September 25, 2013 Mira Vowles, P.E., CEM.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee July 24, 2013 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee May 7, 2013 Mira Vowles, P.E., CEM Emerging.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump Sub-Committee Road-Mapping Session BPA Energy Efficiency.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
Wood Smoke: Monetizing Health Benefits Regional Technical Forum August 23, 2013.
ECAM M&V Examples For Packaged Equipment Bill Koran, P.E. Director of Energy Analytics, NorthWrite Inc.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Product/Service Area : HEATING, VENTILATION, AND AIR CONDITIONING VCHP Energy Efficiency Measure Development Roadmap Barriers Action Items Resources TI.
Research Strategy: Residential Ductless Heat Pumps Research and Evaluation Subcommittee Christian Douglass and Josh Rushton January 8, 2016.
A Calculator for Reliably Measuring the Savings from Advanced RTU Control Retrofits August 27, 2015 Presentation to: RTF Commercial Rooftop Unit Working.
Action Plan for Variable Capacity Heat Pump Technology
Variable Frequency Drive Savings Calculator Tools
Variable Refrigerant Volume
Presentation transcript:

Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee August 28, 2013 Mira Vowles, P.E., CEM Emerging Technology Project Manager BPA Energy Efficiency

Slide 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Meeting Topics 1.VC HP Overview (Mira) 2.VRF System ECAM Analysis (Eva) 3.Load Based Testing (Ron) 4.ASHRAE HQ VRF System (Ali) Plus if time allows: Other VRF research projects (all) Suggestions for future meetings (all)

Slide 3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pumps (VC HP = VRF + DHP) + Ductless Heat Pumps Variable Refrigerant Flow Heat Pump System

Slide 4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Refrigerant Flow (VRF) Systems VRF systems, either heat-pump or heat-recovery models, provide heating and air-conditioning, with: 1.Inverter driven outdoor-unit compressors and condenser fans, providing improved part-load and low-ambient performance, 2.Multiple indoor-units with multi-speed fans, electronic expansion valves and integrated thermostats, 3. Refrigerant piping network for heat transfer, 4.Integrated control system, and 5.Ventilation provided by VRF system, natural ventilation or a dedicated outside air system (DOAS).

Slide 5 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N VC HP Sub-Committee 1.Sub-Committee of the Regional Technical Forum (RTF) 2.Purpose: develop and recommend VC HP measures with a)high consensus methodology to estimate and verify electrical savings b)specification for cost effective installations that ensures persistent savings 3.Minutes and presentations are posted at:

Slide 6 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Sacramento Drill Tower Data BEFOREAFTER

Slide 7 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA ECAM Analysis Energy Charting and Metrics tool FREE Excel Add In available at: IPMVP-Option C regression modeling of Monthly energy data Average monthly temperature (primary variable) Pre & post models of kWh/day vs. average monthly temperature ECAM model statistical validation metrics CV(RMSE) or Standard Error % >20% Fractional Savings Uncertainty <50% Residuals R2 > 75% Net Determination Bias<0.005%

Slide 8 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N VRF System ECAM Analysis Eva Urbatsch, BPA

Slide 9 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Sacramento Drill Tower Raw Data (VRF system installed in June of 2008) NAG kWh = natural gas therms, converted to kWh

Slide 10 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Sacramento Drill Tower Pre & Post Electricity Use

Slide 11 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Forensic Data Analysis These points occurred July-Oct 08 (immediately post-install) and May-June 09

Slide 12 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Sacramento Drill Tower Baseline & Post Models

Slide 13 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Sacramento Drill Tower Energy Use for a “normal” year Baseline: 374,405 kWh Post: 157,511 kWh Savings: 216,894 kWh

Slide 14 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Conclusions There is a VRF system startup learning curve! Natural gas savings ~94% of baseline Electricity savings ~20% of baseline Total savings ~58% of total energy use

Slide 15 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Load Based Testing Ron Domitrovic, EPRI

Slide 16 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N ASHRAE HQ VRF System Ali Beglar, Daikin

Slide 17 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Next Meeting: 9/25/13 at 10 am Potential topics: Other VRF research projects (all) Suggestions for future meetings (all)