Network Information System Advisory Committee NISAC Activities Report Briefing to the LTER IM Committee 26-Jul-2010 Wade Sheldon NISAC Co-Chair.

Slides:



Advertisements
Similar presentations
Do we need a GN of NGOs? Yes! (as far as participation in the GN does not reduce/affect involvement in the GP/DRR) The GN should build on existing networks.
Advertisements

Leon County Schools Performance Feedback Process August 2006 For more information
Policies and Processes for Limiting Conflict of Interest Patrick N. Breysse, PhD, CIH Johns Hopkins University Bloomberg School of Public Health Vice-Chair,
Sustainability Planning Pat Simmons Missouri Department of Health and Senior Services.
PATIENT-CENTERED OUTCOMES RESEARCH INSTITUTE PCORI Board of Governors Meeting Washington, DC September 24, 2012 Sue Sheridan, Acting Director, Patient.
Building the LTER Network Information System. NIS History, Then and Now YearMilestone 1993 – 1996NIS vision formed by Information Managers (IMs) and LTER.
Greek Orthodox Church of the Holy Resurrection Parish Development Proposal.
State of Kansas Statewide Financial Management System Pre-Implementation Project Steering Committee Meeting January 11, 2008.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
MAC Committee Update Robert Kondziolka, MAC Chair.
 Workshops: March & May 2011 and lots of VTCs! Details at:
THE HR APPRENTICERICHMOND THE HR APPRENTICE RICHMOND Marvelous Membership Mavericks.
LNO/IM Collaboration and Communication Work Group Looking for ways to enhance collaboration between LTER Information Managers (IMs) and the LTER Network.
SURAgrid Governance Committee Art VandenbergMike Sachon SGC ChairSGC Co-Chair September 27, 2007.
GWG Notes for and from IMC Annual Meeting September IMC 2010 GWG Meeting Agenda -Breakout Group #1 slides -Breakout Group #2 summary slides -Breakout.
Controlled Vocabulary Working Group PRESENTED BY JOHN PORTER.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
Network Information System Advisory Committee NISAC Review of the LNO ARRA Operational Plan Wade Sheldon & Will Pockman NISAC Co-Chairs.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
American Community Survey (ACS) Program Review Webinar March 6, 2012.
What’s in place now? The LTER By-Laws Version 3 (things do change over time) What do we need? Additional documentation - to define our Standing Committees.
Analysis of 2007 BOD Assessment Checklists Prepared by: Cambria Tidwell.
National Information Exchange Model Update for the Global Advisory Committee Spring 2008 Meeting April 10, 2008 NIEM Technical Architecture Committee (NTAC)
Decadal Climate Variability and Predictability Discussion of CLIVAR Research Focus Pan-CLIVAR Meeting, July 16-18, 2014.
VOCAB VTC Jan. 13, VTC Agenda Terms of Reference – take a look Planning: Use-Case and Vocabulary Database Workshop – Feb. –March 2011 Planning:
Creating a Team Vision Training Outcomes: 1.Identified strengths and contributions of each team member 2.List of each team members’ vision for the CTT.
1 Free Help: State Support Team Technical Assistance Services 2012 MIS Conference February 15, 2012 Corey Chatis, State Support Team Jan Petro, CO Department.
1 ARCSS eTown Meeting Friday, 22 April 2005 Tuesday, 26 April 2005.
IMC Business Meeting Elections/Nominations 2014 IMC meeting (Corinna) Outside partnerships (time permitting) –SGS (Nicole) IMC Annual Meeting 2013, BNZ.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
Ratemaking Research Working Party Stewart Gleason, Ph.D., ACAS, ASA, MAAA CAS Research Initiatives Coordinator Senior Vice President Guy Carpenter & Company,
Controlled Vocabulary VTC June 1, Agenda Review some past activities Plan some future activities.
 Finalize VOCAB “Terms of Reference”  Define use cases for the keyword database and its development  Develop procedures for capturing and managing.
Building the LTER Network Information System. NIS History, Then and Now YearMilestone 1993 – 1996NIS vision formed by Information Managers (IMs) and LTER.
Network Information System EML status of LTER sites Iñigo San GilSep IM meeting, Estes Park ‘06.
NOAA Cooperative Institutes John Cortinas, Ph.D. OAR Cooperative Institute Program, Program Manager NOAA Cooperative Institute Committee, Chairperson.
Network Information System EML status of LTER sites Iñigo San GilAug 5th 2005 IM meeting, Montreal ‘05.
GOVST-3, Paris, November 2011 GOVST Symposium, Review etc. Andreas Schiller, Eric Dombrowsky and Kirsten Wilmer-Becker.
EML Best Practices for LTER Site Metadata EML Best Practices Committee (Corinna Gries, Margaret O’Brien, Ken Ramsey, Wade Sheldon)
ADVANCE: A Bottom Up and Top Down Approach to Diversifying College Campuses Spurty Surapaneni, BA, Lisa M. Larson, PhD, Bonnie Bowen, PhD, Luiza Dreashear,
LTER GIS Working Group Update Adam Skibbe and Theresa Valentine 2012 June Water Cooler.
Collaborative Project Database Margaret O’Brien, Corinna Gries, Wade Sheldon, Jonathan Walsh, John Porter, Sven Bohm, James Brunt, Suzanne Remillard, Ken.
Maintaining a Vibrant SET Regional Team Special Topic on Leadership & Sustainability.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
IMC Business Meeting Elections/Nominations 2014 IMC meeting (Corinna) Outside partnerships (time permitting) –SGS (Nicole) IMC Annual Meeting 2013, BNZ.
The LTER Network Planning Grant Barbara Benson NTL-LTER.
IMExec 2010 Meeting Plan for IMC activities to complement LNO Operational Plan Outline requirements for the EML Conformance Checker and metrics for EML.
Long Term Ecological Research Network Information System LTER EML Status LTER Information Manager’s Meeting 28 July 2004 Mark Servilla
Network Information System Advisory Committee NISAC Activity Report 2007 LTER IM Meeting Wade Sheldon (GCE) Committee Co-chair.
Nominating Committee Discussion August 17 th 2012 Pamela Snyder P.E – Society Nominating Chair Nora Lin – Leadership Election Task Force Chair.
Award No: SES/SBE Project Title: Interoperability Strategies for Scientific Cyberinfrastructure: A Comparative Study Investigators: Geoffrey C.
1 Energy Vision Advisory Committee Q1 Meeting February 16, 2016.
Change Management A process for process change by Cory R. Peters Exelon PowerLabs.
STAKEHOLDER ENGAGEMENT PROCESS FOR ENERGY EFFICIENCY BUSINESS PLAN DEVELOPMENT March, 2016.
Master Plan Updates February 2015 Salem, Oregon
Strategies for NIS Development
Network Information System Advisory Committee (NISAC)
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
Loddon Campaspe Integrated Transport Strategy
Loddon Campaspe Integrated Transport Strategy
Continuum of Care Metropolitan Homelessness Commission
Strategy
How the College Council Works:
LTER Controlled Vocabulary Virtual WaterCooler - July, 2018
President Search “the most important work that this Board Will Ever Do” Our Next Steps: Search Firm and interim President Report to the Clark College.
Giving Every Lion and Leo a Voice
CWG Membership July 30-31, 2012 – Climate Working Group Meeting.
Presentation transcript:

Network Information System Advisory Committee NISAC Activities Report Briefing to the LTER IM Committee 26-Jul-2010 Wade Sheldon NISAC Co-Chair

Network Information System Advisory Committee Briefing Outline Current Committee Membership Fall 2009 – Spring 2010 NISAC Activities Current Priorities NISAC Feedback on IMC Activities Discussion IMC Representative Rotation, Terms, Timing Other Issues

Network Information System Advisory Committee Current Committee Membership Current members (IMC reps in bold) Will Pockman (SEV) Co-Chair Wade Sheldon (GCE) Co-Chair Karen Baker (CCE/PAL) Barbara Bond (AND) James Brunt (LNO) Chuck Hopkinson (PIE) John Porter (VCR) Mark Servilla (LNO) Ex-Officio John Vande Castle (LNO) Kristin Vanderbilt (SEV) Bob Waide (LNO) Libe Washburn (SBC) 2010 Rotations John Briggs (KNZ) – withdrew, not replaced Wade Sheldon, Kristin Vanderbilt, John Porter

Network Information System Advisory Committee Fall 2009 – Spring 2010 Activities Nov-Jan 2010: Review of LNO Operational Plan Identified six areas of concern Approach to NIS development unidirectional and insular NIS development isolated from LTER science activities Importance of standardization not emphasized Utility of NIS for LTER site operations not emphasized Minimal level of site support and service Software development approach/timelines too long EB + NISAC + IM-Exec reps met with LNO and external review team in Jan 2010 Changes to OP in response to review Communication plan Earlier releases of NIS software with incremental additions Tiger Teams for community engagement during development

Network Information System Advisory Committee Fall 2009 – Spring 2010 Activities Jan-Feb 2010: Review of LNO NIS progress EB set formal review metrics for LNO in mid-2009 NISAC asked to review progress on seven NIS mile-stones No major issues identified, but somewhat pro- forma because tasks dictated by OP, LNO CA NISAC asked EB for opportunity to review future metrics beforehand (granted)

Network Information System Advisory Committee Fall 2009 – Spring 2010 Activities Mar 2010: NISAC Spring Meeting Reviewed 2010 NIS milestones for Jan 2011 review of LNO progress by EB/NISAC Briefings and discussion of IMC working groups Unit registry, Controlled keyword vocabulary, Web Services Discussion of final OP Communication plans to engage IM and domain scientists in PASTA development Utilization, planning, recruitment strategies for Tiger Teams (incl. feedback on NIS website text) Discussion of CI Implementation Plan Updated plan to reflect recent developments (OP) Discussed final document needs, plans

Network Information System Advisory Committee Fall 2009 – Spring 2010 Activities Mar 2010: NISAC Spring Meeting (cont.) Reviewed committee membership policies Recommend increasing to 6 domain science reps with 3-4 year terms, approval by EB/SC)  Harder to schedule  Represent broader constituency  Need more time to get up to speed on CI concepts Recommend 4 IMC reps with 2 year terms, with automatic extension to 4 years for IMC Co-chair Recommend 3 LNO reps (ED, CIO, NIS) with indefinite terms Reviewed potential COI issues Recommend greater transparency regarding discussions, votes with potential COI Deal with COI by abstaining from votes or not participating in discussions (ala NSF panels, as did during NISAC OP review)

Network Information System Advisory Committee Fall 2009 – Spring 2010 Activities Apr-May 2010: Science Council Discussed need to return to domain science reps to represent NISAC at SC Recognize Mark Harmon had more impact when promoting tiered trajectory and EML than IMs Barbara Bond selected to co-present NIS report (with James Brunt, Mark Servilla) Put out call to get involved, join Tiger Teams NISAC working with LNO to “wordsmith” CI announcements, briefings for domain scientists (e.g. recent Tiger Team recruitment )

Network Information System Advisory Committee Current Priorities Wrapping up CI Implementation Plan Wrinkles: Most ideas now incorporated into ongoing concerns (OP, IMC planning, legacy data/data synthesis prospectus) ISSE on uncertain ground at NSF (i.e. latest panels???) Will focus on short document to continue to serve as road-map (Wade Sheldon) Continuing to help craft OP communication plan, identify/recruit Tiger Teams Major role for NISAC in evaluation OP progress

Network Information System Advisory Committee NISAC Feedback on IMC Activities Unit registry (Karen Baker et al.) Support continued development, integration into PASTA to support conversions Controlled keyword vocabulary (John Porter) Recommend moving forward with candidate list of 640 words (endorse IM-Exec’s recommendation as product to EB) Recommend periodic (but not too frequent) review by working group incl. domain scientists, and auditing of search metrics Recommend shifting attention to controlled attribute vocab. Web services working group (Wade Sheldon et al.) Recommend immediate support from LNO as part of database/web redesigns currently planned View as critical for network CI implementation Recommend IMC request resources as product-oriented working group ChemDB (Don Henshaw) Effort currently funded independently Long-term strategy to generate metadata, integrate with PASTA, ongoing support should be considered Good case-study for NIS products resulting from efforts outside LNO NIS

Network Information System Advisory Committee Discussion IMC Representation on NISAC How should IMC co-chair be selected? Most committees select on chairs from elected members NISAC tentatively proposing to have IMC select co-chair NISAC IMC Rep Terms 2 year terms proposed to allow more rotation (vs 3-4 for domain scientists) But many projects longer-term, argues for 3-4 year terms Need to balance Timing of IMC meeting vs NISAC meeting NISAC meets in March prior to SC, but IMC meets in Fall – only newest IMC rep sure to be on committee long enough to be co- chair, but least experienced Should IMC elect NISAC reps in Feb/Mar, or elect in fall but start terms in Feb/Mar, or ? Other Issues (feedback to NISAC)