MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Push Pull Considerations
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
SID Engineering Marco Oriunno (SLAC), Jan CLIC Workshop, CERN Toward the TDR.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Re-evaluating the Need for a anti-DID in SiD T. Markiewicz/SLAC SiD Optimization Meeting
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
About L* i.e. the distance between the end of the last quadrupole “QD0” and the IP Until now, L* has been different for SiD and ILD, -> due to detector.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
Octobre MPI Munich FCAL Workshop in Munich W. Lohmann, DESY The 14 mrad X-angle, two IPs The push-pull option The next calendar dates Where we are.
Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
SiD Engineering: Iron and Solenoid Design Kurt Krempetz (Layer 5) (Layer 1) VXD.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
SID MDI & Engineering Marco Oriunno (SLAC), May 28, 2013 ECFA Linear Collider Workshop 2013, DESY Toward the TDR.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Guinyun Kim (KNU, Korea) International Linear Collider Workshop 2010 Beijing, China, March 2010 Summary of Machine Detector Interface.
LOI Planning The Very Forward Region Tom Markiewicz/SLAC Takashi Maruyama/SLAC Uriel Nauenberg/UCB SiD Collaboration Meeting, Boulder, CO 19 September.
SiD IR & MDI Engineering Progress Prelude to a Discussion of Integration with ILD and Based on Marco Oriunno’s Jan 2008 Talk at SiD CM Tom Markiewicz/SLAC.
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
SiD MDI Marco Oriunno, SLAC ALCPG11 Eugene- Oregon, March 2011.
SiD Machine Detector Interface (MDI) Tom Markiewicz/SLAC ALCW 2015, KEK, Japan 23 April 2015.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
SiD Conceptual Engineering Status Report Kurt Krempetz (Layer 5) (Layer 1) VXD.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
Change Management Board Meeting V Kuchler 23 January, 2015.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Re-evaluating the Need for a anti-DID in SiD T. Markiewicz/SLAC SiD Optimization Meeting Updated
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 1 What is included in the Cost Estimates for the ILC Detectors? Peter.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
SiD MDI Update Topics for Discussion Tom Markiewicz/SLAC ILC BDS Meeting 15 May 2007.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
FCAL Takashi Maruyama SLAC SiD Workshop, 15 – 17 November, 2010, Eugene, Oregon.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
SiD Collaboration Meeting SLAC, December 2011
M. Sullivan Apr 27, 2017 MDI meeting
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
MDI Issues M. Sullivan For
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Changes to SiD since the DBD
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Radiation Physics requirements for the IR
Guinyun Kim (KNU, Korea) International Linear Collider Workshop 2010
A 12-min Introduction to The ILC Machine Detector Interface and SiD
Presentation transcript:

MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012

MDI Section Outline Red Subsections Requested by Editors Introduction –Functional Requirements IR Hall Layout Requirements and SiD Assembly Concepts –Vertical Access (RDR style) –Horizontal Access (Japan style) –Detector Access While on Beamline –Detector Access for Major Repairs Detector Exchange Via Sliding Platform –Platform design –Platform motion –Platform Alignment –Vibration analysis –Push Pull Detector Exchange Process and Time Estimate MDI SiD CM T. Markiewicz/SLAC 2 of 29 BeamPipe and Forward Region Design –LUMICAL, Mask, BEAMCAL, QD0 Support and Mechanical Alignment –QD0-QF1 interface –FSI Alignment of QD0 and QF1 –Vacuum –Feedback System –Higher Order Modes –Routing of Detector Services Impact on Adjacent Detector When SiD is Running –Radiation Calculations –Fringe Fields and Magnetics Backgrounds and FCAL Considerations **NOT in MDI Chapter** –Background estimates in VXD, Tracker, and Calorimeters

Take Away Point (from SiD Meeting) We could write text for this outline today All contentious issues resolved Detailed engineering design will continue When a call for a draft of text is required, a snapshot of progress on will be recorded MDI SiD CM T. Markiewicz/SLAC 3 of 29

DBD Status Draft of Common MDI Section Exists –Karsten Buesser –no comments from anyone else yet Draft of SiD MDI Section Exists –All Figures exist –Bibliography begun; needs improvement I plan to page through these drafts at the end of this talk to show current selection of figures MDI SiD CM T. Markiewicz/SLAC 4 of 22

DBD Source Material Engineering: –Marco Oriunno LCWS’11, Granada, SiD CM, ACFA12Korea LCWS Beam Pipe, FCAL, QD0 support, Vacuum, FB Hardware –Tom Markiewicz Korea ACFA12 which also summarizes SLAC MDI Mtg work –Vacuum (Mike Sullivan) –HOMs (Sasha Novokhatski) FSI Alignment: Keith Riles: SiD CM Feedback Performance: Glen White (ALCPG11, Oregon) Fringe Fields: Wes Craddock (LCWS10, Beijing) Radiation Studies Mario Santana (LCWS10, Beijing) Push-Pull Timeline: Marty: SiD LOI SiD Fwd-KILC’12 T. Markiewicz/SLAC 5 of 22

Reminder of “New” Technical Choices Assembly: –Advocating same assembly sequence whether in above ground hall or in Japanese tunnel –Based on a 215T crane (not 400T) –Liquefier on platform & QD0 chiller located on top of SiD LUMICAL Position, Central Hole & position of BEAMCAL & “R20”→ “R21.6 ”, SiD Fwd-KILC’12 T. Markiewicz/SLAC 6 of 22

Work in Progress Currently all subsections have text except: –Detector Access While on Beamline –Detector Access for Major Repairs –Routing of Detector Services –FSI Alignment of QD0 and QF1 –Vacuum –Higher Order Modes Need improved text for –Radiation Calculations –Fringe Fields and Magnetics Need some addition text on –Alignment SiD Fwd-KILC’12 T. Markiewicz/SLAC 7 of 22 Do not know what to write for this

Questions & Issues Marco has large collection of high quality 3D CAD engineering and assembly images –Have we selected correct images for MDI –Which others should be included In MDI chapter In other chapters To first approximation all supporting documentation is in the form of talks on INDICO –No detailed papers with text exist –Page count will exclude generating adequate supporting documentation from the DBD excercise SiD Fwd-KILC’12 T. Markiewicz/SLAC 8 of 22

Document Size Currently 13 pages (assigned limit = 10) –Probably will be at 20 when 1 st pass complete Not integrated (yet) with common MDI session Not integrated yet with TDR CFS or TDR BDS –Should it be? –It is thought that CFS will be in charge of Site requirements for vibrations & earthquakes Hall layouts Platform design Platform motion system design –It is thought that BDS will be in charge of QD0 engineering & requirements SiD Fwd-KILC’12 T. Markiewicz/SLAC 9 of 22

Technical Reviews Review of MDI by VTX, Tracker, FCAL editors, SiD Mgmt –Accuracy, completeness Review of CFS and BDS by MDI? –e.g. CFS specifies 400 T cranes –Current CFS draft is 4x over page limit and has Inadequate and illegible figures –Asian Hall Figure 13.8 –Vertical Access Hall Figure (3D) –Vertical Hall Layout Floor Plan –Slab Invert deflection Figure Thought: –Do we want a stand alone “MDI” document to capture all detail? SiD Fwd-KILC’12 T. Markiewicz/SLAC 10 of 22

End of DBD Report Marco’s talk has many of the Assembly Images we may want to incorporate into the DBD My Daegu MDI Talk has many slides that can also be figures Can Flash Through these talks to Remind You of Slides We May Want to Use SiD Fwd-KILC’12 T. Markiewicz/SLAC 11 of 22