Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

January 6. January 7 January 8 January 9 January 10.
ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
Chubaka Producciones Presenta :.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
Introduction & News SCT Weekly during ID Week Dave Robinson Cambridge University.
Recirculation Concept - Cyclotron Radio frequency alternating voltage Hollow metal drift tubes time t =0 time t =½ RF period D-shaped.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Stefan Schlenker, CERN ATLAS Post-LS1 Operations Workshop, 24th June 2013, CERN DCS Tools during ATLAS Run 1 Questionnaire Results Stefan Schlenker, CERN.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
1 ATLAS Readiness for Run 2 C. Gemme (INFN Genova) ATLAS Collaboration CSN1 – venerdi’ 17 Aprile 2015.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
ATLAS micromegas activities (MAMMA)
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
CSN1 4 Aprile 06L.Mandelli1 Stato Generale di Atlas Aprile 06 Sottosistemi –Toroidi –Solenoide –Mu Barrel –Mu EC –LAr e Tiles –TRT –SCT –Pixel –LV1 –DAQ.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Victoria, Sept WLCG Collaboration Workshop1 ATLAS Dress Rehersals Kors Bos NIKHEF, Amsterdam.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
1 Cosmic commissioning Milestone runs Jamie Boyd (CERN) ATLAS UK Physics Meeting-- J Boyd Jan
ATLAS (Shift) Operations Documentation and Training 24 June 2013 S. Zimmermann, ATLAS Post-LS1 Operations Workshop 1 Stephanie Zimmermann.
The Calendar.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
Upgrade intro and report on DESY Upgrade Meeting 5 May 2010 Norman Gee.
The ATLAS detector … … is composed of cylindrical layers: Tracking detector: Pixel, SCT, TRT (Solenoid magnetic field) Calorimeter: Liquid Argon, Tile.
Short summary of ATLAS week. Really a lot has happened since the last ATLAS Plenary in Paris! Giant steps in the detector hardware construction, assembly,
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
June-18 th -2007ATLAS-MPI; Status of ATLAS Technical Paper, R. Richter1 The ATLAS Technical Paper and back-up papers  Content of the ATLAS technical paper.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
SRG Gantt Chart Template
Gantt Chart October November December Step One Step Two
Risultati del run di integrazione M4
Japan Participation in Phase-II TDAQ Upgrade
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.

McDonald’s Kalender 2009.
Detector parameters and modelling
RPC Readiness for installation
McDonald’s calendar 2007.

2 0 X X s c h e d u l e 1 MON TUE WED THU JANUARY 20XX FRI SAT SUN MEMO.
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
February 2007 Note: Source:.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Informational Writing
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
Event, March 19-24th 2013 Pressure.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1

Anatoli Romaniouk, TRT IB meeting October 30 th Preliminary plan for TRT/ID Meetings in February TRT meeting 3-5th February TRT institute We. 5thID ID combined 7th February ATLAS week February May-June ID commissioning WS May 19 th ATLAS June (outside) TRT meeting (outside?), 3 days June? October ATLAS 6-10 October (CERN) TRT meetings October TRT institute 15th October.I ID commissioning 13 October 2014 Milestone runs: M1: Feb M2: March 31-April 4 M3: May M4: July 7-11 M5: Sept 8-12 M6: Oct 13-17

Anatoli Romaniouk, TRT IB meeting October 30 th M-Runs: 21 Oc 2013S. Zimmermann, LS1-Weekly3 M1M2M3M4M5M6 PIX X1X1 X2X2 1 ready using events simulated at ROD 2 detector cold IBL X1X1 X2X2 1 ready using events simulated at ROD 2 detector cold SCT X1X1 1 detector cold TRT X LAR X TIL X L1Calo X1X1 (X 1 ) X2X2 (X 2 ) 1 Readout only. 2 Trigger part once LAR/TIL available CSC X1X1 X2X2 1 Old RODs, side A only 2 New ROD MDT X RPC X X provide trigger for M2 or latest M3 TGC X X 2 2 operating gas, trigger BCM X ALFA -- X LUCID -- X TRT starts 31 March-4 April

Anatoli Romaniouk, TRT IB meeting October 30 th Weeks 9 Oct 2013S. Zimmermann, ATLAS Week, Marrakech4 ATLAS out M1-6 ATLAS UpGrade P & P TRT ID TRT+ID ID-WS TRT out TRT+ID ATLAS outside ?

Anatoli Romaniouk, TRT IB meeting October 30 th Outside TRT WS 19th – 23rd May – ID Commissioning Workshop on Monday 19th May – ID Week 19-23rd May Uncoupled with ATLAS or upgrade weeks. Chosen because the pixel/IBL installation should be completed and commissioning is underway 13th – 17th October – ID Week, with commissioning workshop on Monday – Directly after ATLAS week at CERN 1.Do we want to have it? 2.When: of June? Other time? 3.Where? 4.3 possible places