1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
19 Sept 2005Flavio Dal Corso INFN-Pd1 MiniCrates Status Components Status (BTIM, TRB, CCB, SB) MC production: quantity and rate, past and future Production.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Status of the ATLAS MM project
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Aprile 2004Flavio Dal Corso INFN-Pd1 Drift Tubes Local Trigger Electronics Boards Production Status.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Fgasparini LHCC Review May 041 SUMMARY: Latest results on the Minicrate performance Status of chamber production Torino line The High Voltage Boards problem/status.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
M. Bianco On behalf of the ATLAS Collaboration
Status of NA62 straw electronics Webs Covers Services Readout.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 CSN 1 INFN LECCE 2003 BARREL MU: DT status Installation plan Minicrate test f.gasparini.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
NSW Electronics Preliminary Design Review Feb 2015 Introduction and Review Scope Feb 2015 NSW ELTX PDR S. Zimmermann 1 Stephanie Zimmermann.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
NSW SG 10 Dec Nov 2014 S. Zimmermann, NSW SG 1.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
CMS Drift Tubes Gruppi di Bologna, Padova, Torino G.M. Dallavalle
ESR for the muon DT Minicrate System
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
CMS November Upgrade Week
G. Carboni for the Muon Group
ESR for the muon DT Minicrate System
CMS RPC Endcap RE1 Status Report
CMS Goal of the experiment
Pierluigi Paolucci - I.N.F.N. Naples
TSF Upgrade Project Overview Resources Plans and Timetable
RPC Readiness for installation
Drift Tubes CSN1 1-2 April 2003 f.gasparini 22/04/2019.
Presentation transcript:

1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004

2 HVBoards plan : Plan to produce New Boards (9250 for wheels +1,0,-1,-2 and 1750 spares) PCB Production : fifty/fifty sharing between two companies (in Germany and Italy): A preseries of by end May and than delivery of alternate batches of at least 1200 PCB/month starting in 2 nd half of July. Assembly: assembled in IHEP at a rate of 1200/month (1 st batch back by end September to equip YB+1 chambers) 500 assembled in a back up site in Hungary at a rate of 50~60/month (first batch back by end October)

3 HVB STATUS Both firms are late, about one month, only 25 Boards delivered by the German firm on June 18th to Aachen. Expected delivery of 200 from Germany in the week of July 5 th Expected delivery of 200 from Italy in the week of June 28 th. 4 of the 25 assembled and tested at twice nominal tension : good Assemble the 25, put for a week in a chamber : check noise and crostalk for a week. If positive place the order of the first large Batch to the German firm at the beginning of July. The delivery time should be 4~5 weeks. This is enough to make a three weeks long test on a larger sample from the 400 of the preseries In case the test is positive ship to IHEP, in the second half of July, a number of 200 ~ 300 PCBs. Components for 2000 boards are already available but few,already ordered. Big orders for the full lot of components are being sent out.

4

5 MINICRATES; Read out part (ROB) assembled and tested in CIEMAT Trigger (TRB) and final Control (CCB),whose layer covers the ROBs, are installed in Legnaro (LNL) and,by September, also in Bologna. 10 R-out MC available in may, 16 more are due at beginning of July. Three Minicrates assembled in June : 1 MB1,1 MB2 and 1 MB3 The MB2 was shipped on June23rd to Bologna. The assembly in LNL depends on availability of CCB: the first 6, out of a preserie of 40, arrived on June 23rd with a delay of two months. They are fine. Green light given on June25th for the missing 34. They are expected by end of July. TRB for 5 Minicrates are available and tested from the first preserie (that showed a very bad yeld ) TRB for 7 more Minicrates delivered (two months delay) on Friday 18 th The test is planned the week of june 28 th.

6 The failures in the TRB are due to mistakes in the assembly, that is quite delicate. The rate of Boards to be “reworkwd” should reach few percent before entering into the mass production. It was 16% in the first preseries. In case the second preseries is approved a first batch of 200 TRB will be available in the second half of september. Summary: (if everything is fine): TRB for 12 Minicrates and CCB for 6 are available today in LNL Next CCB for 34 MC available at end July Next TRB for 30 MC available mid September The general plan is still that shown in the May LHCC meeting (next slide) Pictures of different phases of assembly of a MC are also included. The rate/site is expected to be 1MC/3 working days (~ 8 MC/month/site)

7 Install. Sequence YB+2 bot.start in the week of July 5 th (17~19 ch.) no MC Yb+2 Top up to Nov. 17 MC YB+1 Bottom Dec 19 MC YB+1 Top beg etc…… MC prod needs July >= 5 5 MB1 YB+2 top September >=17 17 complete YB+2 top October >= 33 Nov YB+1 bottom Dec YB+1 top Jan May YB+2,+1 and 0 Assume 200 TRB available by mid September Prod speed of readout MC: 12/month Prod speed of complete MC: sept. 12/month than 16/month 8 in Dec

8 Empty MC (central region) ROB TRB Cover & cables BTIm

9 Empty MC, services side TRB First cover & cables Final view

10 TORINO One (of two) tables fully operational: Assembled 4 SL (the first is a dummy without strips, 3 are complete, operational SLs) A 5 th SL under assembly ( at June 25 th ). Mechanics within the specs. Gas tightness and HV tests started, and completed for 1 SL. Assembly rate ~ 3 SL/month/table (in theory 1.5 ch./Month with 1 table) First SL in the second Table will be assembled in the 2 nd half of July

11 The graph shows the number of calendar days taken in the sites to assemble a SL (mechanics only). Torino reached the nominal figure of 15 c.d. at the first SL ( 9 w.d. = 14 c.d.)

12

13 40 chambers (80 Superlayers, of the largest MB4) have to be produced in Torino.. End inst.window (V 34.0) chambers needed ?achievable in Torino? Max min 5 ch in 04 than 2/month 1 July 05 (mag.test) 18 ( YB+2/+1/0 ) 10 ( YB0 may 05 ) 15 1 Mar. 06 (end SX inst.) 30 ( YB-2/-1 ) 20 ( no sectors1,7,10,12) 29 (dec.05 ) Sept.06 (end UX Inst) 40 ( sect. 1&7 ) 40 (may 06) 39 Actual rate in the 3 sites is 1.9 ch/month (23.3/year) INFN Milestone is 4 SL (2 ch) by July The Torino target