1. Sittwe Ch. 0.0 km Paletwa Ch. 158 Km Kaletwa (Ch 225 km Myeikwa (IM Border) Kyauktaw Bay of Bengal KolkataSittwe539 km SittwePaletwa158 km PaletwaKaletwa.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
Issue of NOC for setting up Retail Outlets Along NHs.
POWERLINKS TRANSMISSION LIMITED a joint venture of TATA POWER &POWERGRID.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Role of Geospatial Technologies in Roads and Highways 08 th February, th February, 2012 Atul Kumar Chief General Manager, NHAI Atul Kumar Chief.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
LUCIA MAR UNIFIED SCHOOL DISTRICT Facilities Update Facilities Master Plan & Sustainability Projects Information.
DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
LIST OF STAFF S.N o. Name of Employee Designati on Work Load Name of Work Sanction Cost (in Lacs) Work Executed up to date Remainin g work 1.Sh. A.B.
Mid Day Meal Scheme MDM-PAB Meeting-Assam 5 th March, 2015 Ministry of HRD, Govt. of India.
Mid Day Meal Scheme PAB-MDM Meeting – Nagaland Ministry of HRD Government of India.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
Emerging Opportunities in Port Sector By A. K. Mohapatra Secretary, Department of Shipping, Ministry of Shipping, Road Transport &Highways.
INLAND WATER TRANSPORT IN
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
POST CRISIS NEEDS ASSESSMENT (PCNA) MDTF 4 th STEERING COMMITTEE MEETING PROGRESS REVIEW ISU Planning & Development Department Government of Khyber Pakhtunkhwa.
Tracy Hatch Chief Financial Officer. Rochester Maintenance Facility & District HQ $16.1M request for Trunk Highway bonds Phase 2 will remodel 94,000 SF.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
Civil Works Progress ADB Loan No CAM(SF) / AusAID Grant No.0096-CAM 23 April 2012 GMS-SCCP Improvement of NR33 (15.83 Km Kg Trach to Preak Chak)
State Road Agency of Ukraine CO-OPERATION WITH THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.
Vukovar, December , 2012 EAEMDR Status Report Bulgaria.
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2014 till March 2015.
December 16, New Delhi. Contents  Background  Project Highlight  Power Allocation  Project Location  Gas Supply Network of.
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung.
1 Mid Day Meal Scheme Ministry of HRD Government of India PAB-MDM Meeting – Telangana on
Opening of the Panama Canal in 2016 Its Anticipated Impact on Global Soy and Grain Transportation Ken Eriksen Senior Vice September.
TMEA One Stop Border Posts (OSBP) Tanzania Country Programme Development Partners Dar es Salaam, 15 May 2013.
GNSS PROJECT (PHASE-I)
Fibre Processing and Manufacturing SETA (FP&M SETA ) Discretionary Grants : PROGRESS TO DATE.
Kentucky Transportation Cabinet
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
Pancheshwar Multipurpose Project Pancheshwar Development Authority (PDA)  In pursuant to Article 10 of Mahakali Treaty, Indo Nepal Pancheshwar Development.
GOVERNMENT OF TRIPURA TRIBAL WELFARE DEPARTMENT Presentation by Mr. L.H. Darlong, Secretary.
Public Hearing on Performance of Hospital Revitalisation Programme Grant April – September 2010 Department of Health Western Cape 20 October 2010.
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
Highway Utility Engineer, INDOT
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
Project Delivery Business Operations Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
EQ1 EQ 2 EQ 3 EQ 4 EQ 5 EQ 6 EQ 7 EQ 9 EQ 8 EQ 10 WQ 1 WQ 2 WQ 3 WQ 4 WQ 5 WQ 6 WQ 7 WQ 8 VPT – Lay out Map Proposed berths V C T P L NOM LPG CAVERN OHP.
Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon
EQ1 EQ 2 EQ 3 EQ 4 EQ 5 EQ 6 EQ 7 EQ 9 EQ 8 EQ 10 WQ 1 WQ 2 WQ 3 WQ 4 WQ 5 WQ 6 WQ 7 WQ 8 VPT – Lay out Map Proposed berths V C T P L NOM LPG CAVERN OHP.
Mid Day Meal Scheme MDM-PAB Meeting –HARYANA On
RBIG WORKSHOP 1 Supply Chain and Asset Management.
Indian Road Construction. ROAD TRANSPORT SCENARIO Economic Growth : 5 - 6% Road Transport Sector Demand Grows at 10 – 12% Need for Road & Transport Infrastructure.
An Introduction to Transportation Systems
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
National Waterway-2 Re-activation and Re-energizing (Proposed Action Plan)
Belgrade, December , 2013 EAEMDR Status Report Bulgaria.
Joint Report to Select Committee on Appropriations by Northern Cape Department of Health Northern Cape Department of Roads & Public Works supported by.
Task XV Extension: Task Status Report Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting New Delhi,
1 Mid Day Meal Scheme Ministry of HRD Government of India PAB-MDM Meeting – Andhra Pradesh on
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Construction Methodology for Suramadu Approach Bridge
Presentation on Ken – Betwa Link Project-Phase-II
Atal Mission for Rejuvenation and Urban Transformation (AMRUT)
Fort Worth Alliance Airport Runway Extension/
Mid Day Meal Scheme MDM-PAB Meeting Mizoram on
MDM-PAB Meeting –Sikkim on
PAB-MDM Meeting – Mizoram
State Infrastructure Bank
RIBA Plan Tom Robinson sir david Swindells Vii
FLOOD PROTECTION PROJECT IN THE ODRA AND WISŁA RIVER BASINS
Presentation transcript:

1

Sittwe Ch. 0.0 km Paletwa Ch. 158 Km Kaletwa (Ch 225 km Myeikwa (IM Border) Kyauktaw Bay of Bengal KolkataSittwe539 km SittwePaletwa158 km PaletwaKaletwa 67 km KaletwaMyeikwa (IM Border) 62 km Myeikwa (IM Border) Lawngtlai100 km LawngtlaiAizawl334 km Aizawl Lawngtlai NH 54 B A N G L A D E S H I N D I A Myanmar I N D I A Kaladan R. Kaladan Multimodal Transit Transport Project I W T ROAD IN INDIA ROAD IN MYANMAR DISTANCES

3 Project Components …post review  Fairway development / Sea-dredging in Sittwe port area  Construction of Port / IWT terminals at Sittwe  Fairway development / Dredging on Sittwe – Paletwa stretch of Kaladan river (158 Km)  Construction of IWT Terminal at Paletwa  Construction of 6 IWT vessels (300 ton each)  Highway (129 kms) from Paletwa to Indo-Myanmar Border.

4 Existing Sittwe Port Office

5 Existing Port at Sittwe

6 Existing Loading / Unloading at Sittwe Port

7 7 Progress made MEA issued Letter of Acceptance(LoA) to Essar Projects India Ltd. in April 2010 at a cost of Rs. 342 Crores (Approx US $ 75 millions) for the Port & IWT works. Agreement between MEA and Contractor signed in May Port & IWT works to be implemented in 36 months.

8 8 Govt. of Myanmar has provided land for Construction & Setting up of Contractor’s camp at Sittwe during Sep Permissions for import of Construction equipments & Opening of bank account in Oct Progress made… contd.

9 Ground breaking ceremony attended by Senior dignitaries from both countries held on 19 th December 2010 at Sittwe.

10 Progress made… contd. Construction activity at Sittwe started in Dec Consequent to relocation of terminal to Paletwa, preparation of DPR for New road section between Paletwa and Kaletwa has become necessary. MEA has appointed M/s IRCON Infrastructure & Services Ltd. New Delhi as the agency for preparing the D.P.R. for the new road section. Design and model testing of 300 DWT Barges has been completed. Selection of Yard is in final stage. Barges are to be built in Myanmar.

11 Progress made… contd. Reclamation for backup facilities at Sittwe 96% completed, Construction of Rubble mounted Dyke 70% Completed. Construction of Pile work at IWT & Port Approach Jetty at Sittwe 98% completed. Main Jetty piling work shall commence shortly. Pre-cast concrete works for IWT & Port Jetty at Sittwe 50% completed. Excavation work at Paletwa 15% completed.

12 Reclamation for backup facilities (96%)

13 Dyke Construction work at Sittwe (70%)

PILING GANTRY 1 PILING GANTRY 2 14

15 Piling work at IWT Approach Jetty (98%)

16 Pre-Cast Yard at Sittwe (50%)

17 Excavation work at Paletwa (15%)

18 Progress made… contd. Hydrographic Survey at Sittwe Port and also in between Sittwe – Paletwa stretch was completed on and respectively by IWAI with the assistance from the local Survey agency. 6 Nos of Shallow area for dredging in Kaladan river was identified. 5 Nos of Shallow area was indicated in DPR (2002). The Location of Navigational Aids, Positions of submerged Rocks and Dredging alignment are to be demarcated as per the new Survey charts.

19 Hydrographic Survey in Kaladan River

20 Plan of Approach & Harbour channel at Sittwe

21 Layout of Port & IWT Jetty, Sittwe

22 Layout of IWT Jetty at Paletwa

23 Important Points / issues Approval of General layout drawings for backup facilities was submitted to Working Committee, Govt. of Myanmar :-  on for Sittwe.  on for Paletwa Approvals are yet to be received.

24 Important Points / issues M/s. Essar Projects has already expressed that they can complete the work within the scheduled time by mobilising additional resources subject to the receipt of above approvals without further delay. Otherwise project may get delayed by another 6 more working months.

25 Thank you