Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/09 2-2 Operations Report of LEOP S. Burgaud / CNES.

Slides:



Advertisements
Similar presentations
CCSDS Cross Support Services Issue 0.1 October, 2008 Takahiro Yamada, JAXA/ISAS Peter Shames, NASA/JPL.
Advertisements

IOCP KP-0 / 09 December 2009 HB-1 In-Orbit Commissioning Phase : IOCP Key-Point 0 09 December 2009 ( L + 37 Days ) ESAC – Villafranca.
1 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In Orbit Commissioning Activities : System Reviews F.Bermudo / CNES.
Commissioning KP 0ESAC December Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status.
Amateur Radio on the International Space Station (ARISS)
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Decision making process, Communications and Planning.
DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle.
1.STSE 2.Objectives of today 3.Data availability 4.Reprocessing 5.RFI 6.Conferences & user meetings Introduction – SMOS mission status.
Tsunamis Detection The Mission  Tsunamis Detection can help to minimize loss of life and property from future tsunamis. Mission Introduction Mechanism.
UNITED STATES ANTARCTIC PROGRAM SOUTH POLE SATELLITE COMMUNICATIONS UPDATE Nicolas S. Powell 15 July 2002 Raytheon Polar Services Company Denver, Colorado.
20 th SMOS SAG, ESAC, 2 & 3 November SMOS Project Status 1.Payload 2.Platform 3.Satellite 4.Launcher 5.Flight Operations Ground Segment 6.Data Processing.
SMOS SAG, Villafranca November 2-3, 2006 Development of a Global In-Situ Soil Moisture Network: A SMOS Project Contribution P.J. van Oevelen.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
Baby Sat University of Missouri-Rolla Carl Seubert Jason Searcy Josh Jacob Michelle Rader.
AMHS (ATS Message Handling System)
DORIS - DAYS Toulouse May 2-3, 2000 DORIS Doppler Orbitography and Radiopositioning Integrated by Satellite  Basic system concept  Main missions  Schedules.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
ETD Submission Process Fall 2011 Valerie Emerson ETD Administrator, Gelman Library / (202)
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
Natal Workshop October 30th, Project Status.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
Slide 1 CEOS WGISS 17, Troms Ø, May 2003 ESA Report on ESA EO missions CEOS Troms Ø, WGISS May 2004 Henri Laur, ENVISAT Mission Manager Ivan Petiteville.
1 Low Cost Multimission Telecommand and Telemetry Natal Ground Station (TT&C) by Jean Paul DUBUT (INPE/CRN) 1 st COROT Workshop – Natal – RN – Brazil.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Generic Instrument Processing Facility Interface Specifications A. BuongiornoFrascati 12 /10/2012 ESA EOP-GS 1.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
1 Basic Radar Altimetry Toolbox & Radar Altimetry Tutorial.
Hommes Logiciels Matériels S A L P SALP, the CNES ground segment for altimetric missions With the successful launch of EnviSat and Jason-1 missions, the.
Space Systems Engineering Database (SSED) Seminar on Aerospace Mishaps and Lessons Learned 2004 MAPLD Conference 8 September 2004 Jon Binkley (310) 336.
Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/09 Preliminary Satellite in flight status.
Introduction to the Global Positioning System Introduction to the Global Positioning System GPS.
Colorado SpringsJanuary 23~26, Winter-Spring 07 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
GPS Global Positioning System. What is GPS?  The Global Positioning System.  A system designed to accurately determining positions on the earth  The.
IOCP High Level Plan, 8 September In-Orbit Commissioning Phase: High Level Planning.
ESA’s ENVISAT Satellite RGB Imagery from MERIS (ENVISAT) Applied Research in Geomatics, Atmosphere, Nature and Space (UK) Managing Director:
CSA St Hubert, Quebec24-25 May Spring 2004 CCSDS Management Council CNES report Geneviève Campan (CNES)
Ashley Lyon CGSIC May 7th 2006 European Satellite Services Provider “EGNOS Operations Status”
EO Ground Segment and Data Access Evolution Alice Springs Refurbishment Program Presented by Simon Oliver for John Frampton.
SMOS QWG-9, ESRIN October 2012 L2OS: Product performance summary v550 highlights 1 The SMOS L2 OS Team.
ESA Report to DAI/IPR WG Gian Maria Pinna DAI/IPR meeting Toulouse 2-5 November 2004.
CEOS Plenary Session Montreal, 4 November 2013 Stephen Briggs, ESA Head, Programme Planning and Coordination Service ESA’s Earth Observation Programme.
Space Data Link Secure Protocol Simulator Bruno Saba DCT/TV/IN 15/04/2010.
Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager
Requirements to WSO Ground Segment Lavochkin Association & ROSCOSMOS 30/06/2006.
Slide 1 CEOS WGISS 20, Kyiv, Sep ESA Report on ESA EO missions CEOS Budapest, WGISS May 2006 I. Petiteville.
CNES program status CNES program status Prepared by E. Thouvenot, CNES August 2007.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
JASON2 Status in NOAA Gary Petti Office of Satellite Data Processing and Distribution.
JASON-1 MISSION STATUS S. Coutin-Faye CNES, Altimetry and Precise Positioning Office.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
1 CleanSeaNet DREAM PRESENTATION. Content Short introduction to EMSA EMSA Objectives and expected main results from DREAM EMSA Activity/Processes to which.
SMOS IOCP KP0, 9 December SMOS DPGS at KP0 1.Production 2.Product Quality 3.Problems Identified 4.Positives.
39 th Conference of Directors of EU Paying Agencies ESTEC, 25 May 2016 M. Drusch, Principal Scientist Earth Observation Programmes Directorate Science,
Status of Sentinel-3 activities at EUMETSAT SIT-31 Agenda Item # 13 ESA/ESRIN, Frascati, Italy 19 th -20 th April 2016 Committee on Earth Observation Satellites.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
AMHS (ATS Message Handling System)
ESA’s Earth Observation Programmes and GOCE
System Design, Implementation and Review
GLAST Large Area Telescope:
Ken Gunnells, Ph.D. - Networking Paul Crigler - Programming
Application of ODP for Space Development
Ground Segment for WSO/UV
Bringing Home the Bacon: Grant Writing Basics Unit 7 Grant Submission
IOAG – Industry Exchange Workshop
SPACECRAFT OPERATIONS Paul Collins Head of Spacecraft Operations
Presentation transcript:

Soil Moisture and Ocean Salinity 1 SMOS IOCP Key-Point 0 09/12/ Operations Report of LEOP S. Burgaud / CNES

2 SMOS IOCP Key-Point 0 09/12/09 Ground Segment Status Orbitography Operational Centre : >involved for first orbit computation, until GPS switch ON >support for station acquisition manoeuvres, in case of problem  very good support supplied IT Network : >no major anomaly >ISDN line activated once because of nominal link maintenance activities Ground stations : >Good behaviour of the ground stations network >No issues on TTCET ground stations >Several minor anomalies with Homere stations : -TM file retrieval, RF link -no impact on SMOS operation planning -due to the fact SMOS is the first PROTEUS mission using these stations

3 SMOS IOCP Key-Point 0 09/12/09 Ground Segment status SOCC : –Very satisfying behaviour of all the components –No major anomalies –Main Change Requests implemented : >TC_Auto facilities : to allow automatic TC_Group upload during the night with Homère stations >E_HKTM files delivery : on ESA request, these files are now sent after each pass (instead of every 6 hours) >New Satellite data base : v 4.0 -Modification of ground monitoring relative to PLM temperatures -TC reject file correction,  To be set up by the end of the week Conclusion : CNES GS implied in SMOS LEOP worked like a charm, with very few harmless anomalies

4 SMOS IOCP Key-Point 0 09/12/09 Operational documentation for routine activities Smos In-Orbit Mission Management Plan : –Version 1.0 issued and signed by CNES and ESA Operation Interfaces Agreement between SOCC and PLPC –Issue 2.0 applicable + “E_HKTM delivery” Change Request –Weekly routine timeline is applicable from now, as defined –Collision avoidance process is activated –RF interferences with Jason 1 satellite are weekly computed, and avoided without impact on PLM planning PLPC-SOGS ICD : –Issue 1.9 applicable + “E_HKTM delivery” Change Request