1 WP 2.1 Communication standards Mihael Mohorčič Torino, December 2003.

Slides:



Advertisements
Similar presentations
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
Advertisements

CAPANINA Multimedia Applications Demo Specifications for Trial 1 Milan Lalovic Wireless Networks, BT Exact.
Satellite Standards for HSSP Mike Beavin (SIA) Tony Noerpel (HNS)
S1000D Transformation Toolkit Mr. Wayne Gafford Advanced Distributed Learning (ADL) Mr. Tyler Shumaker Concurrent Technologies Corporation (CTC)
Quality of Service in IN-home digital networks Alina Albu 23 October 2003.
Siemens-LUMS Collaboration. Project on GELS Evaluation CT IT 2 (Siemens) NC Lab (LUMS)
Simultaneous Rate and Power Control in Multirate Multimedia CDMA Systems By: Sunil Kandukuri and Stephen Boyd.
W w w. w o o d a n d d o u g l a s. c o. u k dVMo – Digital Video for Moving Objects COFDM Digital Video / Data Link 1.
1. 2 Communications from Aerial Platform Networks delivering “Broadband for All” Will deliver ‘Broadband for All’ from high altitude aerial platforms.
13/08/2015 Broadband Access including Fixed Wireless Access ETSI BRAN Overview 1GSC-9, Seoul SOURCE:ETSI BRAN Chairman TITLE:ETSI BRAN Broadband Access.
Doc.: IEEE xxxxx Submission doc. : IEEE wng0 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
1 Technical Overview David Grace (UOY) First Annual Review, Brussels 10 February 2005.
CMM ESL PD day Monday 21 st June 2010 Concurrent Session 1: Integrating Occupational Health and Safety into ESL employment programs Facilitator: John Molenaar.
ANCIT WORKSHOP Torino March Access Network in EURESCOM Projects, and the P614 Project Umberto Ferrero CSELT (P614 Project Leader) Participants.
COnvergence of fixed and Mobile BrOadband access/aggregation networks Work programme topic: ICT Future Networks Type of project: Large scale integrating.
The Project Planning Process
Architecting Secure Mobile P2P Systems James Walkerdine, Peter Phillips, Simon Lock Lancaster University.
WiMAX Technology Jokkmokk May Pablo Vila R&D Manager Albentia Systems Networking for Communications Challenged Communities:
Lector: Aliyev H.U. Lecture №15: Telecommun ication network software design multimedia services. TASHKENT UNIVERSITY OF INFORMATION TECHNOLOGIES THE DEPARTMENT.
Providing Web Services over DVB-H Mobile Virtual Web Services Reporter: 藍元宏 Date: 2009/05/11 Vilas, A.F.; Redondo, R.P.D.; Arias, J.J.P.; Solla, A.G.;
DCN: March 7, 2005 IETF 62 - Minneapolis, MN Media Independent Handover Services and Interoperability Ajay Rajkumar Chair, IEEE
10/10/2015 GSC8 Resolutions 11 Resolutions Joint 3, GRSC 5, GTSC 1, IPR 1, UWG 1 1GSC-9, Seoul SOURCE:TTA TITLE:GSC8 Resolutions AGENDA ITEM:Opening Plenary.
1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT.
1 Status of WP2.3 “Radio Interface and Baseband signal Processing” Progress from Milestone 0072 to Deliverable D15 5 th CAPANINA Meeting BARCELONA – March.
Updates on the 863MHz SRD band and 872MHz Award Andy Gowans, SPG, Ofcom UK 12th May 2009 IEEE802 Interim Meeting Atlanta 2009.
2008/5/81 Fixed WiMAX Field Trial Measurements and Analyses Ole Gr0ndalen, Pal Gr0nsund, Tor Breivik, Paal Engelstad Mobile and Wireless Communications.
1 WP3 Progress towards objectives 27/10/ WP3.1 Communications equipment for trials The objectives of this work package are: to configure existing.
“4WARD – Architecture and Design for the Future Internet” D2.1 Technical Requirement Hoon-gyu Choi
1 Path-decoupled signaling - towards a BOF in SF NSIS working group context Path-decoupled signalling - definition –Path-oriented.
COST289 14th MCM Towards Cognitive Communications 13 April Towards Cognitive Communications A COST Action Proposal Mehmet Safak.
1 WP4 – System Testbed Trial 2 preparation Barcelona 3/03/05 Marco Bobbio Pallavicini - Carlo Gavazzi Space SpA.
Wireless Mobile Communication and Transmission Lab. Chapter 8 Application of Error Control Coding.
1 WP2.5: Kick-off the work. 2 Outline Revisit the objectives of WP2.5 Potential services and applications Potential standards for PHY and LL Business.
MAINDATA 2-way Broadband Satellite Internet Platform MAINDATA 2-way DVB RCS system Open standard based 2-way DVB RCS Satellite platform for Broadband Internet.
1 WP2: Communication Links and Networking Mihael Mohorčič Torino, December 2003.
1 WP2.3 “Radio Interface and Baseband Signal Processing” Content of D15 and Outline of D18 CAPANINA Neuchatel Meeting October 28th, 2005 – Marina Mondin.
MAPLD 2005/254C. Papachristou 1 Reconfigurable and Evolvable Hardware Fabric Chris Papachristou, Frank Wolff Robert Ewing Electrical Engineering & Computer.
Wireless Data Communication in Substations Mladen Kezunovic (P.I.) Costas N. Georghiades Alireza Shapoury PS ERC PSerc Review Meeting Texas A&M University.
1 WP3.3: Steerable antenna technologies: Signal processing aspects Participants: UoY (18MM); POLITO (19MM); EUCON (6MM) Tim Tozer & Yuriy Zakharov.
1 WP2.4 System performance employing Handoff techniques to overcome platform movement CAPANINA Virtual Meeting – July 2005 Konstantinos Katzis University.
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 12 Implementing Business/IT Solutions.
1 WP2: Communications Links and Networking – update on progress Mihael Mohorčič Jozef Stefan Institute.
1 WP1 Technical Overview Progress since last meeting Brussels 10 th February 2005 Michael Fitch.
1 WP 2.2 Propagation and Diversity Candida Spillard Torino, December 2003.
IST project ePerSpace N° IST integrated project ePerSpace Contract N°: Ádám Kapovits, Eurescom 8/11/2004.
WORLD Project Wireless multiplatfOrm mimo active access netwoRks for QoS-demanding muLtimedia Delivery University of Roma “La Sapienza” University of Napoli.
ST Quality WG I. Béjar Alonso Group Leader’s meeting 6th July.
1 Planning Base Station and Relay Station Locations in IEEE j Multi-hop Relay Networks Yang Yu, Seán Murphy, Liam Murphy Department of Computer Science.
Doc.: IEEE /1229r1 Submission November 2009 Alexander Maltsev, IntelSlide 1 Application of 60 GHz Channel Models for Comparison of TGad Proposals.
COGNITIVE NETWORK ACCESS USING FUZZY DECISION MAKING Nicola Baldo and Michele Zorzi Department of Information Engineering – University of Padova, Italy.
1 1 SKA - CRISP WP19 17 th March 2013 Dr. Rahim Lakhoo (a.k.a Raz) P.I – Dr. David Wallom.
Copyright © 2011, Quality-Driven Cross-Layer Optimized Video Delivery over LTE IEEE Communications Magazine, FEB 2010 Speaker: 劉姿瑾 Date: 25,
QoS-Enable Broadband Mobile A ccess to Wireless Networks IEEE Communications Magazine April 2002 報告者 : 通訊所 林益宏.
National Aeronautics & Space Administration European Space Agency & 1 Modulation and Coding: Draft IOAG Resolutions to CCSDS September 9, 2008 Les Deutsch.
Doc.: IEEE /182r0 Submission March 2002 Brüninghaus / Euscher / Kockmann, Siemens.Slide 1 Home Networking Requirements & Aspects for Next Generation.
Contribution doc.: IEEE r July 2014 Eggert (Atmel) Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
HWFP data gap analysis Plenary session _____________________________ WP4 Rome Workshop 3 rd December 2014.
Preparing Secondary Students for Work A framework for vocational learning and VET delivered to secondary students Nicole Ram Vocational Pathways Team Department.
WOMEN Project W ireless 8 O 2.16 M ulti-antenna m E sh N etworks University of Roma “La Sapienza” + University of Roma “Tor Vergata” University of Napoli.
Decisive Themes, July, JL-1 ARTEMIS Decisive Theme for Integrasys Pedro A. Ruiz Integrasys July, 2011.
p Submission June 2012 Yale Lee, Lilee Systems Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Communication Protocol Engineering Lab. A Survey Of Converging Solutions For Heterogeneous Mobile IEEE Wireless Communication Magazine December 2014 Minho.
Chapter 5 Designing the Architecture Shari L. Pfleeger Joanne M. Atlee
Physical Layer Approach for n
Liaison Report from Date: September 20, 2012 September 2012
Mark Epstein Senior Vice President Qualcomm
IETF Network Discovery and Selection Overview
IMT-Advanced Technical Requirements
Roberto Donadio Principal Engineer - ESA
Presentation transcript:

1 WP 2.1 Communication standards Mihael Mohorčič Torino, December 2003

2 Overview and objectives WP2.1 will select the most suitable existing or developing communication standard(s) for the delivery of broadband services from aerial platforms Candidate standards include IEEE , IEEE , HIPERACCESS, DVB-S, DVB-RCS, DVB-T... Analysis of existing broadband communication standards Identification of critical aspects Investigation of technological constraints Selection of the most suitable candidate communication standards for different operating scenarios identified in WP1

3 WP2.1 structure T211: IEEE 802 family of standards IEEE IEEE802.20, IEEE (?) T212: DVB family of standards DVB-S DVB-RCS DVB-T T213: Other candidate broadband communication standards HIPERACCESS...

4 WP2.1 time plan JSI POLITOEUCON UPC TOTAL WP2.1Communication Standards7, ,5 T211IEEE IEEE IEEE a/b/g/n T212DVB-S DVB-RCS DVB-T T213HIPERACCESS

5 Inputs and previous work Inputs required: operating scenarios, candidate appllications and services From WP1.1 – Applications identification and selection required RF link margins From WP2.2 – Propagation aspects and diversity methods Previous work in the HeliNet project: included the review of standards for the fixed broadband application – T1 “System level design aspects for the delivery of broadband services over HeliNet” identified IEEE as the most suitable candidate for the FBWA scenario

6 Expected outcomes M8 M8: Identification and draft specification of candidate standards for delivery of broadband services from aerial platforms M15 M15: Identification of critical aspects and technological constraints of candidate standards Both feeding mainly into: WP2.3 WP2.3 to propose the most suitable adaptive modulation schemes and coding techniques WP2.4 WP2.4 to develop suitable resourse and mobility management strategies WP2.5 WP2.5 to solve interoperability and define mapping of QoS parameters between layers WP3.1 WP3.1 to develop communications equipment for trials supporting the selected standard

7 Document Properties