Questions and challenges of an underground multi-kton LAr TPC detector Outline Introductory Remarks Detector Optimization Vessel construction and integration.

Slides:



Advertisements
Similar presentations
S4 Proposal for a Liquid Argon Detector at DUSEL Marvin L. Marshak/University of Minnesota Thanks to Bonnie Fleming for multiple slides. 1.
Advertisements

Electronics for large LAr TPC’s F. Pietropaolo (ICARUS Collaboration) CRYODET Workshop LNGS, March 2006.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cryogenic discussion and update 30 October 2014Neutrino platform.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
MODULAr: concept design of internal detector mechanics A. Menegolli, University and INFN Pavia.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Designs of Large Liquid Argon TPCs — from MicroBooNE to LBNE LAr40 Bo Yu Brookhaven National Laboratory On behalf of MicroBooNE and the LBNE LAr Working.
LAr20 Goals & Plans Integrated R&D Plan Development Bruce Baller November 23, 2009.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Observations on possible factors affecting LAr purity on the 50kton TPC from the viewpoint of the internal walls Alejandro S. Díaz Chemical Engineering.
S. Pordes FNALLNGS Cryodet Workshop Mar towards a Multi kton Liquid Argon Detector for the NuMI Beam Fermilab, Michigan State, Princeton, Tufts,
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
David Finley / LongBaseLine Study / June 27, Fermilab Slide 1 The Next Significant Steps LArTPC Costing Methodology Ongoing R&D Summary LArTPC Design.
MiniBoone Detector: Digitization at Feed Through Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab 1.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Liquid Argon is a bright Scintillator (40,000 photons/MeV) and allows free electrons to drift meters under electric fields of 0.5 kV/cm. Liquid Argon presents.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
LRT2004 Sudbury, December 2004Igor G. Irastorza, CEA Saclay NOSTOS: a spherical TPC to detect low energy neutrinos Igor G. Irastorza CEA/Saclay NOSTOS.
Liquid Argon Time Projection Chamber: Purity and Purity Monitoring DAVID GERSTLE – LArTPC – YALE UNIVERSITY/FNAL 31 May 2006 – FNAL Users’ Meeting Materials.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
LAr R&D review; Nov 2009Slide 1 Closeout LAr20 R&D plan review General findings Thank you for an impressive set of presentations on the LAr R&D program.
TPC Design Concept: From MicroBooNE to LAr20
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
Discussion: développement du système de lecture des photomultiplicateurs pour le prototype de détecteur Argon liquide de LBNO 21/11/2013 Réunion: APC,
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon R & D work at Fermilab neutrinos WIMPS.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
David Finley / LongBaseLine Study / June 27, Fermilab Slide 1 Ultimate Step and Penultimate Step LArTPC Costing Methodology Ongoing LArTPC R&D Summary.
S. Pordes - FNAL May 13th Purity Monitor - Description and Experience at Fermilab Production of Clean Argon - Description of Filtering System and.
David Finley, Fermilab / October 3, 2005 on LArTPC Slide 1 LArTPC: Large Liquid Argon TPC for the NuMI Off-axis Beam First Point: Try to recognize intellectually,
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
November 4, 2004Carl Bromberg, FNAL LAr Exp. Workshop Nov. 4-6, Liquid argon as an active medium Carl Bromberg Michigan State University & Fermilab.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
35ton and LAPD cryostats and future DUNE detector development.
Second run with the Copper filter WA104 technical meeting – 23/03/2016.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
Low-energy Sim/Reco Capability Xin Qian (BNL) Tingjun Yang (FNAL) 1.
Value Engineering proposal: Putting APA’s on outside or put short drift cell on outside April 21, 2014, Post meeting rev. April 25, 2014 Russ Rucinski.
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Installation of the T600 at Fermilab
Overview of the Long-Baseline Neutrino Facility Cryogenic System
protoDUNE – single-phase Instrumentation - Gas Analyzers
Proximity Cryogenics P&IDs meeting
First tests on the roll-formed field cage.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Warm structure requirements :
Presentation transcript:

Questions and challenges of an underground multi-kton LAr TPC detector Outline Introductory Remarks Detector Optimization Vessel construction and integration Cryogenics and Purification Readout 4/25/081F. Lanni Brookhaven National Laboratory

Introductory Remarks There is a growing interest in LAr TPCs due to its unique capabilities: –3D-imaging: full event topology reconstruction –Precision calorimetric measurements –PID through dE/dx (low momentum particles) –Higher sensitivity to physics and for some of the proton decay channels (e.g. p K ) However the feasibility of multi kiloton detector is yet to be proven. –R&D plans are growing fast. Getting organized. Needs support. Technical challenges and questions here: –0 th order: applicable to multi-kton scale (5k,20k,100k) Not addressing questions related to the near detector (smaller scale): microBooNE detector? 4/25/08F. Lanni2

Detector Designs Different designs and proposals over the last few years: 4/25/08F. Lanni3 GLACIER hep-ph LAANND astro-ph LArTPC FERMILAB-FN-0776-E MODULAr hep-ph Needs optimization

Detector Design and Optimization Depth? Modularized Option. Optimization against : –Costs (Cavern and Vessel) –Technical Feasibility –Schedule and Staging options –Risks (e.g. purification/ contamination compromising detector operations and performance) –Safety (recovery of LAr for severe failures) 4/25/08F. Lanni4 (rewording B. Fleming SLAC P5 meeting – Feb 2008) KxL>5ktons

Cryostat Vessel 4/25/08 F. Lanni5 5 kton Construction: –Non-”evacuable” –Single Vessel containment + Insulation? Industrial vessels? LNG tanks? –Rock stability: can the walls be used a structural element? –Materials: glass foam insulation, inner wall liner –Heat Loads Refrigeration and cooling loop Access, Assembly and Integration: –Single access: through top door? –Contamination: clean room requirement? –Heavy Material handling –Assembly sequence

Cryogenics and Safety Vessel needs a relief valve and a way to evacuate LAr in case of an accident Do we want to try to recover LAr in case of an accident? Large storage facility above ground and pumps to evacuate the Argon Extra vessel underground? Catastrophic failures: –Abandoned tunnel as “dump” and then slowly get the L/G Ar out from that tunnel? Safety aspects during assembly of the experiment …in regular running 4/25/08F. Lanni6

Cryogenics: Heat Load Example of a ~5kton detector Heat Load: 15kW – through the walls and the floor: 9kW –Roof+FT (guesstimate): 6kW –Boiloff 0.15% of the total volume per day Scaling to a ~20kton detector: kW 4/25/08F. Lanni7 Assuming a ~20kton vessel with cold electronics 40mW/channel ~250k-1M channels Heat Load: 10-40kW Total Load: ~50-80kW(for a 20kton),[ kW (for a 100kton detector)] Refrigerator and LN2 storage nearby? Surface? 5 kton

Cryogenics and Purification Electron drift several (2-5) meters, i.e. T D ~3-8ms –Maximum Drift Path –Drifting Electric Field –Purity Levels (O2 equivalent) allowed –Other (than O2) electronegative impurities? Purification Systems: –Gas vs. Liquid Phase (both ala Icarus?) –Re-circulation rate needed Oxysorb (single pack ~120m3/day) and molecular sieves? Other devices? Purification system near/(inside?) each vessel? Initial filling assuming no evacuation: –Purging (gas-cycles, impurity freeze-out through LN2??) LAr contamination: material testing for detector and readout construction 4/25/08F. Lanni8 C. Montanari, Criodet-2, LNGS (Jun 2007) ICARUS T-600 NIM A516 (2004) pp

Cryogenics and Purification Lots of R&D required Small scale Test Stands already existing at FNAL –… being used or planned to be used also for microBooNE material testing for example Purging tests also planned at Fermilab on purity demonstrator vessel (20 tons) –… and proposed by the microBooNE collaboration 4/25/08F. Lanni9

Readout and Detector Geometry Detector Layout Optimization: Assuming double-module geometry (HV middle plane, 2 readout plane set on the side) –Similar scheme as ModuLAr, geometry ala microBooNE Dimensions: –Maximize drift distance (limited by purity, HV....) –Wire planes (1 collection, 2 induction planes, additional grid?) –Wire orientation –Wire length, pitch [3-6mm] –Materials (minimize resistance: SS+Au/Ag/Cu plating, CuBe) Readout S/N –Wire Termination schemes Double-Module Dimension: –2x4x8x15x1.4 = 1.3 ktons –5kton : 4 double modules –20 kton: 16 double modules 4/25/08F. Lanni10 (from microBooNE proposal – Oct 2007) Nr. Of channels: ~2*2*15000/3(5) ~ 12-20k/module 5kton: 50-80k 20kton: 200k-320k 100kton: 1M-1.6M

Readout Optimization Requirements and Optimization –“Track” resolution: shaper peaking time [1-2us] – S/N: minimization of noise: again peaking time and cold electronics –Sampling Frequency and Dynamic Range –Signal Processing/Optimal Filtering/RT Reconstruction (partly integrated in DAQ) –Architecture based on continuous wfm recording: 0-suppression Peak-finder/time-slice/Self-Triggering –Reduction of vessel penetrations: MUX’d architecture 4/25/08F. Lanni11 Trigger/T0 determination –PMTs, fiber-based optical readout

Readout: Cold Electronics Best S/N obtained by: –Minimizing the length of connections between detector elements and preamplifier inputs –Cold electronics to (pMOS processes) optimized performance at cryogenic temperature –Factor ~3 at least better than at room T 4/25/08F. Lanni12 Extensive R&D Program required: Assess p-MOS technology at cryogenics temperature (packaging, reliability etc.) (from MicroBooNE proposal’s addendum – Mar 2008)

Readout: MUX 100kton LAr ~ 250k-1M channels Issues: –Cable factory –Feedthroughs –Heat Load – S/N R&D on a multiplexed readout architecture and integration scale (analog+digital?) of possible ASIC –Minimize power –4 years (at least) Steps: –Analog Front-End (PA+Shaper, Peak Finder) –Analog Pipeline/ MUX – Digitization and transmission 4/25/08F. Lanni13 Conceptual

Summary: R,D and R&D Programs Cavern: depth, shape,size, optimization Vessel Design: Materials, insulation, feedthroughs, cavern interface, access and assembly, integration issues Cryogenics: Refrigerator Size and location, LAr fill, dump and evacuation/recovery/storage. Purification: large system purification, purging during initial filling TPC design: wire plane structure, materials, geometry/layout optimization Readout: Low Noise Cryogenics Electronics, MUX and Data Reduction Readout/Trigger: T0 determination (light detection?) Physics R&D: Signal Processing, Optimal Filtering techniques, Event reconstruction Safety Issues – at each step we need to understand the safety issues and requirements of working underground. 4/25/08F. Lanni14

Summary/Conclusions LAr TPC are powerful detectors for a wide “range” of physics Ultimate physics capabilities need more detailed studies Technical challenges need to be understood to assess feasibility of large scale detectors: –First understand issues related to underground operations of cryogenic detectors … some are common to the ones of large WC Second to make rapid progresses the R&D program needs: –Organized working groups/large collab. –Significant Resources –Financial Support! 4/25/08F. Lanni15