A Guide to Solid Wall Insulation INSTALLATION. Surveys Properties need to be fully surveyed Is substrate suitable for mechanical fix? Is there sufficient.

Slides:



Advertisements
Similar presentations
Solar PV On-Site Guide Solar PV On-Site Installers Guide.
Advertisements

Because the client has a need, We have a job to do;, Because the client has a choice, We must be the choice; Because the client.
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
COST EFFECTIVE MASS HOUSING TECHNOLOGY
A Guide to Solid Wall Insulation. Agenda Introduction Solutions Internal Solutions External Solutions Summary Questions.
New Homes Construction Overview To Code 4 Long Meadow, Diss Mark Hart Divisional Construction Director.
METHODS OF PRODUCTION Business must decide on the most suitable method of production. The objective is to minimise the cost per unit, i.e. productive.
Innovative New Technologies in Building & Construction.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Tom Dollard Head of Sustainability Pollard SME Builder’s Book Consultation.
Brief Introduction of 3D Construction System
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Walls Ron Gatepain constructionsite.
Skyscraper Construction
ECAP: prefinished thermal insulating board THERMAL INSULATION TECHNOLOGY.
A guide to home insulation: How it can benefit your pocket and the environment Home Building & Renovating Show.
Leonardo da vinci project Being active in building Passive homes: 1- Walls construction, 2- Building a passive house, blower door test, 3- Solar systems,
17/05/2015Dave Winchester Jan 2011 Dry Dashing Dry Dashing.
Repair Methods for Rendered Structures Rak Repair Methods of Structures, exercise (4 cr) Esko Sistonen.
Hard to Treat Homes Bev Coombe Membership and Communications Manager.
QuickWalls® strong. fast. simple.
LOGO General Trias Cavite. Along cross roads of Daang Hari and Arnaldo Hi-way.
Concrete Over site 300mu DPM / 1200 gauge (Tape all joints with Polythene Tape) Floor finish 50mm Gvylon screed 250mu DPM -clear plastic (Tape joints with.
External Plastering Plain Float Finishes. Backgrounds Concrete blocks Brick E.m.l. Cement boards.
An Introduction to the NIA and Insulation Neil Marshall.
Thermal renovation of building fabric using modern insulation materials.
SITE SUPERVISION (CITADEL TOWER)…………….…1 SITE SUPERVISION (CITADEL TOWER)…………….…1 DESIGN OF A 3 BEDROOM STOREY BUILDING…..2.
Anouchka Poloubinski-Blandin Anastasija Krivonosova Anthony Baptista Luis Fernandes Plains-Wanderer N° 9.
Dry lining.
Building for Learning Project Photo Progress Report 6 February 2010– March 2010 Project commencement 21 st September 2009.
The NIA & Solid Wall Insulation. Introduction to the NIA Solid Wall Insulation Market and Solutions Challenges/Solutions Support Available The NIA.
Ben Craig, Operations Director 25 April 2013 DECC Fuel Poverty Project The Delivery Experience.
Dry lining by direct bond – overview
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Insulated rendering systems General Principles of Thermal Insulation.
Batch/Mass Production! Design your product to be suitable for Mass/Batch production. When your designing a product for Batch/mass production -Choose a.
Remember... Resistance in Mechanical systems (friction) opposes motion of solid objects.
‘IT IS TIME FOR ACTION ’ IN THE SOLID WALL SECTOR JOHN MASON HEAD OF POLICY & COMMUNICATIONS.
Site practice notes.
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
QuickWalls® strong. fast. simple. *Light Weight *Insulated
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Solar Gain The ultimate free lunch!. Some Basics Why do we need to heat our homes? –Living rooms21 o C –Bedrooms18 o C –Staircases & halls16 o C.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Energy Seminar A prefabricated, non-disruptive approach to whole house energy retrofit. Stock assessment, appropriate properties and implementation. John.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Learning Outcome Lesson Objective
The Low Carbon Existing Homes Challenge and The Green Deal Sara Pearce ConstructionSkills.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
Leads Institute of Technology & Engineering
Backgrounds and Plaster
Fire Safety update Mike Kay, CEO &
Foundation – jay Desai.
SUSTAINABLE TECHNOLOGY
Apply Plaster Materials to Internal Surfaces
Types of ground floors.
Finishing Dry Lining – Direct Bond
Progress Charts.
​The consequences of poor installation  practices, and how these relate to the catastrophic failure of External Wall Insulation Systems Paul Valentine.
International Building Materials and components
Backgrounds and plaster
Expanded metal lath.
Name____________________________ Tutor Group _____
اصول گودبرداری و ایمن سازی
Direct Bond – Dry Lining to Masonry Backgrounds
Apply Plaster Materials to Internal Surfaces
Presentation transcript:

A Guide to Solid Wall Insulation INSTALLATION

Surveys Properties need to be fully surveyed Is substrate suitable for mechanical fix? Is there sufficient overhang on cills/soffits? Gates/satellite dishes provision needs to be made for refix Windows and reveals Do soil pipes need to be moved? Access Requirements & Ties External Wall Solutions

Installation 3 key stages for a typical semi 1. Boarding and beading 1-2 days 2. Base coat and Mesh 2 days 3. Top coat /finish 1days Usually a 3 man team Drying times required for stage 2 up to 48hrs Can only be applied if temp is 5 0 and rising External Wall Solutions

Boarding with EPS board External Wall Solutions

Boarding with Mineral wool boards External Wall Solutions

Base coat and mesh External Wall Solutions

Render External Wall Solutions

Finish coat using brick slabs External Wall Solutions

Typical site social housing refurbishment External Wall Solutions

Skills Boarding not highly skilled but important as it’s the basis of the system Base coat /Top coat generally plastering or rendering experience required Mainly hand application but machine application available on most systems External Wall Solutions

Site supervision Will vary from system to system but will normally take place at the 3 critical stages Under CERT independent inspections will also be required External Wall Solutions

Typical costs 3 bedroom semi Scaffolding costs £1000 Material and labour £60-£85/m2 Ancillary costs e.g. Satellite dish £100, gates £50 External Wall Solutions