Experimental and Theoretical Study of Energy Deposition and Residual Activation Induced by Uranium Ions to Model the Beam Loss Hazards in the GSI Future.

Slides:



Advertisements
Similar presentations
2. June 1 Verification of Monte Carlo Transport Codes FLUKA, MARS and SHIELD-A Vera Chetvertkova, E. Mustafin, I.Strasik (GSI,
Advertisements

This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
I. Strasik et al. ● Halo Collimation of Proton and Ion Beams in FAIR Synchrotron SIS 100 ● CERN Halo Collimation of Proton and Ion Beams in.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Estimation of temperature increase in the dump through Monte – Carlo simulations and rough calculations N. Charitonidis (EN/MEF)
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Synchrotron radiation at eRHIC Yichao Jing, Oleg Chubar, Vladimir N. Litvinenko.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Martin Winkler, Task7: NUSTAR Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet  The Pre-Separator of the Super-FRS.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Work required to have a proposal in June (for discussion) RA, CPM, 15/4/03.
Ion operation and beam losses H. Braun, R. Bruce, S. Gilardoni, J.Jowett CERN - AB/ABP.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Modeling of the set-up for the Project experimental tasks and study of radiation hazard due to lost beam particles in the GSI Future Facilities INTAS-3588.
The energy deposition profile for 238U ions with energies 500 and 950 MeV/u in iron and copper. A.A.Golubev 1, A.V.Kantsyrev 1, V.E.Luckjashin 1, A.D.Fertman.
Experimental and Theoretical Study of Energy Deposition and Residual Activation Induced by Uranium Ions to Model the Beam Loss Hazards in the GSI Future.
Stefania Trovati EPFL - CERN S. Trovati - SATIF 101.
Target Simulations for Hadron, Electron and Heavy-Ion Beams 2 nd High-Power Targetry Workshop Oak Ridge, TN October 10-14, 2005 Fermilab High-Power Targetry.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
An introduction Luisella Lari On behalf of the FLUKA collaboration CAoPAC: Computer-Aided Optimization of Particle Accelerator Workshop March 2015.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Itacil C. Gomes I.C.Gomes Consulting & Investment inc. Project X Forum on Spallation Sources for Particle Physics March 19-20, 2012 Fermi National Accelerator.
1 Activation by Medium Energy Beams V. Chetvertkova, E. Mustafin, I. Strasik (GSI, B eschleunigerphysik), L. Latysheva, N. Sobolevskiy (INR RAS), U. Ratzinger.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
International Conference on Science and Technology for FAIR in Europe 2014 APPA Cave Instrumentation for Plasma Physics Vincent Bagnoud, GSI and Helmholtz.
RESMM Workshops FermilabAD / Accelerator Physics Center Nikolai Mokhov Fermilab RESMM’15 East Lansing, MI May 10-14, 2015.
Progress survey on work on radiation damage of materials used in FAIR-facilities and further experiments suggested W. Ensinger TU Darmstadt FB Materialwissenschaft.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Achim Stahl RWTH Aachen Hadron Therapy, Jülich Oct, Workshop Nuclear Models for Use in Hadron Therapy October 8./ Achim Stahl – RWTH Aachen.
Halo Collimation of Protons and Heavy Ions in SIS-100.
VALIDATION OF THE FLUKA MONTE CARLO CODE FOR RESIDUAL PRODUCTION WITH 500 MeV/u AND 950 MeV/u URANIUM BEAM ON COPPER AND STAINLESS STEEL TARGET E. Kozlova.
Activation by Heavy-Ion Beams
INDUCED BY HEAVY-ION BEAMS IN MATTER
Halo Collimation of Protons and Heavy Ions in SIS-100
Heating and radiological
Induced-activity experiment:
Collimation Concept for Beam Halo Losses in SIS 100
Emergency dumping of proton and ion beams in SIS100 F
“hot spots” SIS100 internal beam dump Super-FRS production target
Components for the Machine-Interface Regions
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Vacuum System Failures at HERA
Steering Meeting of EuCARD
Steering Meeting of EuCARD
Beam-Induced Energy Deposition Studies in IR Magnets
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
T-489: Induced Activity and Residual Dose Rates
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
CEPC Radiation and Shielding
Presentation transcript:

Experimental and Theoretical Study of Energy Deposition and Residual Activation Induced by Uranium Ions to Model the Beam Loss Hazards in the GSI Future Facility GSI-INTAS Project Reference Number May 2004 – April 2006 Budget 90 k€

Motivation Intensities up to of U ions and 2.5·10 13 of protons are foreseen in the FAIR accelerators. Such high intensities will unavoidably be accompanied with high level of beam losses. Although the proton beam loss hazards are well understood in the accelerator community there are many unknowns in how the lost heavy ions affect the accelerator equipment and surroundings. The problems related to beam loss induced hazards can roughly be classified into three categories: 1.Residual activation. 2.Damage to the equipment. 3.Shielding.

Residual Activation It is generally recognized (although arguable) that the ‚hands-on‘ maintenance is the main beam-loss limiting factor in the proton accelerators: W=1 w/m allowed losses in a 1 GeV proton machine. There is no limiting values for heavy-ion beam losses recognized by the accelerator community so far.

Damage to the Equipment Superconducting magnets are the equipment most sensitive to the radiation damage. What is the overall heat load to the cryogenic system induced by lost particles? What beam loss level is safe against quenching? What is the tolerable beam loss level to have “reasonable” lifetime of materials with low radiation hardness like organic materials, superconducting wires and semiconducting diodes?

Shielding There are spots in the accelerators and the transfer channels with planned high beam loss level, like injection-extraction regions, aperture limiting devices, collimators, targets and beam dumps. The SHIELD code has been proven to be a reliable tool to simulate neutron yields for lost ions as high as Uranium with the kinteic energy of 1 GeV/u. It works reliably with U ions also at the top energy 37 GeV/u foreseen in the FAIR Facilities.

Structure of the Project Project Teams: INTAS (Western) GSI Darmstadt, E.Mustafin. STU Bratislava, M.Pavlovic. NIS (Eastern) ITEP Moscow, A.Golubev. VNIIEF Sarov, V.Vatulin. INR RAS Moscow, N.Sobolevskiy. Project Tasks: 1.Energy deposition measurements, A.Golubev. 2.Activation measurements, A.Fertman. 3.Modeling of the experimental set-up with the help of the SHIELD code and validation of the code with the results of the measurements, N.Sobolevskiy. 4.Use of the SHIELD code to model the beam losses into the accelerator equipment and surroundings, N.Sobolevskiy.

What is done? Task 1 Task 1 is finished in its measurement parts although still some more processing is needed Outcome 1: ATIMA modeling of the dE/dx seems to be the closest to the measurements Outcome 2: The ATIMA module should be incorporated into SHIELD The results were published as a GSI internal note, were presented in PAC05 and SHIM conferences and being prepared for publication in a scientific journal

What is done? Task 2 Part of Task 2: measurement of activation induced by 100 MeV/u and 500 MeV/u U ions on the stainless steel and copper targets is under way right these days The main difficulty we met: low level of activation and necessity of long irradiation time (main beam-time is required!) Unexpected results (report by A.Golubev)

What is done? Task 3 Simulations of the experimental set-ups with the help of the SHIELD code allowed not only good preparation of the experiments but also helped in interpreting the results of the measurements. It is desirable to include the ATIMA dE/dx modeling into the SHIELD. More details will be given in the presentation by Dr. Sobolevskiy The methodology of the measurements were presented in EPAC04 conference

What is done? Task 4 Radiation damage to the SIS100 dipoles were calculated Radiation damage to the SIS300 dipoles were calculated The results were published as GSI internal notes and presented in EPAC04 and PAC05 conferences The main outcome: the most tolerable beam loss limiting factor is not danger of quench but the lifetime of the radiation sensitive materials, like organics and semi- conducting diodes. The radiation hardness test of the semi-conducting diodes will be done at ITEP Moscow (not in the frame of this Project). The contract on this subject is almost ready to be signed between the GSI and ITEP.

What has to be done? Task 1 Task 1 is almost finished There are still measured data to be processed (especially in the 200 MeV/u case) Publication in a scientific journal (NIM, PRST?) should be prepared soon.

What has to be done? Task 2 Processing of the results of 120 MeV/u and 500 MeV/u irradiation Preparation of the 1 GeV/u activation measurements We should prepare journal publications on the activation measurements: it is required from STU Bratislava. We are preparing new INTAS proposal.

What has to be done? Task 3 ATIMA into SHIELD Understanding of the results of the activation experiments using the SHIELD code simulations Use of the other heavy-ion transport codes: PHITS, FLUKA, GEANT4 ?

What has to be done? Task 4 Although a lot has already been done in the frame of Task 4, there are still much more to be done according to the needs of the FAIR Project and this activity should be financed on much broader basis than just the GSI- INTAS funds Radiation damage to the quadrupoles of the SIS Radiation damage problems foreseen for the SFRS Radiation damage from the collimators: hardness of the surrounding equipment – pumps, electronics. Beam loss simulation of the injection-extraction points Neutron doses in and outside the tunnels of the SIS100 and SIS300 synchrotrons (RHIC problems: safety of the electronics and underground water activation)