Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.

Slides:



Advertisements
Similar presentations
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Advertisements

Status of Oxford Setup Matthew Chalk, Erik Devetak, Johan Fopma, Brian Hawes, Ben Jeffery, Nikhil Kundu, Andrei Nomerotski University of Oxford ( 18 August.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
INSTR-08, BINP, Novosibirsk 1 Belle calorimeter upgrade B.Shwartz, Budker Institute of Nuclear Physics Novosibirsk on behalf of BELLE calorimeter.
SuperKEKB 1st open meeting 1 Belle calorimeter upgrade B.Shwartz, on behalf of BELLE calorimeter group.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
21-Aug-06DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver Long baseline neutrino experiment Fermilab (Chicago)
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
AMS Tracker Data Reduction Status Claude Zurbach Laboratoire de Physique Théorique et Astroparticules – Montpellier Houston, AMS-TIM, January 08, 2007.
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Performance of Programmable Logic Devices (PLDs) in read-out of high speed detectors Jack Fried INSTRUMENTATION DIVISION PLD ? PLD ? Muon Tracker PLD Muon.
1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
Methods to reduce dead time and achieve higher trigger rate. Sparsification Event blocking Parallel DAQ systems SFI Sequencing.
B.G.Cheon Mini-Trigger/DAQ workshop,OCU ECL Trigger overview ByungGu Cheon (SKKU) Outline  ECL calorimeter  ECL trigger scheme & performance.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Digitization in EMC simulation Dmytro Melnychuk, Soltan Institute for Nuclear Studies, Warsaw, Poland.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
LKr readout and trigger R. Fantechi 3/2/2010. The CARE structure.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
Pisa - Apr. 28th, The Trigger System Marco Grassi INFN - Pisa.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
Update on works with SiPMs at Pisa Matteo Morrocchi.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
ZHULANOV Vladimir Budker Institute of Nuclear Physics Novosibirsk, Russia Beijing
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Development of new DAQ system at Super-Kamiokande for nearby supernova A.Orii T. Tomura, K. Okumura, M. Shiozawa, M. Nakahata, S. Nakayama, Y. Hayato for.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Rainer Stamen, Norman Gee
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Status of the ECL DAQ subsystems
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
14-BIT Custom ADC Board Rev. B
GRAPES-3: Status of ROOT Based Monitoring and Analysis
Mini-Trigger/DAQ workshop,OCU
PADME L0 Trigger Processor
Commissioning of the ALICE HLT, TPC and PHOS systems
CMS Preshower: Startup procedures: Reconstruction & calibration
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
BESIII EMC electronics
Trigger session report
Commissioning of the ALICE-PHOS trigger
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
The CMS Tracking Readout and Front End Driver Testing
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Presentation transcript:

Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration 2.New electronics in the experiment 3.Results on the consistency, timing and noise reduction. 4.Operation without injection veto.

Dec.11, 2008 ECL parallel session, Super B2 New+ ECL electronics New electronics Very New electronics

Dec.11, 2008 ECL parallel session, Super B3 Readout scheme (was tested with cosmic ray runs during summer shutdown) 8 Shaper digitizer were connected to ECL B3 sector (120 channels) Copper module installed in the crate near FB rack The Copper is readout by EFC PC roefc01 Trigger: Normal cosmic trigger for global run.(or of all trigger cells) ECL BE 1/8 (120 ch)

Dec.11, 2008 ECL parallel session, Super B4 New electronics channel 8 Shapers-ADC, located on the detector (outside of the protected area) 120 CsI crystalls and Premps of 1/8 of backward endcap COPPER with 2 ECL FINESSEs in ECL crate in electronic hut roefc01 BELLE DAQ To the STM board for ECL trigger Signal parameters (amplitude, time and fit quality) are evaluated in the FINESSE

Dec.11, 2008 ECL parallel session, Super B5 Parameters determination FPGA are located at FINNESE module The algorithm of energy and time reconstruction was implemented. The online software allows: To set preliminary sparsification threshold (before FPGA processing); To set output sparsification threshold (after FPGA processing), before recording to COPPER buffer; To record amplitude, time and quality, reconstructed at FPGA; To save raw sample informatin (amplitudes of 16 points) for each or some fraction of events. According to simulation the algorithm works upto 50 kHz with occupancy < 1=3.

Dec.11, 2008 ECL parallel session, Super B6 Electronics noise Incoherent noises : 5.7 channels(330keV) (outer layers) 7.1 channels(410keV) (inner layers) 10% higher than expected Coherent noises : 1.2 channels(70 keV) for 16 channels (1 module) 0.6 channels(30keV) for 120 modules On test bench we got 1.0 channel Calibration module had given big noise and was modied to have possibility to dissconect by relay. The time resolution per counter is 17/  2=12ns as expected for 35 MeV energy deposition Obtained at the summer tests with cosmic rays

Dec.11, 2008 ECL parallel session, Super B7 Test with new ECL electronics Since beginning of this experiment (exp.67) up to Oct.23, morning, ECL was running with 120 channels (1/8 of the BE) connected to 8 new shaper-digitizer boards, read out by the copper module. Other ECL channels were in the usual status. In this configuration we collected about 965 pb -1 of the statistics. From this data 4 runs with 26 pb -1 was recorded without injection veto. On Oct.23, during the maintenance time, we replaced the new electronics with the old one. Nakamura-san analized the data from the local run performed after replacement and confirmed that all changed channels are alive.

Dec.11, 2008 ECL parallel session, Super B8 Examples of events Shaded area – new electronics

Dec.11, 2008 ECL parallel session, Super B9 Energy deposition newold N peak = 2120 E peak = 3.57 Gev N peak = 2160 E peak = 3.46 Gev over 1/8 of backward endcap lg(E(MeV)) Energy deposited in one crystal

Dec.11, 2008 ECL parallel session, Super B10 Timing and background One channel time distribution Low energy hits for high energy clusters

Dec.11, 2008 ECL parallel session, Super B11 Background reduction

Dec.11, 2008 ECL parallel session, Super B12 Noise measurement old electronics new electronics Run 70 Run 90 ADC 0.05 MeV/bin

Dec.11, 2008 ECL parallel session, Super B13 Injection study HER LER all HER all events FE.and.BE bad inj.time old new

Dec.11, 2008 ECL parallel session, Super B14 Summary of the new electronics tests and plans  System works and allows to record data from COPPER  The data evaluated by FINNESSE are consistent with that taken by the old electronics  The recorded data shows parameters close to expected.  Data quality vs. injection time are studied. A decrease of veto gate looks to be possible. Plans:  Further study pile-up noise suppression  To analyse data with sampling storage to get information about time noise correlation, as well as fit procedure and hardware reliability.  To analyse run without injection veto.  Implementation of the data from the new electronics to the standard data processing procedures: cluster reconstruction, Bhabha calibration etc.

Dec.11, 2008 ECL parallel session, Super B15 Shaper ADC 18 bit Fast shaper Vref. PA ADC XILINX CYCLONE DDR DeSer. Ser control 1 2 ALTERA Parallel data Serial data 2 15 Temperature Fast out DATA Control SHAPER-ADC (temporarily) Clock, Trigger 10 New shaper-digitizer Status: the board design has been completed and agreed (Yu.Usov) with the manufacturer-company. Now the formal contract is needed to start the production of the 2 first version boards.

Dec.11, 2008 ECL parallel session, Super B16 Back up slides

Dec.11, 2008 ECL parallel session, Super B17 Local run For FASTBUS ECL electronics we perform local runs to monitor pedestals ant gain. For COPPER elctronics the pedestals are obtained from the t. We need the TP calibration to monitor gain. ECL local run has complicated structure and we use simplied procedure. The delay of start signal was adjusted to have the same time for global and TP run. The calibration signal shape agrees with the shape of the real signal within 10%. The procedure to take local run was: - start EFC in local mode - perform usual ECL local run - stop EFC - analyzed the data from EFC

Dec.11, 2008 ECL parallel session, Super B18 Summer time - goals of the test In the last summer shutdown 120 channels of the ECL BE were connected to the new shaper-digitizer boards. The goals of the test were:  Measurement of the noise and coherent noises at detector  Test of reliability of the readout at high rates  Test of calibration procedure  Long term test of the FPGA logic

Dec.11, 2008 ECL parallel session, Super B19 The signal shape was measured with cosmic rays Software was installed at roefc01 Trigger was taken from 1 TKO crate and store several local runs Using stored data we fit time shape of the signals ans prepare DSP les for FINNESSE Signal shape

Dec.11, 2008 ECL parallel session, Super B20 Calibration with cosmic rays

Dec.11, 2008 ECL parallel session, Super B21 Consistency We searched for possible events with some inconsistence in FASTBUS and COPPER data Shaded area – new electronics

Dec.11, 2008 ECL parallel session, Super B22 Electronics noise Incoherent noises : 5.7 channels(330keV) (outer layers) 7.1 channels(410keV) (inner layers) 10% higher than expected Coherent noises : 1.2 channels(70 keV) for 16 channels (1 module) 0.6 channels(30keV) for 120 modules On test bench we got 1.0 channel Calibration module had given big noise and was modied to have possibility to dissconect by relay.

Dec.11, 2008 ECL parallel session, Super B23 Timing The time resolution per counter is 17/  2=12ns as expected for 35 MeV energy deposition

Dec.11, 2008 ECL parallel session, Super B24