Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,

Slides:



Advertisements
Similar presentations
Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Project Plan Development
Tevatron BPM Upgrade Project Manager Overview Stephen Wolbers Tev BPM Technology Choice Review December 16, 2003.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Director’s Review 5/5/03 Spalding1 The Run II Upgrade Program Director’s Review May 2003 Program of upgrade projects in MI-Accumulator-Tevatron and the.
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
INGAS SPA2 Meeting, Regensburg, October 13 th 2011 INGAS INtegrated GAS Powertrain 1 SPA2 Meeting Regensburg, Month 37, Turbo DI CNG Engine Alois Fürhapter,
Loading data into the ETC and into the MPM Baseline.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Luminosity expectations for the first years of CLIC operation CTC MJ.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Fermilab Run 2 Accelerator Status and Upgrades
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 draft NO A WBS J. Cooper NO A Working Group Meeting June 29,2005 Work is the effort of Ron, Dave, Bill, Suzanne, Harry, not just me.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
Eric Prebys LARP Program Director July 14, LARP FY10 and Beyond - E. Prebys 2 Guidance: LARP funding decreases $1M/yr Assume: $13 M LARP total for.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Proton Plan PMG 7/27/06 J. Sims 1 Proton Plan Cost and Schedule Report Jeff Sims.
O. Kester, NuSTAR annual meeting, 27/02/2013
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
PIP-II Resource Loaded Schedule (RLS) ---- Step Luisella Lari 13 May, 2016.
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Preparations for a Lehman Review
Conventional Facilities
Presentation transcript:

Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview, Summary Resource Loaded Schedule and Luminosity Projection Performance Models 1.1. Tevatron Modeling 2.2. Antiproton Production Subproject Technical Status and Plans 1.Slip-Stacking Studies 2.Slip-Stacking Beam Loading Compensation 3.Antiproton target Station Upgrade 4.Lithium Lens Upgrade 5.AP2 and Debuncher Acceptance Upgrade 6.Accumulator Stacktail Cooling Upgrade 7.Electron Cooling 8.Rapid Transfers 9.Increased Beam Separation and Active Beam-Beam Compensation in Tevatron

Director’s Review 5/5/03 Spalding DRAFT RLS 2 RLS Methodology  Each project leader defines their WBS (at an appropriate level for their planning – typically level 4-6)  Over 550 tasks  Estimates M&S costs (document>$200K), task duration and links and assigns resources (named where possible) (study shifts are a resource)  “Quality of Estimate” assigned to each task Interpretation: (a)=eng concept or vendor info – 20% (b)=initial concept design or done similar before – 40% (c)=guess, but we know this sort of thing – 60% (d)= scope not yet fully defined  place holder – 100% WBS at project level 3

Director’s Review 5/5/03 Spalding DRAFT RLS 3 RLS Methodology  Contingency rolled up (45% M&S, 47% Labor) and is assigned by FY with a bias to later years  No schedule contingency is included  Labor costs are actual Beams Div SWF by “resource category” corrected to 2004  Access to tunnels allowed for 1 day jobs, otherwise fit in lab’s shutdown schedule FTE

Director’s Review 5/5/03 Spalding DRAFT RLS 4 M&S Cost Estimate  $9.4M Base + $4.3M Contingency = $13.7M Total  Cost Drivers…

Director’s Review 5/5/03 Spalding DRAFT RLS 5 M&S Cost Drivers Slip Stacking PAs ($0.5M) Stacktail Upgrade TWTs ($1M) Long Separators ($1.3M) ($0.6M) ($0.3M)

Director’s Review 5/5/03 Spalding DRAFT RLS 6 Labor Cost Estimate  $12.7M Base + $6.1M Contingency = $18.8M Total

Director’s Review 5/5/03 Spalding DRAFT RLS 7 Cost Profile  Contingency weighted to later years

Director’s Review 5/5/03 Spalding DRAFT RLS 8 Milestones and Phases  Milestones  Interim progress  Subproject completion  Program phases  Program/scope evaluation  these are “project milestones”, not “reporting milestones”  Phases 1.Debuncher upgrade and MI dampers in FY03 plan 2.Slip-stacking, some Acc 3.RR+e-cool and Rapid Transfers 4.Upgrade to stacktail cooling 5.Final Acc and Tev helix + beam-beam Nov-04 Feb-05 Nov-5 Apr-07

Director’s Review 5/5/03 Spalding DRAFT RLS 9 Milestones and Phases Completion milestone for each subproject Shutdowns  Fermilab draft long range schedule

Director’s Review 5/5/03 Spalding DRAFT RLS 10 Milestones and Phases Evaluate Tevatron upgrade plan Evaluate RR & e-cool commissioning Evaluate integration plan for RR & e-cool

Director’s Review 5/5/03 Spalding DRAFT RLS 11 Milestones and Phases Slip-Stacking (stack in Accumulator) RR & e-cool (stack in RR, but stacktail rate limited) Stacktail Upgrade Tevatron Upgrades AP2&DB Upgrades

Director’s Review 5/5/03 Spalding DRAFT RLS 12 Luminosity Projection (work in progress) Recipe:  Combine  the parametric modeling (pbar production and Tevatron)  the schedule (phase milestones)  Add ramp-up following each shutdown and as a learning curve for the start of each phase Sensitivity to parameters  Determine sensitivity to key parameters  there are many – so at least a few key ones Put it together…

Director’s Review 5/5/03 Spalding DRAFT RLS 13 Conclusion  Define(d) scope for the upgrades  Developed Phased Plan  Plan reaches peak luminosity of ~2.9x10 32 cm -2 s -1 with a stacking rate of 40x10 10 /hr  Schedule, cost and luminosity estimates ~bottom up  Overall scale of the cost and effort is in line with the Run IIb Plan (Dec 2001)  Preparing Documentation  And making good technical progress on the projects!