Queen Anne’s County Public Schools New Construction of the Matapeake Middle School.

Slides:



Advertisements
Similar presentations
ELEMENTARY SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships.
Advertisements

Samanthas Performing Arts Centre By Sam. Why Create a Performing Arts Center? The reason that we need a Performing Arts Centre at Dio, is because we are.
Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.
1 Zero Tax Increase Referendum: Community Information Session.
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
By Annelies Kuypers. For this competition I had to do the following things- Design a performing arts centre for Dio and make at least 2, no more than.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
BOE Goal: Study long-term facility needs All patrons invited to join Each building and special education co-op represented KIDS Committee met.
Current Project Update October 25th 2012 Good Evening!!!
INTRODUCTION : Throughout history The family is the first and best teacher in the community. And has a big role in the upbringing of.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
RENOVATION & ADDITION OPTIONS TORONTO DISTRICT SCHOOL BOARD NORTH TORONTO COLLEGIATE INSTITUTE REDEVELOPMENT STUDY.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
Quarterly Report September 9, I Lafayette Elementary - New flooring.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Haverford Middle School 6 th Grade Orientation. Welcome Mr. Daniel J. Horan, Principal Ms. Elizabeth Mastrocola, 6 th grade administrator Mr. John Berardoni,
Glenvar High School Renovations School Board Presentation
Jim Ned CISD School Bond Election May 8 th, 2010.
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
Peachtree Charter Middle School Dunwoody, Georgia Project of Distinction – New Construction Middle/Junior High School Cooper Carry, Inc Exhibition.
C APITAL I MPROVEMENT PROGRAM FY 2015/16 – FY 2020/21 August 14, 2014.
Important Places in School THE OFFICE IS AT THE MAIN ENTRANCE TO THE SCHOOL. IT IS THE MOST IMPORTANT OFFICE IN THE SCHOOL. YOU WILL FIND THE PRINCIPAL’S.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Haverford Middle School Cafeteria & Building tour.
ADDITION & REMODEL Eugene Field Elementary School.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
Designing and Programming Schools As Community Learning Centers Firestone/Litchfield Community Learning Center Community Update September 27, 2011 Community.
Smith Farm Elementary. Smith Farm Address: 4250 Johnny Knoll Ln. Winston-Salem, N.C Final Project of the 2006 Bond 89,753 Square Feet 46 - Total.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
Swiftwater Elementary Center Swiftwater, Pennsylvania Project of Distinction Elementary School Gilbert Architects Inc Exhibition of School Planning.
Design Development Review
HIGH SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
KONYA SCIENCE AND ART CENTER TÜRKİYE. KONYA BİLSEM (BİLİM VE SANAT MERKEZİ)
15 April 2010 Georgian Heights Alternative Elementary School New Building and Site Plan.
St. Cloud High School Phased Comprehensive Construction Project April 28,
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Learning, Health, and Safety Capital Project Alternates and Change Order
HALL HIGH SCHOOL NEW SCHOOL PROJECT MARCH 28. Main entrance & cafeteria windows Main entrance.
MIDDLE SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
Network Assignment N. Stewart- MEDT 7477 The school used for the networking mapping assignment is Madras Middle School. Madras Middle School is located.
Marietta Center for Advanced Academics: Grades 3-5 IDF This “mini-IDF” connects to the Media Ctr IDF MDF The media ctr. IDF connects everything in the.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
FORSYTH COUNTY SCHOOLS 2014 CAPITAL PROGRAM TIMELINE LOCATIONCONSTRUCTION PROJECTARCHITECTA/E STARTGC/CMOPENSUMMARY STATUS HIGH SCHOOL ADDITIONS AND MODIFICATIONS.
Willard and DiLoreto Hall Renovation and Addition
Environment Matters “The Library’s space is your place!” Revisions in Red!
Quarterly Report August 23,  Bond implementation has been underway for 2.5 years  Three phase implementation ◦ Phase 1 began February, 2007 ◦
FREDERICK COUNTY MIDDLE SCHOOL TOUR
White Pigeon Community Schools
What do we have at school?
Community Meeting, July 18, 2016 Update Designs and Phasing
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Main entrance To the hall.
Goding Elementary Existing Conditions Presentation February 13, 2013.
Miami Palmetto SHS Replacement
Silver Lake Regional High School
21st Century School Buildings Plan
Cafeteria Entrance to media center
Cafeteria exit exit Entrance to media lobby 12
BY HERBER.
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
PE/MULTI-PURPOSE ROOM COVERED OUTDOOR LEARNING CENTER
Strickland Middle School
Model presentation How to do it.
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
EAST PENNSBORO AREA SCHOOL DISTRICT
A. Write the correct numbers !
Presentation transcript:

Queen Anne’s County Public Schools New Construction of the Matapeake Middle School

Entrance canopy reflects a nautical theme apropos of the Maryland shore locale.

Upon entering the school all visitors are directed through the administration office for security reasons.

Administration office and secure entrance leads out onto the promenade.

The “promenade” that forms a ship’s hull extends from the main entrance through the back entrance of the building and separates the public use spaces from the main academic portions of the building.

Entrances to the Guidance and Music Suites from the promenade.

Choral music room.

Band music room.

Multi-purpose room combines a gymnasium and auditorium for small and large groups. The gym can be divided by a retractable curtain and the stage can be closed off with a folding partition for use as an auxiliary gym/fitness center or additional rehearsal space.

Media center entrance from corridor.

Media center reading area.

Media center stacks and study area with natural light from the exterior courtyard.

Media center includes teaching, study, and reference areas as well as access to computer labs, work rooms and both main corridors of the building.

A computer room is located adjacent to the media center for research and writing instruction.

Art room is adjacent to the exterior courtyard for natural light and outdoor sketching area.

The courtyard creates a small gathering/teaching space as well as allowing natural light in to the media center and art classroom. Use of crushed shells as mulch and stamped concrete in “wave” patterns perpetuate the nautical theme.

The cafeteria is located off the main promenade for easy access by students and off-hour use by the public.

Natural lighting in the cafeteria.

Science classroom.

Non-tidal wildlife area behind the building provides an outdoor environmental classroom.