UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Senior Thesis Presentation 2009 The Pennsylvania State University.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
C AMPUS S QUARE H ARRISBURG, P ENNSYLVANIA A NDREW M ARTIN | C ONSTRUCTION M ANAGEMENT | A PRIL 12, 2010.
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
The Office Building Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Brett Miller | Construction Option Advisor: Dr. Ed Gannon.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Project Overview Analysis #1: Masonry Acceleration Adjusting the Critical Path Savings Potential Analysis #2: Façade Dimensioning Evenly Sized Elements.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Wardman West Residential Penn State AE Senior Thesis Project Kevin Kroener │Construction Option Faculty Advisor │Ray Sowers.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Student Health Center Jacob Brambley - AE (structural option)
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
PENN STATE AE SENIOR CAPSTONE PROJECT Adam Lasher │Construction Management Dr. Robert Leicht Susquehanna Health Patient Tower Expansion Williamsport, PA.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Philip Mackey The Pennsylvania State University Architectural Engineering L/E Option HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Holy.
AE Senior Thesis Natalie Bockhorst│Construction Management Chimay Anumba, PhD. PE Advanced Individual Training A.I.T. Barracks Fort Eustis, VA.
North Hall | American University| Washington D.C.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Redifer Commons Addition & Renovation Project
Introduction James W. & Frances G. McGlothlin Medical Education Center
Ryan Johnson - Structural Option
FDA CDRH Laboratory Timothy Mueller Senior Thesis, Spring 2006
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
the Franklin Square Hospital Center
Justin Pennycoff AE Senior Thesis 2008 Construction Management
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Senior Thesis Presentation 2009 The Pennsylvania State University

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Conclusion Questions Overall Goal: Determine ways in which to reduce the cost and schedule Outline

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management UPMC Passavant is a member of the University of Pittsburgh Medical Center system Recently ranked 14 th among ‘America’s Best Hospitals’ by U.S. News & World Reports Integral part of the long term healthcare goals of UPMC Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Conclusion Questions Client Information

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Conclusion Questions Pittsburgh, Pa I-79/I-76 Area Map Size 191,400 SF Addition 18,000 SF Penthouse 30,000 SF Central Plant Cost $85.9 Million Schedule NTP: November 2007 Addition: Spring 2008 – Fall 2009 Renovation: Fall 2009 – Spring 2010 Project Information 9100 Babcock Blvd., Pittsburgh, Pa 15237

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Problem Statement Masonry veneer is not panelized and requires substantial time and space. Located on the critical path and controls the installation of the curtain wall and metal panel system. Goal Accelerate the schedule Reduce Costs Reduce Site Congestion Project Overview Architectural Precast Concrete Site Logistics Structural Breadth Schedule Cost Matrix Schedule Mobile Information Technology Documents Conclusion Questions Architectural Precast Concrete vs. Masonry Brick Veneer

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Site Logistics Structural Breadth Schedule Cost Matrix Schedule Mobile Information Technology Documents Conclusion Questions

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Site Logistics Structural Breadth Schedule Cost Matrix Schedule Mobile Information Technology Documents Conclusion Questions Site Logistics Existing Hospital Pavilion Footprint

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Site Logistics Structural Breadth Schedule Cost Matrix Schedule Mobile Information Technology Documents Conclusion Questions Material Weights MaterialDensity (lb/ft 3 )Thickness (in.)Weight (lb/ft 2 ) Brick Veneer Precast Concrete Panel Characteristics Density of Concrete:150 pcf Thickness of Panel:0.5 ft Weight of Panel:75 psf Max. Panel Height:14 ft Tributary Area:9.33 ft Structural Implications Typical Bay: 28’-0 3 Equal Spaces of 9’-4” Edge Beams: W24x55 Cant Beams: W10x22

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Site Logistics Structural Breadth Schedule Cost Matrix Schedule Mobile Information Technology Documents Conclusion Questions W10x22: φ b M px = 97.5 ft-k > ft-k OK φV n = 73.2 k > k OK W24x55 φM n = 503 ft-k > 323 ft-k OK φV n = 251 k > k OK Shear & Moment Deflection ∆ max = (Pa / 24EI)(3l 2 – 4a 2 ) = 1.19 in ∆ = l/240 = 28 ft (12 in) / (240) = 1.4 in > 1.19 in OK Column W12x72 φP n = 761k P u = 725k OK

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Site Logistics Structural Breadth Schedule Cost Matrix Schedule Mobile Information Technology Documents Conclusion Questions Durations Comparison of Durations Masonry vs. PrecastMasonry & Metal Panel vs. Precast ElevationMasonryPrecastMasonryMtl. PanelPrecast South15 Days2 Days15 Days 3 Days East20 Days2 Days20 Days15 Days3 Days North10 Days2 Days10 Days--2 Days West15 Days2 Days15 Days 2 Days Average Masonry Duration: 15 Days Average Precast Duration: 2 -3 Days Based Upon Panels/Day Comparison of Critical Path Dates StartCompletion ActivityOriginalProposedOriginalProposed Masonry Studs/Sheathing8/4/2008 8/29/20088/5/2008 Masonry Veneer/Cast Stone South9/1/20088/11/20089/19/20088/12/2008 Masonry Veneer/Cast Stone West9/22/20088/13/200810/10/20088/14/2008 Substantial Completion G-38/25/20097/30/2009 Substantial Completion 4-69/29/20099/3/2009 Time Savings of Up To 18 Days

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Site Logistics Structural Breadth Schedule Cost Matrix Schedule Mobile Information Technology Documents Conclusion Questions Summary of Material Costs & Savings (With Metal Panels) ElevationItemSFCost/SFCostTotal/Elevation SouthPrecast2849$35.00$99, Masonry2802$74.00-$207, Louver47$ $22, $130, EastPrecast4907$35.00$171, Masonry1952$82.00-$160, Masonry2955$17.00-$50, $38, NorthPrecast2434$35.00$85, Masonry2434$23.00$55, $29, WestPrecast2902$35.00$101, Masonry3148$68.00-$214, Curtain wall103$120.00$12, $100, Proposed Savings-$239, $239,700 Summary of Material Costs & Savings (Without Metal Panels) ElevationItemSFCost/SFCost Total/Elevatio n SouthPrecast5933$35.00$207, Masonry-2802$74.00-$207, Metal Panel-3274$53.46-$175, Louver-47$ $22, $197, EastPrecast5384$35.00$188, Masonry-1952$82.00-$160, Masonry-2955$17.00-$50, Metal Panel-475$53.46-$25, Louver-144$ $22, $116, NorthPrecast2643$35.00$92, Masonry-2434$23.00-$55, Metal Panel-209$53.46-$11, $25, WestPrecast4742$35.00$165, Masonry-3148$68.00-$214, Curtain wall103$120.00$12, Metal Panel $98, $134, Proposed Savings-$422, $422,175

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Site Logistics Structural Breadth Schedule Cost Matrix Schedule Mobile Information Technology Documents Conclusion Questions Conclusion Time Savings of Up to 18 Days Cost Savings of Between $240,000 and $422,000 Reduces the Site Space Required by Masons

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Current Sequence Sequence by Zone Sequence by Floor Issues Mobile Information Technology Documents Conclusion Questions Matrix Scheduling Problem Statement Project delays are often unavoidable and a means by which to recover must be determined. Goal Accelerate the schedule Recover Schedule Delays

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule CurrentSequence Sequence by Zone Sequence by Floor Issues Mobile Information Technology Documents Conclusion Questions Current Sequencing

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule CurrentSequence Sequence by Zone Sequence by Floor Issues Mobile Information Technology Documents Conclusion Questions Current Sequencing R Zone 1Zone 2 Zone 3

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Current Sequence Sequence by Zone Sequence by Floor Issues Mobile Information Technology Documents Conclusion Questions Proposed Sequencing By Zone

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Current Sequence Sequence by Zone Sequence by Floor Issues Mobile Information Technology Documents Conclusion Questions Proposed Sequencing By Zone R Zone 1Zone 2 Zone 3

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Current Sequence Sequence by Zone Sequence by Floor Issues Mobile Information Technology Documents Conclusion Questions

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Current Sequence Sequence by Zone Sequence by Floor Issues Mobile Information Technology Documents Conclusion Questions Proposed Sequencing By Floor R Zone 1Zone 2 Zone 3

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Current Sequence Sequence by Zone Sequence by Floor Issues Mobile Information Technology Documents Conclusion Questions

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Original Schedule Matrix Comparison Mobile Information Technology Documents Conclusion Questions Schedule Comparison Comparison of Schedule Dates FloorOriginalSequencing By ZoneSequencing By Floor StartCompleteStartCompleteStartComplete 14/29/20087/7/20095/19/20085/29/20096/23/20084/24/ /2/20087/14/20095/26/20086/5/20097/14/20085/11/ /6/20087/21/20096/2/20086/12/20098/4/20086/5/ /12/20088/7/20096/9/20086/19/20098/25/20086/26/ /13/20088/7/20096/16/20086/26/20099/15/20087/17/ /16/20088/25/20096/23/20087/3/200910/6/20088/7/2009

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Original Schedule Matrix Comparison Mobile Information Technology Documents Conclusion Questions Conclusion The alternative matrix schedules allow for savings of between 8 and 13 weeks. Sequencing by zone would be ideal for a recovery schedule Sequencing by floor would be ideal for a schedule from the beginning.

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions Mobile Information Technology Documents Problem Statement Increasing the use of mobile information technology within an industry segment averse to its use. Goal Develop Implementation Plan Reduce Costs

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions History Construction Communications

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions Current Information Transfer Process ARCHITECTOWNER CM Costs of Accurate & Timely Information 2000 Economist Magazine Study 30 % of construction projects cost attributed to the lack of timely information. 60 % of which is labor costs 10 % of which is material costs

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions Process with Mobile IT ARCHITECTOWNER CM CENTRAL SERVER Digital Construction Documents Digital Updates/As-Builts Checklists/Inspections Reduce use of paper drawings Communication in the field Limited only by the system and the project team Uses of Mobile IT

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions Uses at UPMC Electronic As-Built Drawings Progress/Foremen Meetings

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Contractor Perspectives Advantages Information always in the hand of field workers Compact size compared to set of drawings Notes can be permanently attached to drawings Lessening of administrative functions Will Paper Drawings Be Replaced? Many believe that the increase of digital drawings will reduce need for paper versions. Will further decrease as younger generations move into the industry Just in time printing would be a viable option Expansion of use will increase with decrease in cost Disadvantages Changes may bypass the office Ability to view large drawings on a small screen Only as good as the effort that goes into maintaining the system Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Costs of Paper Construction Documents Costs of Document Reproduction ContractorSetsPurposeCost/SetCost General2Staff$ $2, Subcontractors$ $23, Subcontractor20Field Staff$ $23, Total Cost:$48, Copies/Project =~$145,000 Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Roadblocks to Implementation The Center for Construction Research and Training. The Construction Chart Book. Silver Spring, Md.: CPWR, 2008 Average age of construction workers: 39 years old 54% of CMs and 52% of Foremen were Baby Boomers Aging demographic not comfortable with computers Many have no experience with computers even at home Lack of experience = Lack of confidence Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Implementation Plan Training Give users confidence Mobile Computers Basis of the whole system Large Screen Displays Digital Kiosks Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions Conclusion The use of any or all of these proposed systems or schedules have the ability to result in a positive schedule and budget adjustment. The alternative precast will save up to 18 days and between $240,000 and $422,000. Matrix scheduling allows for a savings of between 8 and 13 weeks depending upon the sequencing used. This time savings could be utilized for delays or initially. Mobile IT Documents will allow for a more efficient updating process and communication flow.

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions Acknowledgments I would like to thank my friends and family for all their support throughout the past 5 years. Fellow AE Students & Members of the Bat Cave

UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Project Overview Architectural Precast Concrete Matrix Schedule Mobile Information Technology Documents Background Use at UPMC Implementation Plan Conclusion Questions