Federal Aviation Administration 2011 V&V Summit: Verification & Validation Overview Presented by: John Frederick Date:10/19/11.

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

Idea to In-Service (I2I) V&V Process Harry Bilicki, ANG-E72 Wanda Lopez-LaBarbera, ANG-E72.
1 Safety Assurance JPDO Perspective Maureen Keegan 11 October, 2012.
System Integration Verification and Validation
Presented by: Leslie H. Smith, Manager Flight Technologies and Procedures Division, AFS-400 AVS Acquisition Executive Board (AEB) Member Date: October.
Chapter 4 Quality Assurance in Context
HACCP Validation The FSIS Perspective Charles Gioglio FSIS/OPPD Director, Meat and Poultry Advisory Committee Staff.
ISO 9001 : 2000.
Satellite Notification and Acceptance Program (SNAP)
CLEANROOM SOFTWARE ENGINEERING
A brief overview What is program evaluation? How is an evaluation conducted? When should it be used? When can it be used? Used with Permission of: John.
Federal Aviation Administration Presented to: Network Centric Demonstrations and Prototypes Technical Interchange By: Deborah Young Date: November 4, 2009.
PRJ270: Essentials of Rational Unified Process
1 Independent Verification and Validation Current Status, Challenges, and Research Opportunities Dan McCaugherty IV&V Program Manager Titan Systems Corporation.
Presented to: By: Date: Federal Aviation Administration Aviation Software Systems for the Second Century of Flight Research and Roadmap Thoughts High Confidence.
SwE 434. Rational Quality Manager Rational Quality Manager is a collaborative, Web-based tool that offers comprehensive test planning, test construction,
Presented to: MPAR Symposium II By: James Williams – Director, Systems Engineering and Safety Date: 17 November 2009 Federal Aviation Administration Multifunction.
Configuration Management
FPSC Safety, LLC ISO AUDIT.
Release & Deployment ITIL Version 3
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
Training on “CMMI for Development – ver 1.2”
Introduction to ISO New and modified requirements.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Semantic Knowledge Bases and Be Informed for the FAA Dr. Brand Niemann Director and Senior Enterprise Architect – Data Scientist Semantic Community
CLEANROOM SOFTWARE ENGINEERING.
Software Systems Verification and Validation Laboratory Assignment 3 Integration, System, Regression, Acceptance Testing Assignment date: Lab 3 Delivery.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
NextGen: Changes to Strengthen Validation and Verification Jay Merkle Director, Enterprise System Integration October, 2011.
Software Configuration Management (SCM)
Federal Aviation Administration Federal Aviation Administration 1 Presentation to: Name: Date: Federal Aviation Administration AMHS Security Security Sub-Group.
Method Validation and Verification: An Overview Patricia Hanson, Biological Administrator I Florida Department of Agriculture and Consumer Services, Food.
SQA System Overview Chapter 4. Where we have been so far, Where we are going Where do software errors come from? What is quality? How can quality be measured?
Presented at: Demonstrations and Prototypes TIM 7 Presented by: Dominic Timoteo / Shoeb Jafri SWIM Implementation Team May 04, 2011 Federal Aviation Administration.
Research Focused Cyber Evaluation Mr. Douglas E. Stetson 29 May 2014.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Presented to: By: Date: Federal Aviation Administration SWIM Governance Demonstration and Prototyping Information Exchange Briefing Paul Jackson November.
HIT Policy Committee NHIN Workgroup Recommendations Phase 2 David Lansky, Chair Pacific Business Group on Health Danny Weitzner, Co-Chair Department of.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Webinar for FY 2011 i3 Grantees February 9, 2012 Fiscal Oversight of i3 Grants Erin McHughJames Evans, CPA, CGFM, CGMA Office of Innovation and Improvement.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
Presented to: Verification and Validation Summit By: James Daum NextGen and Operations Planning Safety Manager AJP-1900 Date: November 05, 2009 Federal.
Federal Aviation Administration Acquisition Career Certification & Management Rebecca Deloney Acquisition Career Management November 4, 2009.
Presented to: By: Date: Federal Aviation Administration Quality and Standards Team (QST) In-Service Management Gold Standard ATO Acquisition Practices.
QUALITY MANAGEMENT STATEMENT
Presented to: By: Date: Federal Aviation Administration ADS-C CDP Climb/Descend Procedure Implementation Project Update IPACG/39 Keith Dutch, FAA 03 –
1 Interim Report of the IWGDD May Overview: Pursuing Goals to Harness the Power of Digital Data for Science and Society The IWGDD recommends that.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
By: Date: Federal Aviation Administration Focus on the Future 8 th Annual V&V Summit 2012 John Frederick Test Standards Board Chairperson Manager, V&V.
1 V&V Needs for NextGen of 2025 and Beyond A JPDO Perspective Maureen Keegan JPDO Integration Manager October 13, 2010.
Presented to: By: Date: Federal Aviation Administration A Three Test Programs For Flight Service V&V Summit #5 Eric Hoover, Test Director / Core.
By: Date: Federal Aviation Administration NextGen Overview Storyboard 10 th Annual Verification & Validation Summit Harry William Bilicki September 24.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Software Engineering Modern Approaches Eric Braude and Michael Bernstein 1.
The Service Monitoring and Control Toolkit 1 Protect your business with an effective alert management system and high service availability.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
V&V Challenges, Successes, and Ideas for Improvement an In-Service Management View Presented to: Verification & Validation Summit #5 By: Jennifer Duffy,
Presented by: Laurie Camilien-Pietrak, AVS Date: November 4-5, 2009 Federal Aviation Administration FAA Aviation Safety (AVS) Role in V&V.
Presented to: By: Date: Federal Aviation Administration Friends and Partners in Aviation Weather Michele Merkle, Federal Aviation Administration Director.
FIMS Data Quality FIMS Annual Training May 10-12, 2016 Prepared by: Mark Gordy and Gayle Smith.
U.S. Department of Education Office of Special Education Programs General Supervision: Developing an Effective System Implications for States.
Successful Verification
Development Projects / Analysis Projects / On-site Service Projects
Level - 3 Process Areas (CMMI-DEV)
Engineering Processes
Engineering Processes
Presentation transcript:

Federal Aviation Administration 2011 V&V Summit: Verification & Validation Overview Presented by: John Frederick Date:10/19/11

2 Federal Aviation Administration V&V Overview 2 what how why V&V goals Doing V&V V&V concepts

3 Federal Aviation Administration V&V Overview 3 V&V Goals: Why V&V? 1.Quality products 2.Problem prevention, detection, and resolution as early in the lifecycle as possible Build an effective system efficiently

4 Federal Aviation Administration V&V Overview 4 V&V Concepts: How to do V&V Focus on key work products Verify and validate against reliable criteria –Standards –Requirements –Templates –Previously V&Ved work products V&V is used as a basis for key decisions Perform V&V Early and Incrementally

5 Federal Aviation Administration V&V Overview 5 Doing V&V: What should V&V do Verification- Ensures that selected work products meet their specified requirements Validation- Demonstrates whether a product or product component will fulfill its specified purpose when placed in its intended environment V&V is broader than T&E. The performance of T&E supports the goals of V&V.

6 Federal Aviation Administration V&V Overview 6 Implementing V&V in the Product Lifecycle

7 Federal Aviation Administration V&V Overview 7 Status of V&V in the FAA V&V policy and guidelines in place –Still needs to be put into practice –V&V Guidelines updates and tools needed Test standards established and evolving –Updating T&E policy and processes to address NextGen needs –Test Standards Board providing technical, standards, and process support V&V capabilities needed for NextGen –New V&V methods and lab capabilities –Focus on system-of-systems simulation and modeling