15 April 2008 24th ALICE RRB J. Schukraft 24 th ALICE RRB Collaboration News Project Status  Production (TOF, TRD, PHOS, PMD)  Installation  Commissioning.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
First Physics at the LHC ALICE Bjørn S. Nilsen Creighton University.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
ALICE DAQ Plans for 2006 Procurement, Installation, Commissioning P. VANDE VYVRE – CERN/PH for LHC DAQ Club - CERN - May 2006.
October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 CTP offline software status (Offline week) A.Jusko and R.Lietava.
1 Responsibilities & Planning DCS WS L.Jirdén.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
1 CERN related research program in Nuclear Physics High energy nuclear physics –ALICE experiment »Installation and Commissioning »Data taking.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
13 Oct th ALICE RRB J. Schukraft 29 th ALICE RRB Collaboration News Detector Status Physics Results CERN-RRB
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
The ALICE Experiment at the CERN LHC P. Kuijer for the Alice collaboration ICHEP 2002.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  continuing well, approx 2-4 month delay in some areas  NEW schedule:
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
28 April th ALICE RRB J. Schukraft 16th ALICE RRB Collaboration Status Project Status  Integration, large structures  Detectors (selection) 
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
20 February 2008 LHCC Status Report J. Schukraft ALICE Status Report to LHCC February 2008 Collaboration News Project Status  Production (TOF, TRD, PHOS,
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
(Alice COsmic Ray Detector) Status Report
DCS Status and Amanda News
25th ALICE RRB J. Schukraft
ALICE Status Report to LHCC September 2008
LHC experiments Requirements and Concepts ALICE
ALICE Status 4th CERN-Korea meeting
ALICE – First paper.
IEEE NPSS Real Time Conference 2009
Commissioning of the ALICE HLT, TPC and PHOS systems
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
Experience between AMORE/Offline and sub-systems
Preparation of the CLAS12 First Experiment Status and Time-Line
TPC Detector Control System
Presentation transcript:

15 April th ALICE RRB J. Schukraft 24 th ALICE RRB Collaboration News Project Status  Production (TOF, TRD, PHOS, PMD)  Installation  Commissioning CERN-RRB

24/10/ rd RRB J. Schukraft 2 Collaboration News New Institutes  Purdue (USA) EMCAL  Tennessee (USA); EMCAL  Yonsei (Korea) TRD, Physics  Pusan (Korea): replaces Pohang which left end 2007 Physics  Istanbul (Yildiz Technical University, Turkey) Physics  associate member while looking for increased funding Institutes leaving  IPE Karlsruhe (Germany) leaving ALICE  associate member, completed its technical contribution to the TRD electronics Ongoing discussions  Houston (USA, awaiting DOE approval) EMCAL, Grid computing  Comsats, Pinstec (Pakistan) Physics, computing

24/10/ rd RRB J. Schukraft 3 end 2001early 2008 Collaboration News Elections/Nominations  Management Board: 4 members re-elected for 3 years  E. Nappi (Bari), R. Kamermans (NIKHEF/Utrecht),  Y. Schutz (Nantes), J.P. Revol (CERN)  Editorial Board chair:  H. A. Gustafsson (Lund) re-elected for 3 years  Since 5 April: Technical Coordinator: L. Leistam; Deputy TC: W. Riegler  Special thanks to C. Fabjan, who lead ALICE as TC from 2001 to 2008 ALICE Industrial awards (April 2008)  Xilinx Inc, San Jose, CA  close collaboration and support for high end FPGAs used in HLT and TRD

24/10/ rd RRB J. Schukraft 4 Funding: EMCAL DOE CD2/3 review of EMCAL 18/19 December  outcome: EMCAL is now approved and funded in the US !  help and participation from France/Italy/CERN recognized and appreciated by DOE  Total Project Cost: 13.5 M US$  not including R&D money, emcal support, CF contribution (~ 500 k CHF), computing  Schedule:  production started in April  trying to accelerate by 1 year (cash flow)  Computing Resources: proportional to PhDs (~ 7% for 40 PhD’s in 2012)  computing plan submitted to DOE, under discussion

24/10/ rd RRB J. Schukraft 5 Funding: UK Biennial STFC Programmatic Review March 2008  had to deal with a very significant funding shortfall (80 M £ /3 y)  => classification & ‘re-prioritisation’ of all scientific activities & grants in 4 categories  ALICE/STAR lower priority => Funding at risk  consultation period ended 21 March, under consideration. Final outcome 1 July.  reactions submitted by several sources/individuals (ALICE, NuPECC, …) Impact on ALICE:  1 UK group (Birmingham, 10 th biggest group in ALICE since merger with STAR!)  physics: significant role in analysis (particle production, strangeness, cross sections,..)  hardware: sole responsible for production/commissioning/expert operation of trigger  trigger: hardware (electronics) + ‘firmware’ (specialized low level code) + software (UI)  hardware: production & installation of components is complete  firmware: commissioning just started, complete only some time after Pb run (end 2009)  expert operation & intervention: required throughout the lifetime of ALICE A well commissioned and working trigger is vital for any operation of ALICE Disengagement or disintegration of the trigger group would be a disaster !

24/10/ rd RRB J. Schukraft 6 ALICE Detector TPC PHOS Muon arm TOF TRD HMPID PMD ITS ACCORDE

24/10/ rd RRB J. Schukraft 7 EMCAL support November 2007

24/10/ rd RRB J. Schukraft 8 29 Nov 2007: Descent of the last big structure ‘Mini frame’

24/10/ rd RRB J. Schukraft 9 TRD (fully funded since 2006) Chambers: 430 chambers done (~80% completed; expect to be done by Oct. 08) GSI, U. Hd, U. Frankfurt, JINR, Bucharest Electronics:  R/O board & MCM production transferred to industry 2nd half of production being optimized for yield  TRD pre-trigger: partially installed - under test  GTU fully implemented and debugged Assembly  2 super modules installed, 2 more done; end of assembly March 09  1 SM fully tested at CERN in PS beam  noise performance identical to lab test noise performance during cosmic run with B-field w/o B-field Excessive gas leakage discovered during SM test  TRD chambers have been tested for diffusive 0 2 leaks and are within specs  however, large viscous leaks found during supermodule beam test in PS  leaks localized and all chambers will be repaired (Xenon is expensive !)  consequence: only 2 (repaired) SM’s will be installed

24/10/ rd RRB J. Schukraft 10 TOF Production  module production : 100 %  Electronic r/o cards: % Assembly & Installation  Supermodule assembly: 17/18  15 SMs installed Schedule  production complete: April  installation complete: April/May Installation of SM15 in the upper Sector (March 31,2008)

24/10/ rd RRB J. Schukraft 11 Photon Spectrometer (PHOS) Detector status:  Module 1: ready since mid 2006, tested & calibrated with cosmics and test beam  assembly & operation experience => improved mechanical/electrical design  Modules 2,3: all elements (crystal, mechanics, electronics) produced, most at CERN  Cooling plant : produced and commissioned, installed in April  Condensation observed during warm-up after 2 month cold operation of Mod #1 end 2007  flushing with dry nitrogen insufficient => design new airtight enclose & feedthroughs  first casing ready only end of April => too late for 2008 installation Revised installation schedule  1 module installed in April  system commissioning & pp physics  operated at C,  to be upgraded during first long shutdown  2 modules completed and calibrated during 2008 for installation in first long shutdown PHOS module # 2

24/10/ rd RRB J. Schukraft 12 PMD Detector production  all modules produced, tested, at CERN  FEE all produced, mostly at CERN  FRT board tests ongoing  support and Pb converter ready Installation postponed  long term tests show that some MANAS FEE gets damaged by repeated sparks  implement additional protection diodes  delivery delays => not ready by April  Install few module for 2008 (commissioning)  rest in WS 08/09 for HI run end 2009  PMD needed mainly for heavy ion physics PMD chambers support, Pb converter

24/10/ rd RRB J. Schukraft 13 Planning 2008 Expected start-up configuration May 2008  complete: ITS, TPC, TOF, HMPID, muon arm, FMD, trigger dets (V0, T0,ZDC, Acorde),..  partially complete: PHOS(1/5), TRD (3/18), PMD (few/48), DAQ/HLT (20-30%), Beyond 2008  complete DAQ/HLT capacity (shifted from 2008 to 2009) in line with expected LHC running  complete modular detectors: PMD (2008), TRD (2009), PHOS (2010), EMCAL (2011) PHASEDetectorStartFinish PHASE 4V0-A/T0-A/TOF/L3 magnet test Cosmic Run II ongoingTOF/TRD/PHOS/PMD Cosmic Run III, start of beam Mobile shielding, close vacuumT0 – 6 weeksT0 – 3 weeks Start of beamT0

24/10/ rd RRB J. Schukraft 14 Commissioning Comissioning runs (24/7)  Cosmics I (2 weeks, Dec 2007)  local (individual detectors) and start of global (several detectors) commissioning  Cosmics II (3 weeks, Febr/Mar 2008)  local/global commissioning, first few days of alignment ‘test’ run  TPC was turned off after ~ 1 week (Drift HV instability, now understood & corrected)  Cosmics III (> 6 weeks, early May 2008)  global commissioning, calibration, alignment production run for all detectors Magnet status  both Muon Dipole (run I) and L3 (run II) retested and commissioned to full field  the old ‘L3 short’ still shows up intermittently; not a concern for operation (< 100 mA) Magnet Current 30kA Magnet Voltage 120V Earth Current

24/10/ rd RRB J. Schukraft 15 Cosmic runs Dec. ’07 & March ‘08 Trigger in UX-C area Trigger DAQ and HLT Raw Data ACORDE (Cosmic Trigger) ALICE detectors Trigger input Control Operation from ALICE Control Room Data archive Registration on the GRID

24/10/ rd RRB J. Schukraft 16 Cosmic Runs 14 detectors could run standalone and in some global runs:  SPD, SSD, SDD, TPC, TRD, TOF, Muon TRK, Muon TRG, HMPID, FMD, V0, T0, ACORDE, ZDC(missing: PHOS/CPV, PMD, EMCAL)  R/O for a subset of the installed detector (limited by services, connections, power supply..) Global runs with multiple detectors (up to 11) :  All with pulser or ACORDE as Trigger detector and the Central Trigger Processor  Event building on several GDCs  Data recording:  ROOT format 82TB from 14/02 to 09/03 (26 days)  Migration to CASTOR 82TB from 14/02 to 09/03 (26 days)  Registration in AliEn 90 k files  Electronic Logbook

24/10/ rd RRB J. Schukraft 17 Global Runs December ‘07

24/10/ rd RRB J. Schukraft 18 Global Runs March ‘08 Number of detectors in the global partition

24/10/ rd RRB J. Schukraft 19 Detector/DAQ integration - DATE V5, DDL SIU + RORC delivered - Detector algorithms framework ready October 07 SPDSPD SSDSSD SDDSDD TPCTPC TRDTRD TOFTOF MUONTKMUONTK MUONTGMUONTG HMPIDHMPID PHOSCPPHOSCP FMDFMD T0T0 V0V0 ZDCZDC PMDPMD ACORDEACORDE EMCALEMCAL Final electronics with DDL & DATE Trigger with LTU and TTC Common Data Header (TRG info) Data format check SOD, EOD Data quality monitor. (MOOD) Detect. Algorithms in DAQ

24/10/ rd RRB J. Schukraft 20 Detector/DAQ integration - DATE V5, DDL SIU + RORC delivered - Detector algorithms framework ready March 08 SPDSPD SSDSSD SDDSDD TPCTPC TRDTRD TOFTOF MUONTKMUONTK MUONTGMUONTG HMPIDHMPID PHOSCPPHOSCP FMDFMD T0T0 V0V0 ZDCZDC PMDPMD ACORDEACORDE EMCALEMCAL Final electronics with DDL & DATE Trigger with LTU and TTC Common Data Header (TRG info) Data format check SOD, EOD Data quality monitoring Detect. Algorithms in DAQ

24/10/ rd RRB J. Schukraft 21 ECS October 07 SPDSPD SSDSSD SDDSDD TPCTPC TRDTRD TOFTOF MUONTKMUONTK MUONTGMUONTG HMPIDHMPID PHOSCPPHOSCP FMDFMD T0T0 V0V0 ZDCZDC PMDPMD ACORDEACORDE DCS FSM implemented Calibrations runs defined Calibrations runs implemented in ECS Detect. Algorithms for calibration runs Detector/ECS Integration

24/10/ rd RRB J. Schukraft 22 ECS April 2008 SPDSPD SSDSSD SDDSDD TPCTPC TRDTRD TOFTOF MUONTKMUONTK MUONTGMUONTG HMPIDHMPID PHOSCPPHOSCP FMDFMD T0T0 V0V0 ZDCZDC PMDPMD ACORDEACORDE DCS FSM implemented Calibrations runs defined Calibrations runs implemented in ECS Detect. Algorithms for calibration runs Detector/ECS Integration

23 Detector Control September 07 SSDSPD TPC TRDTOFHMPPHOCPVMCHMTRFMDT0V0PMDZDCACOEMCDCS standard semi specific HV MON LV MON BOM RCK MON FEE DVM GPU VHVLV LED LIQ GMS LAS THR MOV HAL RAD SFM MON CCO LED FEE NMR HVD APD COO VME COO VEN GAS VME Central effort MON VME GAS MON VME GAS THR GTU PCU PTU PIT GAS VME COO VAC DSS TCO APD LVDFEL LAS CAM MIR SYN GPS SDDTRG VEN 1 H/W & low level S/W done 2 Basic control with PVSS 3 FSM implemented 4 Configured and ready for operation DVM IAS CPU TOR TRU NIM MTS COO

24 Detector Control March 08 standard semi specific 1 H/W & low level S/W done 2 Basic control with PVSS 3 FSM implemented 4 Configured and ready for operation SSDSPD TPC TRDTOFHMPPHOCPVMCHMTRFMDT0V0PMDZDCACOEMCDCS HV MON LV MON BOM RCK MON FEE DVM GPU VHVLV LED LIQ GMS LAS THR MOV HAL RAD SFM MON CCO LED FEE NMR HVD APD COO VME COO VEN GAS VME Central effort MON VME GAS MON VME GAS THR GTU PCU PTU GAS VME COO MCS DSS TCO APD LVDFEL LAS CAM MIR SYN GPS SDDTRG VEN DVM IAS CPU TOR TRU NIM MTS COO PIT FEE VME COO

24/10/ rd RRB J. Schukraft 25 Detector/Trigger integration

24/10/ rd RRB J. Schukraft 26 Detector/Trigger integration Not installed or missing hw

27 Detector – TRG - DAQ issues SPDSPD SSDSSD SDDSDD TP C TRDTRD TOFTOF MU O N T K MUONTGMUONTG HMPIDHMPID FMDFMD T0V0ZDCZDC ACORDEACORDE CDH errors Empty event or missing event fragment Trigger sequence err. Trigger pattern err. Mini-event ID error Detector busy Errors at high rate next level of ‘debugging’: working ≠ error free ! now chasing rare or conditional errors

24/10/ rd RRB J. Schukraft 28 Event Displays TRD SDD + SPD TOF TPC

24/10/ rd RRB J. Schukraft 29 Muon Arm

24/10/ rd RRB J. Schukraft 30 Noise studies (TPC, TRD, muons. Under investigation with producer of power supply) Calibration  Krypton decay TPC commissioning OROC gain variation σ ~ 4% Rb → Kr* → Kr 41.6 keV 29 keV PL508 – clean room (2006) PL512 (final) – cavern PL508 – cavern (2008)

24/10/ rd RRB J. Schukraft 31 SDD Calibration Drift speed calibration  dependence on temperature (  T < 0.1 o C !)  v drift =  e E with  e  T -2.4  heat sources on detector edges  dependence on position  heat goes up ! drift Drift speed constant for hours temperature Drift Speed (  m/ns) Module number Speed depends on detector position

24/10/ rd RRB J. Schukraft 32 Alignment Tests SPD: testing alignment programs with cosmics  very small statistics (SPD is very small !), needs pixel trigger or beam particles 15 cm

24/10/ rd RRB J. Schukraft 33 Computing Resources  ALICE deficit in 2008/9 (after recent updates of pledges/requirements) ~ 30-40%  Active discussion for the integration of US computing resources into ALICE  Discussions with individual countries to raise their relative contribution Commissioning of the Offline successfully started First tracks from real data at P2 reconstructed 24/10/ rd RRB J. Schukraft 33 Computing 2 week Dec ’07 run 17.5TB in 23K files (~0.7 GB/file) 18MB/sec = 1/3 of the p+p rate CCRC’08 ongoing now 130MB/s Data Traffic T0 -> T1’s 18TB Data stored in T0

24/10/ rd RRB J. Schukraft 34 Operating ALICE Experience from first global commissioning runs  ALICE operation: 18 different detector systems,  5 online control systems: (ECS/DCS/DAQ/HLT/Trigger)  online/offline data quality assurance, offline tasks (data migration, archiving, reconstruction)  estimated number of people required on shift (24/7):  initially ~ 30 (commissioning, first data taking periods, ‘running in’ the detector)  in addition: ‘on call’ experts (detectors, services)  hope for significant reduction on the medium term Operation requirements  Institutes are required to participate in ‘shifts’ in proportion to PhD’s (authors)  shifts require presence at CERN (some offline and data-QA may eventually be done remote ?)  estimated initial requirements : 30 people/shift, ~800 authors (PhD’s + students)  ~ 24 days of shifts for each author per year for a 7 month run (May-Nov)  this is only ‘taking shifts’, other tasks, detector work, ‘on call experts’ are in addition ! Institutes and Funding Agencies will have to consider the necessary arrangements and resources. The load will be particularly high in the initial phase !!

24/10/ rd RRB J. Schukraft 35 Summary Major Milestones  Installation for 2008 essentially finished !  Global commissioning started Biggest Concerns  UK commitment to ALICE trigger  Computing resources: large deficit projected for 2009 and beyond