Safety Driven Performance Conference 2013 Integrating ModuSpec and WEST Engineering Services to advance excellence in drilling safety, integrity and performance Dr. Gerard Gaal Senior Reliability Consultant Modeling risks in the future Failure prevention
Safety Driven Performance Conference 2013 Agenda Introduction The risk definition Risk Identification Required data / information Risk Prevention
Safety Driven Performance Conference 2013 The Risk Definition Probability of Failure (Events per Year) Asset type Manufacturer asset Condition of the asset Uncertainty in the asset condition Consequence of Failure (Impact ($) per Event) Loss of function Environmental impact Reputation impact Costs emergency maintenance X
Safety Driven Performance Conference 2013 Risk Identification Data Analysis Task Plan Client data Risk Matrix
Safety Driven Performance Conference 2013 Risk Identification Databases - failure rate Constant failure rate Overestimate PoF
Safety Driven Performance Conference 2013 Required information / data Equipment data P&IDs of the system; Equipment ID data (age, usage etc.) and tagging (or taken from P&ID); Failure data Historical maintenance data from the system (replaced components); Maintenance data Maintenance plans for the system (cleaned, preventatively replace components); Equipment condition data.
Safety Driven Performance Conference 2013 Risk prevention
Safety Driven Performance Conference 2013 Risk prevention – spare parts
Safety Driven Performance Conference 2013 Risk prevention - system
Safety Driven Performance Conference 2013 Risk prevention - system
For more information, please contact: Dr. Gerard Gaal Senior Reliability Consultant Asset Integrity & Maintenance Management Lloyd’s Register Energy – Drilling Gapingseweg 1A 4353 JA Serooskerke, the Netherlands T E w Lloyd’s Register is a trading name of Lloyd’s Register Group Limited and its subsidiaries. Integrating ModuSpec and WEST Engineering Services to advance excellence in drilling safety, integrity and performance