DIS with the LHC 1.LHeC – CDR (Refereed, NuPECC, ECFA) 2.Scaling the Effort and Physics 3.A Next Step For the DG of CERN, Rolf Heuer. M.Klein, CERN, 19.2.2013.

Slides:



Advertisements
Similar presentations
The LHeC Project: Deep Inelastic Scattering with E e =70GeV and E p =7TeV P.Newman, Birmingham … with … J. Dainton, M. Klein, E. Perez, F. Willeke hep-ex/ ,
Advertisements

From Divonne to Chavannes and Beyond Introduction to the 3 rd CERN/ECFA/NuPECC Workshop on the Design of the LHeC Max Klein LHeC Workshop Chavannes-de-Bogis,
High Energy DIS after HERA?… The LHeC Project Paul Newman Birmingham University, (for the LHeC study group) Oxford Seminar 14 June 2011
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Design Considerations LHC hadron beams: E p =7 TeV E A =E e  Z/A Luminosity O (10 33 ) cm -2 s -1 with Beam Power 100 MW (wall plug) Integrated e ± p.
LHeC - Detector Layout Tracker HCAL Solenoid Dipole Muon Detector Fwd Calorimeter Inserts Bwd Calorimeter Inserts p/A e∓e∓ EMC Dipole The Large Hadron.
Some slides for Michel please take what you like Max Klein
Quark *) Distributions with the LHeC 1 Max Klein DESY, Meeting on QCD at the LHeC Project Scenarios Statistics Systematics Light Quarks Heavy.
Diffractive DIS with E e =70GeV and E p =7TeV at the LHeC For general physics aim and sketch of machine design, see plenary talk of E. Perez … … what could.
1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University,
Recent Electroweak Results from the Tevatron Weak Interactions and Neutrinos Workshop Delphi, Greece, 6-11 June, 2005 Dhiman Chakraborty Northern Illinois.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY DIS06 Tsukuba April 23 rd 2006 John Dainton Large Hadron electron Collider LHeC … 1.Introduction.
LHeC Workshop Chavanne-de-Bogis, 20/21 January 2014 Herwig Schopper.
Peter Paul 12/16/06e-A Collider concept1 Brief History of the e-A Collider Concept Peter Paul BNL/SBU.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
CLIC detector & physics study “news from the ET ” Lucie Linssen L. Linssen, IB meeting, 18 April
B.Mellado University of the Witwatersrand On behalf of the LHeC Study Group HEP Seminar, Tsinghua University, 22/08/14 Exploration of the Higgs boson and.
Future Accelerators at the High Energy Frontier
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
1 Tunnel implementations (laser straight) Central Injector complex.
Page 1 An lepton energy-recovery-linac scalable to TeV Vladimir N. Litvinenko Stony Brook University, Stony Brook, NY, USA Brookhaven National Laboratory,
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
LHeC - Detector Layout Tracker HCAL Solenoid Dipole Muon Detector Fwd Calorimeter Inserts Bwd Calorimeter Inserts p/A e∓e∓ EMC Dipole Abstract The Large.
Summary of the Accelerator Working Group 1st ECFA LHeC Workshop; 1-3 September 2008, Divonne 1 First discussions started at CERN at the end of last year.
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
CERN Evaluation Meeting, Bergen, April 2009Joakim Nystrand, University of Bergen Future electron-proton and electron-nucleus colliders, eRHIC and.
LC Scope: European View 1- Scope document should define a parameter set for a Linear Collider to be used as the European input to the world wide scope.
Future Circular Colliders (FCC) study: Introduction
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
RECFA September Kenneth Österberg, University of Helsinki Experimental e + e - physics – LEP&LC DELPHI Major finnish LEP contribution analysis.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
Use of CLIC zero for Accelerator R&D 10 May 2012 R. Assmann1 CLIC Collaboration Meeting, CERN
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Past Present Future The High Energy Frontier R.-D. Heuer, CERN Joint EPS-ECFA meeting, July 18, 2009.
Future Colliders Gordon Watts University of Washington/Seattle APS NW Meeting May 12-14, 2016.
The Linear Collider Roadmap IWLC2010 CERN October 18, 2010 Rolf-Dieter Heuer CERN.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
1 Gamma Gamma Collider Physics Report Tim Barklow SLAC Apr 18, 2009.
U.Klein and B.Mellado for the LHeC Study Group Snowmass meeting, CERN, 20/06/13 Higgs in ep at the LHeC.
1 Proton Structure Functions and HERA QCD Fit HERA+Experiments F 2 Charged Current+xF 3 HERA QCD Fit for the H1 and ZEUS Collaborations Andrew Mehta (Liverpool.
CERN’s Large Hadron Collider
CERN Large Hadron Collider
FCC-ee Interaction Region design
UK Neutrino Factory Conceptual Design
LHeC Coordination Meeting, 9 June 2017
LCC L. Evans, Santander, 2nd June 2016
Input to Strategy currently planned
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
nuSTORM and the Physics Beyond Colliders workshop
Summary Session 3 Standard Model and Beyond
An lepton energy-recovery-linac scalable to TeV Vladimir N
Snowmass on the Mississippi
Hong-Jian He Tsinghua University
Yasuhiro Okada, Executive Director, KEK
MEIC Cost Estimate Overview
with colliding electron-positron beams (Super Charm-Tau Factory, SCT)
25/4/2019 Sandro Palestini & Albert De Roeck
Presentation transcript:

DIS with the LHC 1.LHeC – CDR (Refereed, NuPECC, ECFA) 2.Scaling the Effort and Physics 3.A Next Step For the DG of CERN, Rolf Heuer. M.Klein, CERN,

CERN Referees Published 600 pages conceptual design report (CDR) written by 200 authors from 60 Institutes and refereed by 24 world experts on physics, accelerator and detector, which CERN had invited.

Close Link of ep (and eA) to the LHC High mass searches (SUSY, ED..) “Removal” of QCD uncertainties for H at the LHC (PDFs, δα s ~ 0.2%, GUT?)

Scaling of the LHeC with the Electron Beam Energy Cost and Tunnel LengthHiggs Cross Section and Luminosity Cost w/o contingency. 80GeV ~ 1.5BSF The core detector cost is 106 MSF (CDR). Luminosity at constant power ~ 1/E e while σ(E e ) ~ E e This corresponds to 5-10k WW  H in e- CC per year, independently of E e (modulo acceptance change) E e [GeV ]

E e = 60 GeV E e = 30 GeV = 3 * 2 * 5 GeV [The tunnel length is not only a function of the energy but also dependent on future upgrade capabilities.]

The LHC provides the only, single opportunity to develop DIS as part of HEP for decades

New LHeC project organisation, as considered at Chavannes (June 2012)

Remark It is feasible to realise an unchallengeable ep and eA DIS physics programme with the LHC. An accelerator and detector project organisation would have to be built for preparing such an experiment for the HL phase of operation, following the example of the first MoU’s in preparation for the LHeC energy recovery testfacility. A sketch of such an organisation has been considered. Collaborators have expressed interest worldwide but can only be attracted with a declaration of CERN’s support. Reducing the electron beam energy, but using energy recovery techniques, it seems possible to essentially maintain the full physics programme of the 60 GeV LHeC. If the electron beam energy is halved the cost seems to be 1/3 of the full cost, about. The final choice of energy depends on the 13 TeV run, and the developments around the major facilities, the LHC upgrade and the ILC and future considerations. One can imagine also a genuine synergy with the LHeC as a yy collider (to be studied).

backup

Summary of LHeC Physics [arXiv:1211: ]

Ring vs Linac - Tentative “Core” Cost ItemRingLinacSource of information Civil Engineering Amber+40% (LHC model) Rf5030Guess Magnets+supp ort 22k*3946=87 7k*3000=21 22k*5118=114 10*3600=36 Davide Tommassini Injector505Estimate Cryogenics15150Friedrich Haug Linac--120*1.8=216Brinkmann Total361   1100¼ extra added Scaling of Linac (and Return Arc) cost leads to 590 instead of 887 for 50 GeV Only for the CERN Directorate and only indicative

For the DIS dreams for the very far future an ep/A “bridge” is absolutely crucial.