Kick of WP3 Steps towards building Oxford, first project meeting 23-05-2006 10:30 am – 11:15 am.

Slides:



Advertisements
Similar presentations
Building the Environment for the Things as a Service GWS Aalborg Fco. Javier Nieto (ATOS)
Advertisements

Presentation by Prabhjot Singh
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
National Association for Regulatory Administration September 13, 2011 IT’s NOT Like Building a House Mark Parker (800)
WP2: Design principles; 2 nd AtGentive GM May 2006, Oxford, UK AtGentive WP2 Design Principles AtGentive; 2 nd General Meeting; May 2006, Oxford,
Part 1: Introducing User Interface Design Chapter 1: Introduction –Why the User Interface Matters –Computers are Ubiquitous –The Importance of Good User.
Rational Unified Process
1 SOFTWARE LIFE-CYCLES Beyond the Waterfall. 2 Requirements System Design Detailed Design Implementation Installation & Testing Maintenance The WATERFALL.
Lecture 13 Revision IMS Systems Analysis and Design.
A DAPT IST Composite Services Gustavo Alonso Swiss Federal Institute of Technology (ETHZ) Zürich, Switzerland.
Usability 2004 J T Burns1 Usability & Usability Engineering.
Understand European Energy Supply Security Management Co-ordinators UNDER way towards STANDard indicators for continuous VET A short summary.
The Open University's Institute of Educational Technology Improving the accessibility of virtual learning environments using the EU4ALL framework Chris.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Software projects Management & Development Alireza Saebi
Project Execution.
CIS 321—IS Analysis & Design
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
EIDA Project ( Proposal ) Research and Technical Background Emergency Intelligent Decision Assistant: Emergency Intelligent Decision Assistant: Toolkit.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
AtGentive; IST Call 4 Project meeting; 6-7 February 2006, Luxembourg AtGentive Attentive Agents for Collaborative Learners AtGentive; IST Call 4 PM2006.
Systems Life Cycle A2 Module Heathcote Ch.38.
SmartNets Results Overview SmartNets SmartNets Methods.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
Integrating competence development at the individual-, group- and organizational level Luxembourg, February 6, 2006.
1 Capturing Requirements As Use Cases To be discussed –Artifacts created in the requirements workflow –Workers participating in the requirements workflow.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
Chapter 3 Strategic Information Systems Planning.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
Workpackage 3 Overall presentation 9.45 – Outline 2 Workpackage 39:45 until 11:30 -WP3 overview09.45 – Deliverable – AtGentSchool.
1 reTHINK Deliverables, How To Read reThink deliverables quick starter.
Work Package 6 L2C Kick-off meeting Fontainebleau, March 7th 2006.
CSPC 464 Fall 2014 Son Nguyen. 1. The Process of Software Architecting, Peter Eeles, Peter Cripss 2. Software Architecture for Developers, Simon Brown.
Software Engineering Principles Practical Advice and Steps for Managing Your Project.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
AtGentive Project Overview; kick-off meeting; 7-8 December 2005, Fontainebleau AtGentive Project Overview AtGentive; Kick-off Meeting; 7-8 December 2005,
CERES-2012 Deliverables Architecture and system overview 21 November 2011 Updated: 12 February
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
Wizard of OZ Oxford, Maurice Vereecken. Goal of implementing Woz Wp2 –Quick insight in mapping events to Ontdeknet –Working towards what to do in WP3.
1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008.
AtGentive Final Review, Fontainebleau 5th February 2008 WP 3.2: AtGentNet Thierry Nabeth, Nicolas Maissonneuve.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Overview Instituto Pedro Nunes Co-Living 12/3/ Paulo Freitas - Instituto.
Copyright 2015, Robert W. Hasker. Classic Model Gathering Requirements Specification Scenarios Sequences Design Architecture Class, state models Implementation.
SECURE TROPOS Michalis Pavlidis 8 May Seminar Agenda  Secure Tropos  History and Foundation  Tropos  Basics  Secure Tropos  Concepts / Modelling.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
Stork is an EU co-funded project INFSO-ICT-PSP STORK PRESENTATION Frank LEYMAN Manager International Relations 04/06/2009.
Module 2 National IEA Process Design and Organization Stakeholder’s consultative workshop/ Training on Integrated assessments methodology ECONOMIC VALUATION.
4.2 SOFTWARE DEVELOPMENT METHODOLOGGY PRESENTED BY : AZURA IBRAHIM SYARIFAH SYAZA BTE SEYD ZULKAFLY CS230(5A)
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
Stages of Research and Development
Process 4 Hours.
Task 4.2 Grid Coordination & DR Activation Module
NATIONAL QUALIFICATIONS FRAMEWORK IN SERBIA
WP1 – Smart City Energy Assessment and User Requirements
ICT PSP 2011, 5th call, Pilot Type B, Objective: 2.4 eLearning
IEEE Std 1074: Standard for Software Lifecycle
Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
WP5 INERTIA Integration & Lab Testing
WP1 INERTIA Framework Requirements, Specifications and Architecture
Description of Revision
Object Oriented Analysis and Design
SOFTWARE LIFE-CYCLES Beyond the Waterfall.
Dissemination and Evaluation
The basics ESSnet on SDMX prepared in 2008/2009
Web Service Security support in the SSE Toolbox
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Kick of WP3 Steps towards building Oxford, first project meeting :30 am – 11:15 am

Current status WP3 "WP3 is on hold until: the transistion from conceptual framework to implemenation is more clear, and there is a consensus on the architecture. We hope to overcome these issues at the Oxford project meeting."

Outline next 40 min..  Definition of work  Contributions of the partners (5 min. Presentations)  Setting up a planning

Definition of work

Project plan DoW

Components of the DoW The principal components are: The attention detection component: Its role is to observe the action of the user, establish current user focus, and update the user model (and in particular attentional state) The agent reasoning component. Its role is to analyze the attentional state of the user, and to construct some possible interventions through the evaluation of possible alternative foci. The agent intervention component. Its role is to select and execute a particular intervention.

Outline architecture

App Atgentive module User module Living Actor User

Steps of WP3

Defening the steps  T3.1: Implementation preparation, methodology & plan. Technical approaches are analysed and technical decisions are taken, the development methodology (XP based) is clarified and an implementation plan (for both the components and the e-learning platforms) is elaborated.  T3.2 Implementation of the attention recognition component, the agent reasoning component and the agent intervention component. The different components are developed according to the specifications in WP2. Central to this iterative development process will be the modularity and flexibility of the components.  T3.3: Global integration and technical testing for two pilots. The different components of AtGentive will be integrated in the collaborative e-learning platforms, resulting in first prototypes of AtGentSchool and AtGentNet. Elaboration of the general user’s documentation (integrated as much as possible into the platform).  T3.4: Implementation, setting-up and execution of the validation of the user interaction using eye-tracking. The prototypes will be validated in user tests in which eye-tracking technology will play and important role to asses the functioning of the different components with the AtGentSchool and AtGentNet environment.

Steps of WP3

Contribution of the partners 5 min presentations

Months WP3 PartnerMonths Ontdeknet14 INSEAD16 UTA12 AUP10 Cantoche14

Contribution Ontdeknet WP3  Project management + securing the overview  Building specific compontents Ontdeknet  Developing the interface between Atgentive module and Ontdeknet  Implementation of Atgentive

UTA

Cantoche

Insead

AUP

Setting up a planning

Planning milestones WPMilestoneMonthDescription WP1M1.1M04State of the art completed WP1M1.2M06Conceptual Framework first draft done WP2M2.1M07Design of the components completed WP2M2.2M12Design of the learning platforms completed WP3M3.1M12First delivery of components WP3M3.2M16Working prototypes AtGentSchool and AtGentNet WP4M4.1M06Evaluation approach has been defined WP4M4.2M09Formative evaluation has been completed

Planning