Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Basic fill color R 100 G 160 B 200 Accent 1 ”Logo Blue” R 0 G 39 B 118 Yellow (highlight) R 252 G 217 B 0 Accent 2 R 118 G 118 B 118 OP300 Technical training.
The Flame SDSU. Flame Controller Layout Thermocouple Stepper Motor Moving Apparatus.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
January 2015 SlimLine XR ITS 2.
The goals of Micromouse: to build an autonomous “mouse” Mouse should be able to navigate and solve any given maze Mouse should be no bigger than 25.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Assembly of Conductivity Flow Loop EAS 199B living with the lab (in preparation for calibrating conductivity sensor)
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Diagnostic & Troubleshooting Date 06/09/00, Page 1 Diagnostic & Troubleshooting s.
Lighting and Wiring Services
With Bluetooth Connectivity
STEP 1: Determining the exact image width STEP 1: Determining the exact image width Position of X-ray Filter Position of X-ray Filter STEP 5: Crop Extra.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
U81X0 Downloading Tool Manual 1 ( Version 1.2 ) FlashRW For U81X0 Version 4.0.0(Build #95V) February 2004 LG Electronics Inc.
Sage Metering Service Department
Oil Burner optical flame analysis The International Aircraft Materials Fire Test Working Group March Atlantic City NJ Atlantic City NJ.
First, let’s review the structure and use of a breadboard.
HYSWEEP® PATCH TESTING.
Engineer Training RTRun – Real Time Software TJ8300 / TJ8500 RTRun – Real Time Software.
ChibiOS/RT Tools Setup A free embedded RTOS
Construction of “Curio” style Cabinet by Miguel Del Real.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Stuff By Zach and Turtle To designate a default printer, choose Start > Control Panel > Printers and Faxes. Right-click the printer, and then.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
NIKHEF B-field monitors Paul Balm November 11 th, 1999.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
MAKE: AN ELECTRONICS WORKSHOP
WP3 24 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Since 10 July th Re-installed blind on cabinet (JagM) 18 th Serviced Nitrogen.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
SIDE SCAN HARDWARE CONFIGURATION
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Getting Started with your Diagnostic Station Your ADC ADVIEW Diagnostic Station Unpacking the contents, you will find… Quick start guide (a printed version.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
SIDE SCAN HARDWARE CONFIGURATION HYPACK Connection Block Diagram GPS, single beam and tide data go into HYPACK ® SURVEY. Sidescan (with optional.
Requirements Components Ready Light Status Board Orientation.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
SC2004 Exhibit Status. Proposed Schedule Exhibit ships from SLAC 7/22 Arrive Fermilab 7/29 Fermilab Quantum Universe display opens 10/1 Ship date to SC2004.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
BWS Design meeting Jose Luis Sirvent PhD. Student XX/03/2014
Date of download: 10/29/2017 Copyright © ASME. All rights reserved.
ATLAS Upgrade Module Bonding Trials Using Glass Asics
2 PC troubleshooting Hardware Troubleshooting & Repairing
RV Solar Panel Installation
Vibration Monitoring System M14
Presentation transcript:

Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review at IHEP August 2, 2001

Wire Tension and Pitch Machine CSC Production at IHEP Beijing

Tension/Pitch Machine Setup CSC Production at IHEP Beijing Preparation: Buy Video Monitor, Survey Tools: Flatness Ruler Gradienter,.. Transportation: Machine arrived, Using Rail Moving Method. Install: Stand up the frame, Repair injured cable of the stand up motor. Mounting sensor head Power on, Basic function check ok.

Alignment: Mounting the anode panel hold bar with newly machined screws, Adjust position according to the size of ME1/2 prototype panel Start tuning the machine with the ME1/2 panel. Error happened: Some 0 tension: found 1 cable connection problem; 3~4 thin wires, their tension are 0, they are closed to the thick wires: adjust the camera position, re-align the camera with sensors, modify the parameters in the DEFAULTS file Measurement is ok. Take ~1.5 hours for one single side. Problem: Transformer Wetted Accidentally , there are 220V on the machine frame: solved with drying. Tension/Pitch Machine Setup CSC Production at IHEP Beijing

Tension Measurement Results (within the range) 12A008-N (Thick wire excluded) CSC Production at IHEP Beijing

Tension Measurement Results 12A008-N (Thick wire) CSC Production at IHEP Beijing

Tension Measurement Results 12A008-N (Wire tension all) CSC Production at IHEP Beijing

Tension Measurement Results 12A008-N CSC Production at IHEP Beijing

Pitch Measurement Results 12A008-N (Thick wire excluded) CSC Production at IHEP Beijing

Pitch Measurement Results 12A008-N (Thick wire included) CSC Production at IHEP Beijing

Pitch Measurement Results 12A008-N (All wires pitch) CSC Production at IHEP Beijing

Strip Capacitance Measurement Set up CSC Production at IHEP Beijing

Capacitance Meter Setup CSC Production at IHEP Beijing Preparation: Buy a new PC, Cable making, PC board mounting, Software setup... Problem: Power problem: Fuse burns on SCM-16 when connected SCM-16 with the new PC, when with the 110V PC, no fuse burn. Finally built new lab. Ground, and connect the GND of 220V to the GND of 110V power, problem solved. Software problem 1: Run error, Invalid Board Number: Install CDAS8JR driver, this problem was solved, But Software problem 2: ADC result is always 0. Finally, we dig out that the problem comes from the Labview software package and solved the problem.

Strip Capacitance Results CSC Production at IHEP Beijing

Conclusion CSC Production at IHEP Beijing We have : Finished the Measurements for the two ME1/2 and ME1/3 prototypes. Wrote the Device Operation Manual in Chinese. Set up the network for the CMS Group. We plan: Modify the anode panel clamps in both ME1/2 and ME1/3 cases. Calibrate the tension measurement: Plan to use the device from MDC group; Make a new wiring device for thick wire(tensions were always too low,<450g).