Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.

Slides:



Advertisements
Similar presentations
F. Formenti - ALICE forum 16/03/ Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others.
Advertisements

1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
STAR Forward GEM Tracker Safety Review Electrical
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
LV power cables for iTOP
Dry type transformers Zaragoza Accessories and options
ITOP LV power supply and cable scheme G. Visser Indiana University 3/17/2015.
CSE 550 Computer Network Design Dr. Mohammed H. Sqalli COE, KFUPM Spring 2007 (Term 062)
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
1 of 15 Coleman Cable, Inc. Copyright © 2006 All Rights Reserved. FIRE ALARM CABLE Objectives By end of this module you should able to: Know What Really.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
ZTF Interconnecting Scheme Stephen Kaye
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
1 CCTV SYSTEMS CCTV cables. 2 CCTV SYSTEMS Cable selection is a very important consideration in the performance of a CCTV system, especially where long.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June th 2010, Argonne. 1.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
SSD Ritter Review June 20, 2012 Conventional Systems: Cooling, Power Supplies, Cables, and all some of that stuff Jim Thomas Lawrence Berkeley National.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Grounding Guidelines Developed for LBNE
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
FGT Readout/DAQ Update, FGT electronics integration – reminder/update ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 kV.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
1 AGATA – Ch. VEYSSIERE 09/07/2008 A. BOUTY; S. BROUSSARD; A. LOTODE; Y. MARIETTE; Ch. VEYSSIERE: CEA/DSM/IRFU/SIS D. BAZZACCO: Univ. Padova E. FARNEA;
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
1 The Long-Baseline Neutrino Experiment Project LBNE CD-1 Director’s Review AC Power & Grounding WBS Marvin Johnson 1.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Electronics Infrastructure Linda Bagby December 8-9, 2011.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
SVD Electronics Constraints
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Structure and etc Shoji Uno (KEK) at B2GM
T1 Electronic status Conclusions Electronics Cards:
ALICE Muon Tracking Upgrade EDR Answers
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
Overview of T1 detector T1 is composed by 2 arms
TPC Detector Control System
Grounding, Power Distribution
TOF & BB FEE Safety Review
SALTRO16 activities in Lund
Electronics, motion control and verification
Presentation transcript:

Doug, here are some slides

FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout Controller) [ANL] ARM (APV Readout Module) [IUCF] 208 V 1 φ Wiener crate (FGT custom) 6U x 220mm cards 82 FGT Cables 24 FEE signal & power combo 24 HV coax (4 of each per disk) Cable break connectors/boxes located just outside of west support cylinder, on TPC wheel. This point also provides FGT detector ground tie (to TPC wheel). FEE cable (each) Signal: 15 twisted pairs (30AWG) Power: A (fused for 3 A) A (fused for 5 A) remote sense FEE cables at FGT will be custom low-mass aluminum design with silicone & FEP extruded insulation, solder terminated (copper clad or plated aluminum) All standard cables will have the required CL2 or CMG rating. Custom cable shall be constructed to meet the UL-1581 Vertical Tray requirements, but not tested by UL MEASURED (GV) cable run 37 feet [ West cyl → TPC sec 2/3 boundary → sec 2/3 tray out of magnet → 2 nd level platform ceiling tray → 3A9 ] We must minimize the cable length! SGIS (to kill all FGT power) GV, IUCF 12/5/08

Power Dissipation POWER SUMMARY (ENTIRE FGT) 240 APV CHIPS74 W 24 VOLTAGE REGULATOR UNITS33 W 24 GEM BIAS VOLTAGE DIVIDERS24 W TOTAL POWER IN WEST CYLINDER131 W FEE CABLES25 W READOUT MODULES577 W HV MODULES250 W CRATE PS LOSSES240 W MISC. EQUIPMENT, E.G., NETWORK100 W TOTAL POWER IN FGT RACK1167 W GV, IUCF 12/5/08

Rack Requirements The FGT group has two basic requirements for electronics rack space: Minimum achievable cable length. This is crucial, because the analog signals are driven directly from our readout ASIC’s (APV chips) on these cables, to be digitized in the ARM modules. Longer cables means slower settling, more crosstalk, lower signal to noise ratio, and greater danger of EMI troubles. Mounting space for 1 crate (8U height) reserve space for 1 additional crate (extra readout for extra disks or auxiliary GEM detectors in STAR) 2 cable feedthroughs (3U each) 1 NIM bin 1 shelf for laptop similar to EEMC setup fiber “MIC” box ethernet switch → We need about ½ a rack for the FGT, either at 2A9 or (new) 3A9. In consultation with operations group, the understanding is that the best option looks like a new rack installed at 3A9. The height of 3 rd floor racks will be chosen to just clear the doorway. For FGT this rack could be air cooled, i.e., adequate ventilation in/out of the rack, but if water cooling is required/desired by other considerations that is fine too. (Remark: I believe that IST should similarly go in 3A1/3A2.) A final decision by STAR Operations group on FGT rack allocation awaits cable length tests by GV and rack drawings / cost estimates by JS. We need this by April ‘09. GV, IUCF 12/5/08