WG Summaries Austin, TX October 24, 2007. Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

WG A Family of CIM Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Dynamic Model Exchange - Unbalanced Models.
TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden.
UNCLASSIFIED 1 Enterprise Architecture Career Path Working Group Walt Okon Senior Architect Engineer Architecture & Infrastructure Directorate Office of.
U.S. General Services Administration General Services Administration Policy, the Procurement Process, the Buy Accessible Wizard, and Purchasing Section.
CIM Users Group Benefits Fall Users Group Meeting October 12-13, 2010 San Francisco, CA.
For OpenSG Discussion: Preliminary SG-Enterprise Charter Greg Robinson, Co-Chair, SG-Enterprise Wayne Longcore, Chair, SG-Enterprise.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
© ABB Ltd ABB Experience Neela Mayur CIM Users’ Group Meeting June 12, 2008.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
1  Attendees: Loris Arnold, John A Drew, Jianying Li, Sushil Cherian, Javier R. Torres, Lee King, James Horstman, Raymond B Wilson, George L Clark,Taka.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
CIM Users Group Intro and Benefits Ralph Mackiewicz Chair, Marketing Subcommittee UCA International Users Group October 2007 Austin, TX
Sixth Annual Meeting of the WG: Governance issues Beth Rasch U.S.A.
Working Group Summaries Genval, Belgium May 14, 2009.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
International Business and Technology Consultants AMS confidential & proprietary SPS Help Desk Presentation Army User’s Conference June 2002.
Jay Britton
A Family of CIM EMS Exchange Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Dynamic Model Exchange? - Schematic.
Electric System OperationsTennessee Valley Authority 1 Coordinated Data Exchange FERC Technical Conference July 14, 2004 Information Technology for Reliability.
Sarasota Policy Wiki Why Wiki? To provide a new platform for community input on public policies and issues. To encourage engagement.
CIMSpy/CIMdesk A CIM-based Data Engineering Tool
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
TC 57 IEC TC57 WG13 EMS Application Program Interfaces Terry Saxton Convenor, WG13.
What is ETSI EMTEL all about Claire d’Esclercs Technical Officer for EMTEL European Telecommunications Standards Institute.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Technical Working Group December 2000 Mark Davis Andrew Nash.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
UCAIug Annual Meeting 2009 November 9 th – 10 th, 2009 EPRI Office Charlotte, NC.
IEC WG Summaries Austin, TX October 24, WG 13 – EMS API Convener: Terry Saxton The principal task of the IEC series of standards is to develop.
PKI Forum Mission “The PKI Forum is an international, not-for-profit, multi- vendor and end-user alliance whose purpose is to accelerate the adoption and.
20th AIAA Advanced Measurement and Ground Testing Technology Conference Lessons Learned in AIAA Working Group Development E. Allen Arrington Dynacs/NASA.
MPARWG Business & Disposition of Action Items from MPARWG October 2009 H. K. (Rama) Ramapriyan NASA/GSFC Metrics Planning and Reporting (MPAR) WG 9 th.
CIM User Group Web Site Update Austin, TX October 23, 2007.
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
1 UCA/CIM TSC Enterprise Application Integration Task Force  Scope: Drive the understanding and implementation of CIM-based message exchange to support.
The Revision of EN81-1 and EN81-2 ELA Information Day December 8 th, 2010 Brussels.
12 May 2011 CIM Users Group 2011 Goals Spring Meeting, Prague 12 May 2011.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
1 Geospatial Line of Business Update FGDC Coordination Group April 14, 2009.
1 UCA/CIM TSC Enterprise Application Integration Task Force / CIM Tools methodologies  Vasteras meeting  A. Maizener
> Title of presentation - Date - References11 Model Exchange and Naming -- Activity  Standard  New draft of standard has been created.
Working Group Summaries Charlotte, NC November 12, 2009.
CIMug Interaction with IEC Randy Rhodes Utility Co-Chair IEEE Power Systems Conference and Expo March 18, 2009.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
Process WG Summary Austin, TX October 26, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Meetings: Europe – June 10, 2008 – June 13, 2008 in.
Integrating the Healthcare Enterprise IHE Radiology: How and Why Chris Carr Director of Informatics Radiological Society of North America (RSNA)
CIM Users Group 2009 Status Update Terry Saxton Randy Rhodes CIMug Co-Chairs UCAIug Annual Meeting November 9, 2009.
September, 2005What IHE Delivers 1 A New Governance for IHE-Europe David Monteau, INRIA IHE-International Meeting, Nov
© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.
Eurostat Sharing data validation services Item 5.1 of the agenda.
Doc.: IEEE /1318r0 Submission December 2009 Rich Kennedy, Research In MotionSlide 1 IEEE Regulatory AHC Draft Teleconference Plan Date:
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
Company Confidential Americas Aerospace Quality Standards Committee (AAQSC) Private Web Based on SAE Standard Works September 28, 2015 The.
Testing Technical Committee Paris, France August 24, 2010
Global Inventory of Statistical Standards
IHE Eye Care Process and Timeline
Margaret Goodrich June 18, 2010
Configuration Management Benchmarking Group (www. cmbg
Emergency Management Technical Committee
The Standards Development Process
Frances Cleveland Convenor WG15
Standards Development: An Overview
Genval EAII Discussion
Presented 12 June 2008 Vasteras, Sweden
CIM Model Manager Report
IOP perspectives Some European point of view with the help of Alstom,Entsoe,EDF Andre Maizener 11/11/2009.
Presentation transcript:

WG Summaries Austin, TX October 24, 2007

Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning of the CIMug web site Coordination of the Technical Issues process Development and coordination of the Help Desk environment Coordination and maintenance of the CIMug mail list Meeting planning and assistance in conducting the meetings of the CIMug Establishment of the budget for the CIMug Development of liaisons with appropriate external groups Adherence to the rules and regulations of the CIMug and UCAIug

Process WG Items for Austin breakout: Planning for future meetings –Spring ’08 in Europe (Vasteras, Sweden) –Fall ‘08 in North America –Fall ’08 in Asia (tentative) Increasing participation in the CIMug –Help desk and issue submittal Building up liaisons

Model Exchange WG Chair: Jay Britton Standard –New draft of standard has been created. (K. Hunter) Rev 4 (May 4, 2007) Various edits and update for CIM 11. Important new classes: –ModelAuthority –ModelAuthoritySet Extended use case discussion added as Appendix A. (J. Britton) –Promotion of model authority concepts European User Group May 2007 NERC DEWG Meeting, Sept 2007 General presentations (PES Atlanta, IEEE Tampa, Utility Integration Houston, …) –Interop 10 (Sept, 2007) CIM version finalized for test (L. Osterlund) Organization (M. Goodrich) Did not test model authorities – expected next year.

Model Exchange WG Related Standards –CIM for Planning EPRI Project Planning & Operating Model Exchange –Wg13 NWIPs EMS Model Update Steady State Solution Active CIM Model Exchange Projects –WECC –ERCOT

Model Exchange WG Items for Austin breakout: Review of Model Exchange Appendix A Use Cases NERC DEWG Meeting Report European Review –UCTE Day-Ahead Model Exchange Process Planning –Summary of EPRI CIM for Planning project activity –MMWG Procedure for Eastern Interconnection Active Projects –WECC and ERCOT Model acquisition from members EMS model update Model availability to members Planning

Marketing WG Objectives of the Marketing Working Group –Promote Use of Technology in Industry –Promote CIM User Group Membership Current Activities –Logo and Brochure Re-Design –Develop Branding Program –Develop Membership Literature

Marketing WG Plans for 2008 –Develop Logo and Membership Literature – Re-Design –Membership Drive ( and mailing list) –Membership Booths (in conjunction with UCA Group) Budget – the above activities have budget but need to be implemented.

Enterprise Application Integration WG Scope: Drive the understanding and implementation of CIM-based message exchange to support efficient and effective communication while establishing a forum for the sharing of such information as well as best practices for exchange of CIM-based information Co-Chairs: Andre Maizener, and Harry Garton (Xtensible Solution) (vendor) – –

EAI WG Activities limited to breakout sessions during Users Group meetings. Trying to get some traction, generate interest, and come up with real issues and real solutions –Determine how to get traction outside of User Group Meetings –Fact: each time we have had interesting and fruitful meetings and break out sessions –Please provide ideas or suggestions to Andre or Harry 2 possible directions for the group: –Exchange best practices and difficulties in using CIM and be a source of request and issues for the various TC57 working groups –Contribute to finalize the methodology to derive messages

Compliance WG Mission: –Formalize definition of CIM Compliance –Define standard compliance testing program, including procedures and tools, documented as CIM Compliance Quality Program. –Co-chairs: Suzanne Caron-André & Maurice Adriaensen

Compliance WG First deliverable: CIM Compliance Definition White Paper (to be part of future CIM Compliance Quality Program) –Status: Submitted for comments to WG13 / WG 14 in Spring –Editorial comments received September –Revised version to be published on CIMug Web Site Progressing CIM Quality Program: Need for compliance validation testing tools