Name: Broadway Plaza Location: Downtown Rochester, Minnesota Building Size: 29 Stories Primary Occupancy: Apartment Building Mixed Occupancy: Business/Retail.

Slides:



Advertisements
Similar presentations
THE AUGUST WILSON CENTER FOR AFRICAN AMERICAN CULTURE PITTSBURGH, PENNSYLVANIA MICHAEL P. ROYER PERKINS + WILL Schematic Design Presentation.
Advertisements

16469 Low Energy Building Design Lighting Cameron Johnstone Department of Mechanical Engineering
The Franklin Care Center Addition and Renovation Franklin Lakes, New Jersey Jennifer Curley Lighting/Electrical Option Faculty Advisor: Dr. Moeck.
Thesis Presentation April 13, 2004 Brian Regan The Virginia Historical Society Building Lighting/Electrical.
Hall Corporate Headquarters Dan Rusnack Tuesday April 13 th, 2004 Lighting/Electrical Emphasis Thesis Presentation Thesis Presentation.
Stephanie Deckard | Final Thesis Presentation | Lighting/Electrical Princeton Theological Seminary Library Princeton, NJ EwingCole.
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Lighting Techniques and Technology Practical Applications Britnei Godusky LC, LEED AP BD+C June 4, 2014AOBA / Current Trends in Sustainability.
David S. Ingalls Rink 73 Sachem Street, New Haven, CT 06501
Pennsylvania State Employees Credit Union Corporate Headquarters Senior Thesis Presentation | lighting / electrical | Sarah Wujcik | | Dr Houser.
Building Information Located in Washington DC on the George Washington University Campus Addition to existing Business School 170,000 Sq Ft 6 floors above.
New Jersey Center for Science, Technology, and Mathematics Education John P. Mulhern November 21, 2008 Schematic Presentation.
West Village Commons Patrick Morgan Lighting/Electrical April 13, 2011.
Newseum and Freedom Forum Headquarters Washington, D.C. Ryan Wise Lighting/Electrical Option Consultants: Dr. Mistrick ; Prof. Dannerth April 15, 2009.
Ballenger East Building Final Presentation Design Development Architectural Engineering Senior Thesis Presentation 2009 Lighting / Electrical Option Student.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
UNIVERSITY OF MARYLAND – BALTIMORE HEALTH SCIENCES FACILITY III SCHEMATIC DESIGN KENNETH M. MOORE LIGHTING / ELECTRICAL THESIS ADVISOR │ SHAWN GOOD 1.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
2009 AE Senior Thesis Presentation MICHAEL P. GARDNER Mixed-Use Project Eastern United States.
Wegmans Fairfax Schematic Design Joseph Lookup The Pennsylvania State University 5 th Year - Architectural Engineer Lighting/Electrical.
Boston University ∙ Arena and Recreation Center 2007 Senior Thesis Alexis M. Kreft Advisor: Dr. Mistrick Architectural Engineering Lighting and Electrical.
Andrea Hauber; L/E AE Dr. Martin Luther King Jr. Library; San José, California 04/13/03; Consultant: Prof. Mistrick Outline of the Final Presentation T.
FLUORESCENT LUMINAIRES Fluorescent Luminaires U.S. Department of Energy Rebuild America Business Partners And Lithonia Lighting.
UNIVERSITY OF MARYLAND – BALTIMORE HEALTH SCIENCES FACILITY III SENIOR THESIS PRESENTATION KENNETH M. MOORE LIGHTING / ELECTRICAL THESIS ADVISOR │ SHAWN.
Background Design Concept Gallery Lecture Hall (acoustics) Meeting Room Conclusions The Bahen Centre for Information Technology Spring 2003 Senior Thesis.
Senior Thesis Presentation: The Westlake Recreation Center Summer Padgett Faculty Advisor: Dr. Mistrick Westlake Recreation Center Westlake, Ohio Electrical.
Maryland Transportation Authority Police Training Facility Schematic Design Presentation December 13, 2007 Leah Clark.
Leah Matern Lighting/Electrical Option Faculty Advisors: Dr. Richard Mistrick and Ted Dannerth April 13, 2011 Crystal Lake Elementary School Lake Mary,
Lutron Thesis ProposalCorron Cultural CenterSara Lappano Sara Lappano, EIT, LC-Intern Lighting/Electrical Option.
The Dubois Educational Foundation Workforce Development & Technology Building Josh Lutton Lighting/Electrical Option.
Center for the arts university towson university Benjamin Mitten Spring 2005 Benjamin Mitten Lighting/Electrical Spring 2005 center for the arts towson.
Center for the Arts Towson, Maryland Schematic Lighting Proposal Ben Mitten Architectural Engineering Pennsylvania State University.
CNBC GLOBAL HEADQUARTERS
Howard County General Hospital
Arlington National Cemetery Renovation Show Building Overview Picture My name Date.
code calculations, construction drawings
Newseum and Freedom Forum Headquarters Washington, D.C. Ryan Wise Lighting/Electrical Option Consultant: Dr. Mistrick Dec. 14, 2007.
Building Overview Lighting Depth & Electrical Depth – Redesign -Streetscape -Gallery -Flex Use Space -Laboratory Architectural Breadth– Southern façade.
Thesis Lighting Design Proposal Dan Rusnack 12/9/03 Lighting/Electrical option Senior Thesis project Hall Corporate Headquarters.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Howard County General Hospital Schematic Design Proposal Casey Schardt.
Howard County General Hospital
CSE Renovation Project Boston, MA Xiaoyin Wu (Laura) Lighting/Electrical | Architectural Engineering | Penn State University.
Dorrance H. Hamilton Building
The School Of Forest Resources Building University Park, Pennsylvania Chris Hoyman The Pennsylvania State University Architectural Engineering Lighting/Electrical.
Naval Network & Space Operations Command (NNSOC) Christopher Ankeny Lighting/Electrical Option Senior Thesis 2007 Advisor: Dr. Richard Mistrick Electrical.
National Naval Medical Center | Bethesda, MD Christine Clowes | May 1, 2009 | Lighting/Electrical | Professors Dannerth and Mistrick N ATIONAL I NTREPID.
North Hills Junior High School Schematic Lighting Design
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Broadway Plaza Schematic Lighting Design Diane Emert The Pennsylvania State University Architectural Engineering Lighting/Electrical Option January 2004.
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
North Hills Junior High School Pittsburgh, PA Senior Thesis Final Presentation 2005 Chris Rush Lighting / Electrical Faculty Consultant: Dr. Mistrick.
Newseum and Freedom Forum Headquarters Washington, D.C. Ryan Wise Lighting/Electrical Option Consultant: Dr. Mistrick Dec. 14, 2007.
Senior Thesis Presentation: The Westlake Recreation Center Summer Padgett Faculty Advisor: Dr. Mistrick Electrical / Lighting Option April 13th, 2004.
Philip Mackey The Pennsylvania State University Architectural Engineering L/E Option HC HOLY CROSS HOSPITAL – NORTH ADDITION FINAL REPORTPhil Mackey Holy.
Harris Theater for Music and Dance Chicago, IL Lindsey K. Beane Lighting/Electrical AE Senior Thesis 2006.
Villanova University: School of Law Jason Greer The Pennsylvania State University Architectural Engineering Lighting/Electrical Option Senior Thesis –
Maryland Transportation Authority Police Training Facility
Greenwich Academy Upper School
The AstroPower Headquarters Newark, Delaware
Rosegarden Branch Library San Jose, CA
for home lighting design
SHEPHERD UNIVERSITY WELLNESS CENTER
Greenwich Academy Upper School
Biobehavioral Health Building, University Park, PA
Lehigh Valley Heritage Center
Presentation transcript:

Name: Broadway Plaza Location: Downtown Rochester, Minnesota Building Size: 29 Stories Primary Occupancy: Apartment Building Mixed Occupancy: Business/Retail (Floors 1-3) Management Goal / Thesis Goal:  Home Away from Home

Lighting Depth  Apartment Lobby  Pool  Skyway Electrical Depth and Construction Management Breadth  Distribution System Redesign and Analysis  Short Circuit Analysis Daylighting, Mechanical, and Construction Management Breadth  Daylighting Study  HAP Analysis of Pool Loads  Dimming Cost and Energy Savings  SkyCalc Preliminary Analysis  Exterior Façade  Function Room  Conference Room  Conference Room Comparison Study

Lighting Depth: Spaces Not Being Presented Function Room Exterior Facade Conference Room Skyway

Location: 1 st Floor Function:  Main entrance/Focal point  Casual waiting tasks Lighting Redesign: Apartment Lobby

Schematic Design Concept Design Goals  Providing a warm & inviting ambience  Creating focal points  Guiding visitors Design Criteria  Luminances of Room Surfaces  System Control and Flexibility  Horizontal Illuminance  10fc ~ General Entrance  30fc ~ Lounge Work Plane  50fc ~ Receptionist Desk  Vertical Illuminance  10fc ~ Receptionist  5fc ~ General Areas Schematic Design Sketches

Solution: Entry Lighting Plan FC1 Fluorescent Cove SC2 Linear Sconce FP2 Indirect-Direct Linear Pendant UC1 Tasklight C1 Fluorescent Cyc Light WW2 Linear Wall Wash FD1 CF Downlight

Solution: Lounge Lighting Plan SP2 Adjustable Spotlight FP3 Decorative Bowl Pendant FC1 Fluorescent Cove L1 Floor Lamp

Solution Summary Energy Savings  21% below ASHRAE 90.1  11% below existing design

Lounge Renderings IESNA: 30 fc Recommendation Design Average: 40 fc

Entry Renderings

Fire Wall Model Study Wall Section Replication

Location: Northeast Corner of 3 rd Floor Function:  Private Pool and Spa Area Lighting Redesign: Pool

Schematic Design Concept Design Goals  Relaxed, private, controllable atmosphere created  Safety hazards minimized  Reflected glare minimized  Maintenance simplified Design Criteria  Daylighting Integration and Control  Uniformity of Light Distribution Coefficient of Variation ~ 0.3 or less  Horizontal Illuminance  30 fc ~ Pool Surface (Recreational swimming)  20 fc ~ 3 ft above the deck Schematic Design Sketches

Solution: Pool Lighting Plan FP4 Linear Indirect Lensed Pendant FD5 CF Lensed Downlight C3,C4 Fiber optic Color-changing Floodlight, 10° tilt

Control System Details Control System  5 Zones, a-e  Radio frequency control, no wiring necessary  Zone changes possible  4 Preset Scenes Integrated Photocell

Solution Summary Energy Savings  10% below ASHRAE 90.1  10% below existing design

Pool Rendering IESNA: 30 fc Recommendation Design Average: 31 fc Pool

Pool Renderings In-pool lighting only

208V vs. 480V & 208V Distribution System Analysis Purpose  Analysis of alternative power distribution system based on first cost and efficiency  In conjunction with the Construction Management Breadth Existing System  (2) transformers, 2500 kVA-480V Multifunction floors, 1000 kVA-208V Residential Redesigned System  (1) 3750 kVA-208V Transformer Analysis Method  Reconfiguration and resizing of electrical equipment and system paths  Relocation of equipment (not included)  Cost analysis

208V Single-Line Diagram

 RS Means 2003 Electrical Cost Data (materials & labor)  Location Factor: Rochester, Minnesota  Time Adjustment: 2002 Design Conclusions  Efficiency, Maintenance, and safety paralleled  First-cost basis ~ Maintain existing power distribution, 480V & 208V Distribution System Cost Analysis 37% Increase for Redesign

Existing Condition Daylighting Analysis E bv = M bv /2 = (E 1/2 kv * ρ b )/2 E 1/2 kv Conclusion  Decrease glass area decrease load  Minimal light loss Goals  Increase skywell efficiency  Decrease glass area  Allow dimming

Finalized Redesign Well ~ 40’ X 6’ Splay ~47’ X 14’

Hap Analysis Existing Design Redesign Existing: 8.6 TonsRedesign: 7.4 Tons Savings: 1.2 Tons or 86% of original  Energy Savings  No equipment resizing

Pool Dimming Yearly Savings: $ Dimming vs. Non-Dimming Equipment Cost DifferenceTime of Payback $ years Skyway Dimming Yearly Savings: $ Dimming vs. Non-Dimming Equipment Cost DifferenceTime of Payback $ years With (11pm-5am) Dimming Considered 5.3 years Daylighting Analysis Alternative Option  Direct switching  Payback~0.5 years

Lighting Depth  Creates a “home away from home” welcoming atmosphere  Provides flexibility and easy control for users  Satisfies all goals and design criteria set forth Electrical Depth and CM Breadth  Alternative power distribution system viable  Selection of existing system based on first cost Daylighting, Mechanical, and CM Breadth  Mechanical energy savings incurred  Electrical energy consumption decreased Conclusions

Individuals and Companies Mr. Edward Wunderley, Mr. Donald Rimer, and Mr. Jack Grzybek of Burt Hill Mr. Michael Manley of Royal Management & Development Mr. Joseph Crick of Oakwood Broadway Plaza Mr. Andrew Sedlak FacultyPersonal Dr. Richard MistrickMy fiancé, Todd Dr. Martin MoeckMy parents, Donald and Janice Professor Kevin ParfittLori, AJ, and Aaron Jonathan DoughertyAll of my fellow AE’s Professor Paul Bowers THANK YOU

Lighting Depth: Spaces Not Being Presented Function Room Exterior Facade Conference Room Skyway

Daylighting Analysis Pool  Continuous dimming over pool Skyway  Continuous dimming along corridor  Rochester, MN weather data  3 Sky Conditions  (5) 2-hour intervals per day AGI 32 Software Study

HAP Analysis Methodology  Proper U-value calculation of surfaces  Lighting Load: 1.0 W/sq.ft.  Occupancy ~ 10 people  Evaporation load of pool (2003 ASHRAE HVAC Applications) w p = 0.1A(p w - p a )F a = lb/h Btuh = w p * 45Btu/lb = Btuh (latent load) Where: p a = saturation pressure at room air dew point p w = saturation vapor pressure taken at surface water temperature F a = 0.65, Condominium Pool Water Temperature = 80  F Dry Bulb Air Temperature = 78  F % Relative Humidity = 55

208V Single-Line Diagram

 RS Means 2003 Electrical Cost Data (materials & labor)  Location Factor: Rochester, Minnesota  Time Adjustment: 2002 Design Conclusions  Efficiency, Maintenance, and Safety paralleled  First-cost basis ~ Maintain existing power distribution, 480V & 208V Distribution System Cost Analysis 37% Increase for Redesign