Worldwide Small Port Survey and Analysis. Why? Initially, to determine the optimum TSV characteristics  Limited area  Data collection confined to TSV.

Slides:



Advertisements
Similar presentations
1 COSTANTZA HARBOR DEVELOPMENT MASTER PLAN speaker: Nicoleta DOGARU Head of Development Department National Company Maritime Ports Administration SA Constantza.
Advertisements

TEN-T support for Port projects under 2012 Annual Call INFO DAY 2012: Ports (AP) Jose Anselmo, DG MOVE Morten Jensen, TEN-T Executive Agency Brussels,
EU Strategy for the Danube region Wien-Bratislava, April 2010 Dipl. - Ing. Alexandru Capatu.
Identify the key elements in the development process that help maintain a balance between the physical capacity of a beach resort and the economic needs.
«SOUTHEAST EUROPEAN INTERMODALITY»
Louisiana Coastal Erosion. The problem LA contains approximately 40% of the nation's wetlands and experiences 80% of the nation's coastal wetland loss.
OCEN 201 Introduction to Ocean & Coastal Engineering Coastal Processes & Structures Jun Zhang
Topic 19 Shoreline Engineering
Use of hubs in the Container Terminal Industry Carl Jensen, Vice President APM Terminals International (Singapore Regional Office) IAPH Forum, HCMC Vietnam.
JLOTS14 LOGO JLOTS14 LOGO J2 (U) General Weather: While weather patterns continue to improve, temperatures will remain near or well below freezing. Some.
Facilities and Infrastructure December 10, Barletta Construction: Parent Organization In 1914, Vincenzo Barletta, a recent immigrant from Italy,
Adelaide Coastline Sand Carting May 2004
Scroby Sands Offshore Wind Farm Update 18 April 2002 Anne-marie Coyle.
CANADIAN COAST GUARD AUXILIARY - PACIFIC PASSAGE PLANNING CANADIAN COAST GUARD AUXILIARY - PACIFIC February 2012.
1 Constantza Port - Your Black Sea CONSTANTIN MATEI GENERAL MANAGER National Company “Maritime Ports Administration” Constantza ROMANIA 4 October.
URBAN FLOODS IN GREECE Current situation and major research and development needs in Urban Flood Management Cost meeting, Warsaw, 29-31/5/2008 Vassilopoulos.

Essential reading:  T. Skračić, Waypoint – English Textbook for Maritime Students, Faculty of Maritime Studies, Split 2010, Units  T. Trappe &
INTRODUCTION Grade separation is an effective way of handling intersecting traffic with greatest efficiency, safety, capacity. An interchange is a system.
Remote Sensing Section 2.3. Landsat Satellite The process of gathering data about Earth using satellites, airplanes, or ships is called remote sensing.
Definition of Hydrography
Henning Roedel Civil and Environmental Engineering Department Stanford University November 25, 2008.
Plan Formulation for Deep Draft Harbors Navigation Measures.
Regional Resource / Global Gateway Colin Parker, Chief Executive | 27 August 2008.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
1 Practical Applications and Approaches on SITS Transportation in Australia.
Navigation Introduction Equipment Surface Positioning Measuring Distances Underwater Natural Navigation Compass Navigation.
SOUTHERN REGION OF THE RUSSIAN FEDERATION ROSTOV-ON-DON.
The Coast 1. The Sea 2 Wind Waves The Sea 3 TidesCurrents 1.Long-Shore 2.Cross-Shore.
Status Quo report Ennshafen Location Port Infrastructure History Handling Statistics Container Terminal data RoRo data Port Facilities Infocenter Danube.
«UKRAINIAN SEA PORTS AUTHORITY» SKADOVSK SEA PORT AUTHORITY
Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
LESSON 1: INTRODUCTION Approach to Problem. BEACH PROFILE Coastal Processes with Engineering Applications (Dean and Dalrymple)
Wilmington Harbor Project - 96 Act Brannon Quel. Port of Wilmington The Cape Fear River serves as the shipping channel to the State Port in Wilmington,
Shape Anticipate InnovateLead Shape, Anticipate, Innovate, and Lead MAJ Jim Gray DA G-4 FP DSN JLOTS JIPT Update LCDR Shaugn Ostrowski N422 DSN.
PORT ACCESSIBILITY DATABASE David Krawchuk: Team Leader Watercraft & MHE Team.
Dr Gary MockeDr Gary Mocke. No interference with coastal processes No need for any expenditure Social impacts (relocation, loss of beach access and.
Shanghai – Constantza – Budapest
Offshore Wind Energy in the region – EMDEN (Germany)
The Importance of Transport to Business 1. Connect various stages of production and distribution channels 2. Facilitate localization 3. Provide more.
Navigation NAU 102 Lesson 7. Introduction Nautical Publications Charts are not enough! We need more information. Voyage planning. Often paper & electronic.
PORTS Marina Zanne, M.Sc.
OPERATION TOMODACHI HA/DR 18 MARCH N 14154E N 14054E N E N 14015E – 3948N 13940E N 14001E N 14130E N.
International conference "Greening Motorway of the Sea" April 2005 in Stockholm “Environmental aspects of Klaipeda seaport development strategy”
Port of Black Sea Regional Conference 31 st October 2007 CONSTANTIN MATEI GENERAL MANAGER National Company “Maritime Ports Administration”
Transport Geography Chapter 4 – Transportation Terminals Concepts Copyright © , Jean-Paul Rodrigue, Dept. of Economics & Geography, Hofstra University,
Google Earth 20/1/2015 Gaston Jondet 1916 N.
SARAJEVO BUSINESS FROUM Brčko district of Bosnia and Herzegovina
PORT AND HARBOR ENGINEERING
Harbors and Ports Engineering Geology – CE31FB2.
Environmental Science
Prepared for - tusharhsonawane.wordpress.com
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
Coastal Zones.
Gatchalian, Rein Edrian Hernandez, Diana Erika Ramos, Aira Coline
Port of Durban Role of the port
Kestutis Oginskas Inland Waterways Center Liepaja, 2011
Thailand Inland Water Transport System
Investment opportunities in Italy
Geography Standards - EOG Test
PORT MANAGEMENT ASSOCIATION OF WEST & CENTRAL AFRICA CASE STUDY: THE IMPACT OF MODE OF FINANCING ON PORT INFRASTRUCTURE CONSTRUCTION NIGERIAN PORTS PERSPECTIVE.
Subzones.
Beach Erosion.
The port of east london The port of rotterdam.
Rule 6 Safe Speed.
Breaches.
Digital Libraries and Online Education
INTRODUCTION TO PORT DESIGN
Belfast Harbour – Renewable Energy Facility
Presentation transcript:

Worldwide Small Port Survey and Analysis

Why? Initially, to determine the optimum TSV characteristics  Limited area  Data collection confined to TSV accommodation Large and moderately size ports are already documented  World Port Index  Lloyds Port Index  Sailing Directions Complete survey of small port in all militarily significant geographical areas to support SEA-OF  Bathometry  Topography  Infrastructure

1 KOJIN-HANG 2 SOKCH’O-HANG and TAEP’O-HANG 3 CHUMUNJIN-HANG 4 KANGNUNG 5A HUP’O-HANG 5B HUP’O-HANG 6 YANGP’O-HANG 7 KYEMA-HANG 8 KANGHWA-DO Korea Survey

KOJIN-HANG ADVANTAGES  Good approach  Good anchorages inside and outside harbor  Navigational aids  Lighted entrance  Adequate depth and turning basin  Protected harbor  Breakwaters  Quay wall  Road system and rail access DISADVANTAGES  Close proximity to North Korea (10 km)  No ramps or piers  No apparent storage facilities  Limited staging area  No apparent cargo handling equipment ESTIMATED SUPPORT REQUIREMENTS  Build ramp(s), pier, and staging area SURVEY REQUIREMENTS  Staging area  Quality rail/road network  Survey tidal range  Sea and wind condition forecasts LAT: 38 o 24’ N LONG: 128 o 27’ E INDEX #1

HUP’O-HANG (B) ADVANTAGES  Protected harbor  Good anchorages inshore and offshore  Navigational aid  Small jetty  No additional piers or ramps required  Additional unprotected sand beach NE of breakwater  Sand beach, good gradient within harbor DISADVANTAGES  No rail access  Unprotected sand beach ESTIMATED SUPPORT REQUIREMENTS  Inshore beach protection SURVEY REQUIREMENTS  Gradient  Survey tidal range  Sea and wind condition forecasts LAT: 36 o 41’ N LONG: 129 o 27’ E INDEX # 5B

KANGHWA-DO ADVANTAGES  Near DMZ (10 km)  Adequate harbor and turning basin  Apparent beaching area  Road access  Approach navigational aids DISADVANTAGES  Near DMZ  No facilities ESTIMATED SUPPORT REQUIREMENTS  Build ramp(s), piers, facilities, and staging area SURVEY REQUIREMENTS  Total survey required for suitability  May be useable for J/LOTS only LAT: 37 o 30’ N LONG: 126 o 00’ E INDEX # 8