EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel +32 2 502 41 41 Fax +32 2 502 42 39 EOTC2003© - #1.

Slides:



Advertisements
Similar presentations
Presented By Amey S. Dabak Umesh U. Patil
Advertisements

RCDs RoHS Program RESISTORS-CAPACITORS-COILS-DELAY LINES Action Item 1) Develop lead-free option on all product lines 2) Adopt lead-free construction as.
Technical Challenges of RoHS Compliance by Leo Lambert EPTAC Corp, Manchester, NH for for Implementing Lead-Free Electronics Workshop February, 28, 2006.
Roadmap for Sourcing Decision Review Board (DRB)
Test Automation Success: Choosing the Right People & Process
WORKING DETAILS OF VERTICAL ANNEALING FURNACE TWIN TYPE.
Loctite PSX-D and PSX-P Thermal Interface Materials
GENERAL IDEAS IN AIR POLLUTION CONTROL
Solar Keymark The European Certification Scheme. Content 2 CEN Keymark logo:
Project Concept Formation Feasibility Studies & Reports
Georgia Institute of Technology Systems Realization Laboratory DFE, ECDM, etc. in Practice.
Materials Management BUS 3 – 141 Quality and Specification Leveraging Technical Excellence Week of Aug 31, 2010.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #2.
Lead-Free Electronics Thermal Management of Electronics San José State University Mechanical Engineering Department.
ELECTRONICS MANUFACTURING SERVICES © 2006 Sanmina-SCI Corporation. Sanmina-SCI is a trademark of Sanmina-SCI Corporation. All trademarks and registered.
Copyright Reserved Roadmap and Control for the Implementation of the European RoHS Directive NeoPhotonics Corporation Revision, December 2008.
Brad Cochrane Graeme Currie February 12 th, 2012.
Managing Lead and Lead-Free Transition Dr. Sudarshan Lal FCI USA, Inc. Etters, PA (USA) June 20, 2002.
EASY–ECO 2010 Sustainable Development Evaluations in Europe: From a Decade of Practices, Politics and Science to Emerging Demands Brussels, November.
Rockwell Collins: WEEE, RoHS and Pbfree Soldering Processes! David Hillman Advanced Process Engineering May 2006.
Add Corporate Logo Here
A c c e l e r a t i n g Y o u r S u c c e s s ™ Electronics Marketing: Electronic Components EMEA Core Distribution Services Financial Strength & Inventory.
Trends in supplier selection In the past: supplier selection should be purchasing’s domain Now: necessary to bring together organizational resources outside.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
2011 PK Mwangi Global Consulting Forming a Strategy for your Business. Strategy refers to the plan that needs to be put in place to assist the business.
VR Service Models for Individuals with ASD 1 Effective Vocational Rehabilitation Programs for People with Autism Spectrum Disorders Part Two – Featuring.
Legacy systems overview DT Legacy System definition “Legacy system is deficiency in a system in terms of its suitability to the business, its Platform.
EXECUTIVE ROUNDTABLE SERIES 1 Impacts of REACH on the aviation sector Mathieu Farge, Senior Associate, Environment June 3, 2010 KEY LEGAL CONSIDERATIONS.
Restriction of Certain Hazardous Substances (RoHS)
Pb-Free Electronics Risk Management (PERM). What PERM is: A Consortium sponsored by the Aerospace Industries Association (AIA) Includes industry and government.
SE Team Agenda Review work being done by Dwayne –Review Sect 4.4.X for DAG – being processed –SEP Guide – being processed; seen as OK –Technical Reviews.
Your Trade Connection with India T&A TRADE SOLUTIONS PVT LTD Business with India Starts Here….
Regulations on Hazardous Substances (RoHS Directive) EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax
Software Metrics and Reliability. Definitions According to ANSI, “ Software Reliability is defined as the probability of failure – free software operation.
Introduction to Soldering
IPC Thermal Transfer Components, which for thermal reasons require extensive surface contact with the board or with a heatsink mounted on the.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
The Challenger Sale Driving Growth by Taking Control of the Customer Conversation © 2014 The Corporate Executive Board Company. All Rights Reserved.
Lead Free SMD Film Capacitors - Munich 15/11/ Lead Free SMD Film Capacitors November 2006 Francesco Bergamaschi - Product Manager
I2 U Intelligent Supply Chain Management Course Module Twelve: Inventory Deployment.
1 EU Directives and Their Impact on the Aerospace Industry DSPO Conference March 5, 2008 Rusty Rentsch, Aerospace Industries Association Director, Life.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
1 Supplier Cost/Technical Optimization (SCTO) Supporting GHSP VAVE Process.
ERP Components. Introduction ERP software is made up of many software components. Each component represents the major functional area of the organizations.
Common borders. Common solutions. EUROPEAN UNION GOVERNMENT OF ROMANIA SERBIAN GOVERNMENT Structural Funds Romania – Republic of Serbia IPA Cross-border.
The EU Training Programme for Turkish Chamber Executives Machinery Eurochambres Chamber House 19 A/D Avenue des Arts B-1000 Brussels Belgium Tel: +32 (0)2.
A Company Selling Technology and not just a Product.
Jauch Quartz GmbH Road map “lead free products”. Jauch Quartz GmbH: lead free program Program is in accordance with European Union (EU) Legislation: Restrictions.
Solving Microelectronic Obsolescence Through Die Reclamation, Re-Assembly & Test A Proven Solution to Provide Management Support for Diminishing Manufacturing.
The world's largest conglomerate by revenue Samsung Electronics the world's largest electronics company.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
Your Electricity Expenses During Winter and Summer Cooling fans are an essential component of any electronic system. The reason for this is that electronics.
Applying Lean Principles in Warehouse Operations
Pereles Bros., Inc North 60th Street Milwaukee, WI
Facts About the Dell Inspiron 1525 Laptop Battery When it comes to laptop batteries, the level of confidence we have in our original ones or the.
Update on Pb-free Electronics in Military Systems David Locker.
Principles of Business & Finance Objective 4.02
PRESS RELEASE Mid-Voltage Power MOSFETs in PQFN Package Utilizing Copper Clip Technology DATA SHEETS HI-RES GRAPHIC The new power MOSFETs featuring IR’s.
Occam Process
Water for Learning Workshop
Preventing Medical Device Recalls
IEC e-Learning module Module 31 – unit 03 IECQ Benefits © IEC 2017.
Revision 1 July 2016.
Principles of Business & Finance Objective 4.02
“Your single source solution to component distribution”
Management Information Systems
Impact of the Öko-Institut Recommendations on an Avionics OEM :
ประกาศกระทรวงอุตสาหกรรม ฉบับที่ 5292 (พ.ศ. 2562)
Presentation transcript:

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #1 The RoHS Directive Implementation RoHS may be more expensive for OEMs than WEEE OEMs need to be ready at least 1 year before implementation due to “design cycles” – i.e. 1 July 2005 Certain applications cannot be substituted by 1 July 2006 such as: –Lead in high melting temperature solder –Lead in ceramic electronic parts, such as piezo devices

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #2 The RoHS Directive Lead Health Effects Effects on the Central Nervous System, particularly in children Inhibits mental development in children Damages kidneys and reproductive system Can cause anemia (blood disorder)

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #3 The RoHS Directive Materials alternative to lead Lead solder substituted with lead free solder Soldered connectors substituted with press- fitted connectors

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #4 The RoHS Directive Lead free solders Most of the technical work to-date has concentrated on identifying alternative solder materials to the present lead-containing solders and the associated attachment processes, along with reliability assessments of the solder joints formed with lead-free solders

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #5 The RoHS Directive Status of lead free manufacturing Industry is putting significant effort (time/money) to ensure conversion is successful by the timelines stipulated in the RoHS Directive Implications of replacement materials –Energy (higher temperature) –Components (higher temperature ratings) –Boards (higher temperature ratings) –Solder (contains silver, patent royalty issues) –Equipment (10-12 zone furnaces required) –Wave solder equipment –Lower yields/higher scrap rates

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #6 The RoHS Directive Status of lead free manufacturing Key Challenges Technical data generation and evaluation: –Solder joint reliability –Component/board reliability (higher processing temps) –Forward/backward compatability –Reflow profile control –Tin whiskers may form, causing shorts

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #7 The RoHS Directive Status of lead free manufacturing Logistical Issues: –Part Numbers >Need new part numbers for all items not backwards compatible –BOM (Bill of Materials) Control >Control to avoid mixing of lead-free with old components (potential solder joint reliability concern)

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #8 The RoHS Directive Status of lead free manufacturing Logistical Issues: –Excess inventory >What to do with lead-containing inventory after cut off? >How to manage last-time buys of lead- containing product? –Component availability

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #9 The RoHS Directive Conclusions and next step –Technical solutions being worked on but need adequate time/effort to resolve reliability issues >Manufacturers and component suppliers are educated and working hard to meet the deadlines, but again, time to ensure reliability of replacement materials is needed

EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax EOTC2003© - #10 The RoHS Directive Conclusions and next step –Need for precise definitions >Industry working to clarify –There are serious logistics issues >Product qualifications are complex and time-consuming; they take time/resources, especially if components require changing and re-qualifications

Thank you… Please feel free to contact us EOTC aisbl Rue de Stassart, 36 B-1050 Brussels Belgium Tel Fax Questions ??