1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)

Slides:



Advertisements
Similar presentations
MONITORING FUND MANAGEMENT SCHEME Today’s Software for tomorrow YOJNA.
Advertisements

INTERNAL AUDIT Mechanism in SSA-MADHYA PRADESH. Staff sanctioned for Financial Management S.No.Name of Post Post sanctioned Post FilledPost Vacant State.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
Presented By Sandra Watson (General Manager) JAMAICA MORTGAGE BANK SEMINAR For.
Guidelines for “Central Sector Scheme for Salvaging & Rearing of Male Buffalo Calves” GoI has introduced a Centrally Sponsored Scheme called.
Presentation on Preparation of Bank Reconciliation Statement by Chief Consultant, TSG and Finance Controller, SSA Assam.
IRCC Orientation Programme Life cycle of a Sponsored Project.
Capacity Building Capacity building for financial Management Integral part for effective and efficient functioning of Financial Management Unit. Needs.
DEPARTMENT OF INSPECTORATE OF FACTORIES The Department Inspectorate of Factories is functioning under Ministry of Labour & Employment, Government of Tamil.
Centre of excellence for chemical sector Industrial Training Institute, Jamnagar ISO 9001 : 2000 Certified.
Madurai Date: 10 & 11th March 2014 STATE LEVEL NODAL AGENCY TAMIL NADU.
West Bengal IWMP Annual Action Plan
First 5 LA Invoicing & Budget Modification Workshop OHCD Contractors FY
Documentation and Audit Reporting in NPO Sectors Patna 23 rd July 2012.
Room No.6, 4 th Floor, Commerce House 2A, Ganesh Chandra Avenue, Kolkata Connect : (033) ; (033) ;
June 27, Preparation of Project Account & Trimester IPR.
Demography of Sikkim: Sikkim is one of the second smallest states in India being surrounded by China, Tibet, Bhutan, Nepal & West Bengal. Area: 7096.
NC CFW Expenditure reports How to complete and submit an expenditure report Expenditure reports How to complete and submit an expenditure report.
Budget Committee Workshop February16, Oregon’s local budget law is a group of statutes that require local governments to prepare and adopt annual.
FERNS PARADISE AGM July 15th, 2012 Presentation By Management committee 1AGM, July 15th, 2012.
Progress Review On Ongoing Construction Projects aimed at Budget Professor Ranjith Premalal De Silva Vice Chancellor Uva Wellassa University, Sri.
1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)
TERM LOANS PROCEDURAL REQUIREMENTS. Obligations of assistance.
Industrial Training Institute Surendranagar Centre Of Excellence Production And Manufacturing Sector Industrial Training Institute Surendranagar Centre.
Presentation On Annual Action Plan for IWMP-HARYANA
 An independent society known as ‘Mahatma Gandhi National Employment Guarantee Scheme- Social Audit Society’ has been registered on under.
DINALEDI CONDITIONAL GRANT: RD QUARTER PERFORMANCE.
10/21/ Ferns PARADISE AGM SEP 2009  PRESENTATION  By  Management committee.
Project Special Purpose Vehicle Company (SPV) - An Option
21 st Sep Election Process July & August
1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
CORPORATE SOCIAL RESPONSIBILITY As the name suggests it denotes the responsibility of the corporate entities towards the society in which it operates its.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
1 APIP for From , submission of APIP by States/UTs in the prescribed format is mandatory.APIP to be prepared based on the Administrative.
ACTING Chief Financial Officer Water Trading Entity
Mid Day Meal Scheme MDM-PAB Meeting –HARYANA On
Credit Risk. Possibility of loss from the failure of loan or debt instrument repayments. Change in the repayment capacity of borrowers or debt instruments.
ICDS System Strengthening & Nutrition Improvement Project (ISSNIP) Presentation by: State Project Management Unit Department Women & Child Development/Social.
Department of Rural Development Government of India Rural Housing 16 th January 2013 (Group –II)
Review of utilization of 13 th FC Grants Finance Department
ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar.
F.Y rd May, 2014 Financial Management.
Review of utilization of 13 th FC Grants Finance Department
Presentation by Ms Z Mathe Chief Director: Water Trading Entity January 2011 Presentation to the Portfolio Committee: Water & Environment Financial.
ANNUAL ACTION PLAN OF GUJARAT STATE (FY ) Gujarat State Watershed Management Agency(GSWMA) 16/3, Dr Jivraj Mehta Bhavan, Gandhinagar Gujarat.
Dr. Mohamed Riyazh Khan DoMS
Sarva Shiksha Abhiyan SSA, UT Mission Authority Andaman & Nicobar Islands loZ f’k{kk vfHk;ku CIVIL WORKS.
Enhanced Wireless Funding through HB 361 Shawn S. Smith Interim Ohio Coordinator.
1 Hospital Revitalization Grant Performance Report: Free State.
REGIONAL REVIEW MEETING SOUTHERN REGION STATES Hyderabad DEPARTMENT OF LAND RESOURCES MINISTRY OF RURAL DEVELOPMENT GOVERNMENT OF INDIA 21 st November,
ActionSoft Tool for Scheme Implementation & Monitoring.
Application for NEW Course Increase In Sanctioned Intake New College Kindly Bring the soft copy of the presentation (also it at
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
1 ANNA INSTITUTE OF MANAGEMENT, CHENNAI, TAMIL NADU WELCOMES YOU.
Interreg Atlantic Area Programme Eligibility Rules.
Review of Implementation of Smart Cities Mission
Review of Implementation of Smart Cities Mission
Proposals for State: ……..
Chair : Hon’ble Secretary Secretary / Chief Executive Officer (CEO)
INTEGRATED TRIBAL DEVELOPMENT AGENCY (YANADIS), NELLORE
NATIONAL HYDROLOGY PROJECT
Review of Implementation of Smart Cities Mission
Review of Implementation of Smart Cities Mission
GROUNDWATER DEPARTMENT - KERALA
WELCOME ANNUAL ACTION PLAN For IWMP
GRANT – RECAPITALIZATION OF LIBRARY SERVICES SEPTEMBER 2009
UNIT 1 B ROLE OF ENTREPRENEUR.
Housing & Urban Development Department Government of Odisha
PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT 13 MARCH 2019
Presentation transcript:

1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR) FOR THE IIUS PROJECT I.GENERAL As on Name and location of the Industrial ClusterPump, Motor and Foundry Cluster, Coimbatore. 2.Name and address of the SPV of the (with Telephone / Fax number and Coimbatore Industrial Infrastructure Association 8/4, Race Course, Coimbatore Tel: , , Fax : Name, designation and address of the President and Managing Director of the SPV Sri G. Rajendran 46, ATT Colony, Coimbatore URL address of the Web Site of the SPVWeb: 5.Name, designation and address of the nominee directors of the State Government and other institutions (if any) Govt. of Tamil Nadu has communicated that GM, DIC, Cbe will represent the Industries Commissioner and Director of Industries and Commerce, for the time being in the Committee of SPV (GM – Sri.. S. Asokan) 1.Dr. R. Rudramoorthy, Representing R&D Institution. 6.Date of the last meeting of the Board of Directors (Pl. attach minutes of the meeting) 23 rd January 2006, Minutes of the meeting enclosed. Also available in our Website. 7.Break-up of employment in the SPV Appointed 1. Chief Financial Officer, 2.Project Engineer, 3. Accounts Officer and 4. Office Assistant/Secretary 5. Asst. Engineer and they have joined duty. The services of SIEMA staff is also being utilized. 8.Whether statutory clearances have been obtained from respective agencies for implementation of the project? Kindly give details thereof. None required for the activities commenced. 9.Whether information about various tenders and contracts of different work are made available on the website of the SPV Yes. All the details of tender and decisions of meeting are available in the website.

2 II. FINANCIAL PROGRESS 10.Name and address (with Telephone / Fax numbers and ) of the Bank holding the Project account (Trust and Retention Account ) of the SPV and the Project Account Number. State Bank of India, Commercial Branch Trichy Road, Coimbatore Tel: , 44 Fax : IIUS Grant A/c No Project No lien Account viz. Trust and Retention Account No.: Reserve Fund Account Number Project Components and break-up of Project Cost in Rs. Lakh: Sl.Project Component 1 Total Project Cost Total IIUS Grant Amount released / contribution received till dateExpenditure incurred till date IIUS Grant Bank / FI (if any) SPVTotal Expenditure vis-à-vis IIUS Grant Total Expenditure 1)Building for Business Center Training & Information Centre Segment-4 Sl.No.7 of Approval Letter )Land for segment 4 and partly for segment 1, Segment-4 Sl.No.5 & Segment-1 Sl.No.1 of Approval Letter. 232__ _ 3)Administrative Expenses ( ) _ __

3 12.Project Components and break-up of Project Cost in Rs. Lakh: Sl.Project Component 1 Total Project Cost Total IIUS Grant Amount released / contribution received till dateExpenditure incurred till date IIUS Grant Bank / FI (if any) SPVTotal Expenditure vis-à-vis IIUS Grant Total Expenditure 4)Covered Under Tender 1, 2 & 3 of a) Infrastructure for Business Centre, segment 4 Sl.No.2 of Approval Letter. b) For Purchase of Equipments such as Spectrometer, Equipments for Testing and Upgradation of Si’Tarc Testing Lab Segment 4 Sl.No.3 & 8 of Approval Letter. c) Testing System for 60Hz supply and Equipments for testing Segment 4 Sl.No.9 & 13 of Approval Letter (101.77) + (99.47) + (37.0) + (105.0)

4 12.Project Components and break-up of Project Cost in Rs. Lakh: Sl.Project Component 1 Total Project Cost Total IIUS Grant Amount released / contribution received till date Expenditure incurred till date IIUS Grant Bank / FI (if any) SPVTotal Expenditure vis-à-vis IIUS Grant Total Expenditure 5.Construction of R.C.C. Building for Office & Library with a plinth area of (Approx) 2000 Sq.ft. / foundation designed for G+2 floors and construction of asbestos cement sheet roof building with a plinth area of 2000 Sq.Ft. at COSMAFAN Foundry & Industrial Park at Arasur, Coimbatore District. (Project Item 1, Sl.No.2 & 5) Construction of R.C.C. framed structure building for Office & Library of Plinth area (Approx) 2000 Sq.ft./foundation designed for G+2 floors and construction of asbestos cement sheet roof building with a plinth area of 2000 Sq.ft. at COFIOA Foundry & Industrial Park at Kallapalayam (Project Item 1, Sl.No.2 & 5)

5 12.Project Components and break-up of Project Cost in Rs. Lakh: Sl. No. Project Component 1 Total Project Cost Total IIUS Grant Amount Released / contribution received till date Expenditure Incurred till date IIUS Grant Bank / FI (if any) SPVTotal Expenditure vis-à-vis IIUS Grant Total Expenditure 7 Laying of roads with culverts at COSMAFAN Foundry Industrial Park at Arasur (Project Item 1, Sl.No.5) Laying of roads with culverts at COFIOA Foundry Industrial Park at Kallapalayam (Project Item 1, Sl.No.5) TOTAL = SLNO _ Tender No.8/2005 Construction of buildings and creating infrastructure at an estimated cost of 438 lakhs sl.no.3&4 of item no.I and sl.no.6 of item no.IV Registration of land 70 cents for creating common facilities at Arasur at COSMAFAN foundry industrial park. Item I, Sl.No ___ _ 11. Registration of land 30.3 cents for creating common facilities at Kallapalayam at COFIOA foundry industrial park. Item I, Sl.No ___ _ 12 Registration of land cents for creating common facilities at Manickampalayam COSMAFAN industrial park. Item I, Sl.No ___ _

6 Sl.Project Component 1 Total Project Cost Total IIUS Grant Amount Released / contribution received till date Expenditure Incurred till date IIUS Grant Bank / FI (if any) SPVTotal Expendit ure vis-à-vis IIUS Grant Total Expendi ture 13Tool Room Machinery for Product Die & Mould Centre at an estimated cost of Rs.593 lakhs, Item IV Sr.No Si'Tarc upgradation facilities Testing Machine Tools, Accessories, RM Testing etc. Item No.4, Sl.No.2,3,4,8,9,11,12, & _ Laying of Road with culverts at COSMAFAN Foundry Industrial Park at Manickampalayam at an estimated cost of Rs.65 lakhs _ Grand Total Total outstanding balance in the IIUS Grant account as on date (Rs.Nil lakhs)

7 III. PHYSICAL PROGRESS 13. Actual project accomplishments till date for each project component and implementation schedule. Sl.NoProject ComponentDate of estimate sanction Date of Tender Issue Date of Work Order Date of Commencement of Work Status of Work Completion in % Likely date of Completion 1.Acquisition of 1.06 acres of land at Avarampalayam, Peelamedu, for segment 4 and partly for segment 1Item IV Sl.No N.A %Document Registered on Acquisition of building at II floor at Race Course to an extent of 3974 Sq.Ft. built up area Plus 1649 Sq.Ft. Vacant area for creating multiple facilities under Segment 4 of the project. Item IV Sl.No N.AN.A %Document Registered on Creation of Business Centre Item IV, Sl. No. 2 Tender Notice 3/ % Purchase of equipments like Spectrometer, equipments and facilities to upgrade the Si’Tarc Testing Lab Item IV Sl.No. 3 & 8 Tender Notice 1 & 3/ % Testing System for 60 Hz Supply and equipments/machineries for Si’Tarc Item IV, Sl.No. 9 & 13 Tender Notice 2/ %completed

8 Sl.NoProject ComponentDate of estimate sanction Date of Tender Issue Date of Work Order Date of Commence- -ment of Work Status of Work Completion in % Likely date of completion 6.Acquisition of land for creating common facilities at Arasur at COSMAFAN foundry industrial park. Item I, Sl.No N.A %Land Registered on Acquisition of land for creating common facilities at Kallapalayam at COFIOA foundry industrial park. Item I, Sl.No N.A %Land Registered on Creating Infrastructure at Arasur such as a) laying of roads, b) construction of office and c) meeting hall building for an estimate of Rs.180 lakhs. Item I, Sl.No.2 & Before Dec 5 th % Creating Infrastructure at a) Kallapalayam such as laying of roads, b) construction of office and c) meeting hall building for an estimate of Rs.50 lakhs. Item I, Sl.No.2 & Before Dec 5 th %

9 Sl.NoProject ComponentDate of estimate sanction Date of Tender Issue Date of Work Order Date of Commencement of Work Status of Work Completion in % Likely date of Completion 10. Construction of buildings and creating infrastructure in a total building area around 60,000 Sq.Ft. at an estimated cost of Rs.438 lakhs for a)Training centre / seminar hall / small group meetings. Item I, Sl.No. 3 and 4. b)Product Die and Mould Centre.Item IV, Sl.No. 6. c)Skill upgradation – product development facilities including pattern shop and CAD and CAM Training center for engineers / workers / women workers: item No. I, Sl.No Before % High Precision Vertical machining centre and CNC Lathes Vertical & Horizontal machines Item No IV Slno. 1 Estimated cost Rs.250 lakhs % Creation of training infrastructure, office facilities including building, false ceiling, A/C,etc., Estimated cost Rs.50Lakhs. Item IV S.No: Before July 2006 Aug 2006Sep. 2006_Within 6 Months 13. Up-Gradation of SiTarc facilities purchase of equipments, Machines etc estimated cost Rs Lakhs item IV Slno.2,3,4,8,9,12 & %Within 6 Months 14 Acquisition of acres land for creating common facilities at Manickampalayam in COSMAFAN Foundry industry park (item no.I, sl.No.1) NA 100%Land registered on 2 nd March’06 15 Building, drainage, street light, roads, weigh bridge, water supply etc for small foundry industrial park’s requirements (item no.I, sl.no.2 & 5). Estimated cost Rs lakhs Partly Before July 2006 Before July 2006_10%Dec Construction of Canteen building at two places for small foundry (item no.I, sl.no.9).Estimated cost Rs 36.7 lakhs Before Aug. 2006__ _Feb 2007

10 Sl.NoProject ComponentDate of estimate sanction Date of Tender Issue Date of Work Order Date of Commence- -ment of Work Status of Work Completion in % Likely date of completion 17Tool Room Machinery for product die mould centre at an estimated cost of Rs.593 lakhs, Item IV Sr.No & & %Dec Purchase of Raw Material Testing Eqipments at three places for Small foundry industrial parks Before Aug.2006 _25%Feb Creation of infrastructure such as laying of roads Item No.I Sl.No.2 at Foundry Complex-III, Manickampalayam Before Before %Jan 2007

Any Other Relevant Information : We request GOI – DIPP to release the II installment of IIUS GOI grant at the earliest, so as to enable COINDIA to implement the cluster project with in the projected timeframe. Date : Place : Coimbatore

12