Status of the HINS Linac Front End Focusing Lens Development Can we use these lenses in the SSR1 crymodule of PXIE ? 9/27/20111 I.Terechkine for PXIE Cryomodule.

Slides:



Advertisements
Similar presentations
Superconducting Spoke Resonator Cavities and Cryomodules
Advertisements

PXIE: SSR1 Section Focusing Lens 1.Requirements table 2.Developed at FNAL 3.Available from vendors 4.Used at ANL 5.Layout of the SSR1 cryomodule 6.Case.
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
April 24, 2008 FNAL ILC SCRF Meeting 1 Main Linac Superconducting Quadrupole V. Kashikhin, T. Fernando, J. DiMarco, G. Velev.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Solenoid-Based Focusing Lens for a Superconducting RF Proton Linac Presentation prepared for AEM 11/08/20101I. Terechkine.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
Magnet designs for Super-FRS and CR
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
October 4-5, Electron Lens Superconducting Solenoid Michael Anerella October 4, 2010 Electron Lens.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Focusing Solenoids Yuri Tereshkin Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Focusing Lens for the SSR1 Section of PXIE Preliminary analysis of main options 3/13/2012I. Terechkine1.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
February 13, 2012 Mu2e Production Solenoid Design V.V. Kashikhin Workshop on Radiation Effects in Superconducting Magnet Materials (RESMM'12)
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Focusing Lens for PXIE SSR1 Cryomodule Summer 2012 Status 7/10/2012I. Terechkine1.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
PIP-II Solenoid Focusing lens for SSR2 Cryomodule Kumud Singh, Affiliation: Bhabha Atomic Research Centre PIP-II Technical Meeting 19 Jan 2016.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
MICE Coupling Coil Test Proposal Ruben Carcagno Fermilab July 9, MICE CC Test Proposal7/11/2011.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Possible Configurations for Prototypes of PX Cryomodules: SSR0 and SSR1 Prepared for discussion at the HINS  PX technical meeting 12/10/20101I. Terechkine.
September 27, 2007 ILC Main Linac - KOF 1 ILC Main Linac Superconducting Quadrupole V. Kashikhin for Magnet group.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
Prototyping of Superconducting Magnets for RAON ECR IS S. J. Choi Institute for Basic Science S. J. Choi Institute for Basic Science.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
MQXC Nb-Ti 120mm 120T/m 2m models
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
AEGIS Magnet System.
The 11T cryo-assembly: summary of design and integration aspects
Compact and Low Consumption Magnet Design The DESY Experience
SCU Next Phase Meeting July 8, 2014.
HIE-LINAC status report
ILC Main Linac Superconducting Splittable Quadrupole
8-T Solenoid Package and Local Magnetic Shielding in FRIB Cryomodules
Electron Collider Ring Magnets Preliminary Summary
IR Beam Transport Status
Presentation transcript:

Status of the HINS Linac Front End Focusing Lens Development Can we use these lenses in the SSR1 crymodule of PXIE ? 9/27/20111 I.Terechkine for PXIE Cryomodule Design meeting

Requirements for HINS Linac focusing Lenses 9/27/2011 I. Terechkine for PXIE Cryomodule Design meeting 2 RT section (CH)SS1SS2 Bore diameter20 mm (warm)30 mm (cold) Squared field integral1.8 T 2 -m3.0 T 2 -m5.8 T 2 -m Magn. field on cavity walls (max) (*)50 Gs0.1 Gs(**) Temperature4 K4 K (***) Length (#)235 mm315 mm350 mm Dipole Corrector Strength (##)0.25 T-cm0.5 T-cm no data Alignment precision of ends of the effective length 0.3 mm (with correctors) no data The requirement table was modified several times during the four years of R&D (*) – The nearest wall was assumed when the fringe field was evaluated. (**) – initially was 0.01 Gs  see TD note TD (***) - 2K option was discussed, but rejected because of the lack of cooling power at 2 K. (#) - This length is more like available gap between the cavities. No BPM-s were considered. (##) – about a third of all lenses were required to have corrector dipoles

HINS Focusing Lend Development Status 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 3 CH section lenses (Cross-bar, H-type cavities for the room temperature section of the front end) Cold masses are in house: totally 23; 10 are equipped with correctors. Assembly in cryostats started in Two assemblies were finished (one with a prototype lens and one with Type 1 (no correctors) production lens. Three more (with type 2 correctors) are in a waiting line (no activity during this year). Alignment study we planned for this lens is not finished (lack of resources in MD and Test departments)

HINS Focusing Lend Development Status 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 4 SS1 lenses (Solenoids for Superconducting Section 1 of HINS linac) The lens is prototyped and tested. Two dipole correctors are embedded in the lens bore. It is assembled on the insulating post and equipped with a prototype adjustment stage to allow fine alignment in a cryomodule. The assembly rigidity test is performed. The lens is equipped with a magnetic shielding. Fringe magnetic field test has been performed in the SSR cavity test cryostat to prove the achieved efficiency of the magnetic shield.

HINS Focusing Lend Development Status 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 5 SS2 lenses The lens is prototyped and prepared for testing. The test has not been scheduled because the test stand is in use by other projects and because of the lack of resources in MD and Test departments. Quench protection issues for the SS2 lens have been resolved by employing different protection scheme.

CH-T2 Lens Design Features and Test Data 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 6 Measured magnetic field is compared to model prediction at 200A for as-built geometry. The insert shows fringe field. CH_T2 axial transfer function profile at 200 A. Nominal  1.8 T 2 ·m; Nominal current  170 A Quench current at 4 K  230 A Total Length  135 mm; Cold bore  45 mm; Outer diameter  200 mm

CH-T2 Lens Design Features and Test Data 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 7 CH-T2 lens quench training by the vendor at 4.2 K. Expected maximum current is 245 A. Corrector Dipoles Nominal strength  0.25 T ·cm Nominal current  135 A Maximum current  250 A

PXIE SSR1 cryomodule with CH-T2 cold mass 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 8 From PX document #798 (Dec. 2010) Tests at 2 K are needed to be sure it works and to find the margin Six current leads rated 300 A (may be less for the correctors) are needed for each lens

PXIE SSR1 cryomodule with CH-T2 cold mass 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 9 Possible obstacle – fringe field Finding what field we can allow on the outer surface can be relieving. Corresponding R&D is ongoing – waiting for a test cavity in IB1 test area 30-mm bore BPM concept

HINS Linac SSR1 Section Lens 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 10 As built SS1-T2 focusing lens Nominal Field Integral  300 T 2 ·cm Nominal current  175 A Maximum current  220 A

HINS Linac SSR1 Section Lens 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 11 Nominal strength  0.5 T·cm Nominal current  30 A Maximum current  40 A Dipole Corrector Assembly

SS1 Focusing Lens Assembly&Testing 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 12

PXIE SSR1 cryomodule with SS1-T2 cold mass 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 13 Existing elements can be assembled if the lattice period is 800 mm BPM is not a part of the SS1 lens No space for a BPM in the beam line From PX document #798 (Dec. 2010)

HINS SSR2 Section Focusing Lens 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 14 SS2-T2 Focusing Lens Nominal Field Integral  580 T 2 ·cm Nominal current  190 A Maximum current  250 A Nominal strength  0.5 T·cm Nominal current  25 A Maximum current  40 A Steering Dipoles:

HINS SSR2 Section Focusing Lens 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 15 Main problem for the SS2 focusing lens was inadequate quench protection. The problem was solved by applying different protection scheme and by using a specially developed quench propagation modeling tool. Having a new QP analysis tool allows to consider using smaller diameter of superconducting strand and smaller current.

Ongoing Activities 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 16 Understanding fringe magnetic field requirements. Several tests were made in the existing test cryomodule in MDB with the SSR1 cavity that indicated that a possibility exists of having significantly relaxed requirements for a fringe field of focusing lenses. The ultimate test with an SSR1 cavity in a vertical test cryostat in IB1 can provide enough data to come with a reasonable requirements for magnetic field on cavity walls. Because we still do not have SSR1 cavity in the IB1 test area, several tests were made with one-cell 1.3 GHz cavities. Write up of the tests is in preparation.

Ongoing Activities 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 17 Conduction Cooling Study As part of the fringe magnetic field R&D, several attempts were made to use a conduction-cooled coil in the MDB test cryostat. This branch of the study resulted in a conduction cooling R&D. If implemented properly, results of the R&D can provide another option for a cryomodule design – with no special LHe cooling line for focusing lenses. In turn, this way to configure a cryomodule will significantly relax requirements for the alignment system. Positive results of this work can generate strong motivation for lower nominal current in the lenses, which is only possible when the quench protection problem is solved for each specific lens design. That’s why it was so important not to stop SS2 lens design activities (with its quench protection issues) back two year ago, when the section was dropped out of the HINS program.

Ongoing Activities 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 18 Conduction Cooling Test: Heat Influx Two-Stage Filter

Dream Lens Design 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 19 #FeatureResultCondition 1No bucking coilsmore compact lens better defined optical axis fringe field requirements must be understood 2Conduction coolingno LHe line  significantly simpler cryomodule design no LHe line  no forces from the cooling line applied to the lens assembly conduction cooling R&D must be completed 3Low excitation current lower heat influx in the cryomodule may allow use of standard connectors quench protection study must be made; conduction cooling R&D must be made 4Optical alignment scheme simpler and cheaper than the BPM- based Alignment R&D must be completed

What is missing or lost 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 20 1.Alignment concept Existing one for SS-type lenses is based on the use of a special “certification” cryostat that would allow making “warm” magnetic axis position measurements during all stages of lens activation: pumping out, cooling down, and powering. The design work was stopped after the reorganization of the drafting department (with the goal to provide better support for mu2e magnetic system R&D) 2.Optical alignment study Several options were investigated: although results are promising, some problems (common to all systems) require more study. Long base alignment experiment must be completed, to start with that will provide an ultimate accuracy that can be achieved in a long cryomodule. 3.Lens development team There were at least 12 people involved at different stages of the HINS focusing lens design, prototype fabrication, and testing. Although we can probably rely of the IB1 testing area personnel with some planning (~4 people), those from the magnet department and from drafting department are mainly lost to other projects that have some priority. The team was formed during 4 years of the HINS linac lens R&D.

HINS Focusing Lens R&D Team 9/28/2011 I. Terechkine for PXIE Cryomodule Design meeting 21 Magnet department: J. Tompkins – head of the measurement group, team leader M. Tartaglia – magnetic measurements J. DiMarco– magnetic axis position T. Wokas- prototyping Test department: D. Orris- test configuration R. Rabehl- cryo-system C. Hess- test stand support (cryo) F. Lewis- test stand support (electrical) W. Schappert- optical alignment SRF department: T. Page- LHe vessel, current leads, cryostat I. Terechkine - lens design, R&D program coordinator Design&Drafting S. Meredith- cryo-vessel design G. Davis - lens design