Next Generation NBS John Gelder NBS Content development manager ICIS Berlin: June 2008.

Slides:



Advertisements
Similar presentations
Design Guidelines for Primary and Social Care focus on the Modernisation agenda integration of care: Traditional GP services Community services Social.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Portal Framed Construction
Bond Program Planning Imperatives Study Session October 12, 2004.
Timber Framed Structures
Green Initiatives Throughout Green-collar job training – Enhance, Expand, Develop, Sustain Green practices in facilities and center culture – Construction,
LAYOUT OF STEEL STRUCTURES
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
 What we plan to do next Digital Thinking, Smart Building: Driving Building Lifespan and Resource Efficiencies The Performance Gap Reid
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
Facility Management. The International Facility Management Association defines facility management as a profession that encompasses multiple disciplines.
MasterFormat™ April 7, 2005 Kevin R. Miller.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
July 11 th, 2005 Software Engineering with Reusable Components RiSE’s Seminars Sametinger’s book :: Chapters 16, 17 and 18 Fred Durão.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
MasterFormat™ March 17, 2004 Kevin Miller.
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
Examination 7 th Semester CAHS 71 Bianca Bogdan. Outline Proposal Scheme Design Detail Design 1 Detail Design 2.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 8 Slide 1 Tools of Software Development l 2 types of tools used by software engineers:
Case Study – St Clair Park Village, Auckland, NZ
Introduction to BIM BIM Curriculum 01.
Logistic Management of investment-construction project TRANSMARKET GROUP.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Welcome to your music business. So what do you need to do to get started? PLAN & ORGANISE Otherwise you may never get started and even if you do, the.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Fire and Emergency Services Company Officer — Lesson 17 Fire and Emergency Services Company Officer, 4 th Edition Chapter 17 — Preincident Planning.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
© 2012 Autodesk Autodesk® Revit® Structure: From Design to Detailing and Fabrication to Construction Allen Levy Applications Specialist.
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
2009/ 2010 Linus Wang MBA, MSc (Int’l Constr Mgmt), B Eng (Civil) Diploma in Construction Management Diploma in Quantity.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Process of Planning, Designing and Financing a Hospital
A few different things… ID 206 construction + materials II.
Lecture 15 - Timber Wall Framing Example
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks Initial Selection of Building Industry Sectors.
Once the designer has decided to use and selected the correct Magna 3 pump in a specific application they must communicate these decisions to the contractor.
Survey Meeting John Osborne, CERN 8 February 2016
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
JLC CONSTRUCTION FIELD GUIDE The most comprehensive and trusted reference guide to best practices for the construction market ANY TIME. ANY PLACE. ANY.
CDM Construction Design and Management
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
Introduction to Building Trades Denver High School.
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 5 OF 10 SIP Layout Drawings SPONSORED BY:
CASE (Computer-Aided Software Engineering) Tools
What’s New in Version 5? What’s New in MiTek 20/20? New Product Versions Layout MBA Engineering Batchcut Output.
West Cambridge Data Centre Ian Tasker Information Services.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Joanne Macgregor C Lund & Son Ltd March 2016
The Design Team Carl James.

RIBA Plan of Work 2013.
Pre-Contract Cost Control
delivering value thru life-cycle BIM
HANDICAPPED PEOPLE RESIDENT
TCU-PROJECT: 7TH Semester Course
Chapter 8 Framing Systems.
The Form of Procurement for the EcoHome Project
RIBA Plan of Work 2013.
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

Next Generation NBS John Gelder NBS Content development manager ICIS Berlin: June 2008

Phase One Enhanced construction specification

The main problems NBS Building & Landscape do not support outline and performance specifications, i.e. they don’t support specification for the various flavours of design-build procurement. They don’t support FM specification, i.e. they don’t support PFI/PPP/BOOT procurement. They are not BIM-enabled, either.

Products to components B70-79Groups C-P, R-XGroups C-Y UNION BUILDING: FABRIC SYSTEMS Steel framing system Cavity masonry walling system Tile roofing system → TILE ROOFING SYSTEM Carpeting systemClay tiles Room signage systemRoof lights → ROOF LIGHTS Tile battensFrame: Timber BUILDING PERFORMANCE: FABRIC SYSTEMS UnderlayGlazing: Double Security: Bars SYSTEM PERFORMANCE Accessories: Blind

Worked examples NBS Engineering Services

Worked examples NBS Building Prototype

Linkage – a no-brainer Three levels proposed: –Manual with guidance only, as in NBS Engineering Services – subscribers expect MORE … –Smart tags for common actions, an ignorable version of …. –Enforced, strict control, for BIM integrity, e.g. will not permit orphan clauses.

Section structure Specification type: Outline spec Performance spec Developed performance spec Modern spec Traditional spec FM spec Possible procurement route: First- stage tendering for full contractor design Second-stage tendering for full contractor design Mostly contractor design Mostly consultant design Full consultant design FM Systems System performance fullmostlypartialfull Productspartialmostlyfullrecord Fabricationpartialmostlyfullrecord Executionpartialmostlyfullrecord Completionpartialmostlyfull Facility management full

Phases Two+ Brief, compliance specification Record specification, FM specification

The main problems NBS does not support briefing. NBS does not support compliance (building control) specifications. NBS does not support record specifications. NBS does not support FM specifications. NBS does not support civil or process engineering.

Specification timeline

Objects & decomposition

Adapting Uniclass Settlement / Region Infrastructure / Facility Open spaces Underground structures Building structures Other on- ground structures Elevated structures ActivitiesProcess engineering systems Fabric systems C&A Spaces Products Services systems C&A D L D G D J D

Table D: Facilities D1Utilities and civil engineering facilities D2Industrial facilities D3Administrative, commercial and protective service facilities D4Medical health and welfare facilities D5Recreational facilities D6Religious facilities D7Educational, scientific and information facilities D8Residential facilities D9Other facilities

Table J: Work sections Current CAWS is deficient in all sorts of ways … –New technology, e.g. ETFE foil roofs. –Package contracting, e.g. Fire door sets. –Flexibility, e.g. contiguous splitting of M50. –Design-build procurement – systems/elements needed, as in NBS Engineering Services. –Users, e.g. architectural/utilitarian/landscape signage. –Consistency, within building fabric groups & with services groups. –Estimating – systems/elements again. –Facility management – a new ‘trade’. –Ignores civil and process engineering.

Pre-construction

Buildings to systems B10-19B50-59B60-69B70-79 UNIVERSITY Admin Building Lecture Building Union Building →UNION BUILDING: ACTIVITIES →UNION BUILDING: SPACES →UNION BUILDING: FABRIC SYSTEMS →UNION BUILDING: SERVICES SYSTEMS Car parkAdministrationOfficesSteel framing systemCold water supply system GardensEntertainmentHallCavity masonry walling systemBiomass space heating system PlazaEatingHallTile roofing systemNatural ventilation system ResearchLibraryCarpeting systemLighting system FACILITY PERFORMANCE MeetingsHallRoom signage systemLifts system BUILDING PERFORMANCE: ACTIVITIES BUILDING PERFORMANCE: SPACES BUILDING PERFORMANCE: FABRIC SYSTEMS BUILDING PERFORMANCE: SERVICES SYSTEMS

Worked examples NBS Building Prototype

ISO 9699 Project management Project context Project requirements FacilitiesConstruction entities ActivitiesSpacesElementsConstruction products A.1  A.2  A.3  A.4  A.5  B.1  B.2  B.3  B.4  B.5  B.6  B.7  B.8  C.1  C.2  C.3  C.4  C.5  C.6  Briefing to ISO 9699

Compliance specification PART ASTRUCTURE REQUIREMENTS A1 & A2: LOADING AND GROUND MOVEMENT Section 2ABASIC REQUIREMENTS FOR STABILITY 2A1Not used. 2A2Overall size and proportioning of building: As drawing A01. Wall layout: As drawing A02. Connection for internal and external walls: Masonry bonding. Construction of roofs and intermediate floors and interconnection with walls: As detail drawings A Bracing for trussed rafter roofs: In accordance with BS

Post-construction

Builders’ tools Tender: Outline report, Tendering collected, Contract annexures collected, easy disassembly for s/c tenderers. Mobilisation: Builders’ prelims collected, smaller sections, easy disassembly for s/c packaging. Execution: Variety of reports, e.g. contractor design, systems; General technical material collected, easy disassembly for sub-s/c, links to CIS etc. Completion: Variety of reports, e.g. spares.

Record specification Converts contract product clauses to 100% proprietary, for brands actually used in the project. Contract spec may have had a generic product clause (e.g. to a BS) or another brand, since substituted. Precursor to FM specification. May be the result of a survey, if an existing building – hence survey sections, e.g. C14.

Hard FM SubsectionMaintain thisto these levelsusing these procedures GeneralRecord System performanceBriefed ProductsRecord FabricationRecord ExecutionRecord Completion Facility management

Hard FM: FM subsection 950SYSTEM FACILITY MANAGEMENT Operation: –Function: [...]. (i.e. structured O&M manual) –Health and safety: [...]. (i.e. structured H&S File) –Conservation of fuel and power: [...]. (i.e. structured Part L response) Maintenance: –Function: [...]. –Health and safety: [...]. –Conservation of fuel and power: [...].

Soft FM: Classification ZFacility management services Z1Space services Z2Cleaning services Z3Outdoor space services Z4Workplace services Z5Health, safety & security services Z6Hospitality services Z7Information & communication services Z8Logistics services Z9Integrated management, consultancy & administrative services