Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.

Slides:



Advertisements
Similar presentations
Supply presentation FACELIFT. Who Are We ? Design and Architectural Studio Construction and Trade Company Service Center.
Advertisements

© Oxford University Press 2011 IP1.9.4 Payback calculations Payback calculations.
Farmworker Housing Inspections Unit 3: Conducting the Inspection.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Repairing of Building Services Engineering Systems Rak Repair Methods of Structures, exercise (4 cr) Esko Sistonen.
Summary of Heat Loss Calculations Assessing overall heating requirements for building (E) Component U-ValueAreaHeat Loss Rate (W o C -1 ) Walls U walls.
Outlines:-Outlines:- Environmental Design. Architectural Design Modifications. Structural Design Quantity compare Lighting and Mechanical Design.
Department of Energy Energy Savers PowerPoint: Save Energy and Money Today 1 of 12.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Unit B 3.3 Useful Energy and Efficiency. Useful Energy The purpose of a machine is convert input energy into types of energy needed to do work. Anything.
Cristiana Colloca GS/SEM – ATOP – MARCH 2009 Infrastructure Consolidation of Accelerators Injectors (civil engineering) Cristiana Colloca GS/SEM – ATOP.
Demolition of Structures containing Asbestos Rak Repair Methods of Structures, exercise (4 cr) Esko Sistonen.
Heath and Safety Contractor Induction. AUTHORISATION TO WORK No work should be carried out unless you have been given authorisation from your host Contact.
What is an Energy Audit ? Ramon Casado Adam Romano.
Your School Energy Saving Plan Put in photos of people who did the audit on this slide Put your school logo here Date.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
PH electronics “Headquarters” Refurbishment status.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
Overview of Energy Efficiency & Renewable Energy (Draft version) Prepared by Natural Resources Canada in association with Indian and Northern Affairs Canada.
Passive House Seminar for Professionals from the Building Sector
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
NOW, to what we have already achieved… We have a new roof on sanctuary and ground work to prevent prior water issues…..
Marriott Corporate Headquarters
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008.
Heat Exchange Ventilation Heat Exchange Ventilation.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
PH Building Assessment Buildings 15, 22, 23, 154, 167 Safety Analysis.
-Too little or too much ventilation -Insufficient ventilation results in excessive indoor humidity -Uncontrolled ventilation can cause exhaust leaks within.
1 Wick High School Rated “D=Bad” for suitability by Highland Council (ref – Estate strategy Rev.1 Dec 2005) Wick High School Parent Council.
The Structure Shipping Container Buildings Upcycled = cheap, takes away from landfill Designed to carry heavy loads Designed to resist harsh environments.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
Energy saving in a Reasearch Facility Peter Natkanski.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
CTRA Green Features. 1. Green Roof 2. Hot Water Solar Heaters These are a type of solar panel. It is called evacuated tube collectors and they heat our.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
PH Department in context Safety Officers in PH Department
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
Types of Buildings for Explosives Storage MA02 Slide 1.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
ACSR Report The 33rd ARCASIA October 29 ~ November 2, 2012 Bali, Indonesia Korea Institute of Registered Architects (KIRA)
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. Bad case of Installation RAC-B-A07.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
First Wall Panel - Overview
A HOUSE.
An-Najah National University Faculty Of Engineering
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Installation of the T600 at Fermilab
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ELENA electron cooler and SEM grids status
PREPARATION FOR WINTER
Registration assignment
Maintenance at ALBA facility: Strategy for the conventional services
Presentation transcript:

Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011

Building 16 and 17 are inside a common environment with building 153, 162, 18, 173 and 256

Building 16 is used mainly by PH DT, but also LHCb and some other scattered users (e.g. CLOUD, ATLAS ) Building 17 is used by AB and PH (1 st floor) Building 153 is used by PH/DT (assembly hall) Building 162 is used by AB and PH (mechanical workshop) Building 173 is used by AGEIS, CMS and PH/DT Building 256 is used by PH/DT (gas calibration lab, renovated in 2009/10)

VIEW OF GROUND FLOOR LEVEL OF BUILDINGS 16,17,153,162

BAT 16 BAT 153 BAT 162 BAT 17

BAT 16 BAT 173 BAT 153

In 16 and 17 we have mainly offices with few labs and one meeting room. In 153, 162 and 173 we have labs with workshop and assembly area. This area is sharing a 40 tones crane and the whole building complex is served by a single heating system and it is an open volume, so noise is shared by all users.

List of urgent renovations need for building 16 and 17 independently of the total area problematic In view to have a safe and clean working environment Installation of emergency evacuation lighting. Building 16 : ground floor and first floor need 2 each. Building 17: ground floor, first floor and 2 nd floor need 2 each.  Total 10 evacuation lamps. Reparation of almost destroyed water pipes connections (cf picture 1 on following page)

Consolidation of cracks on walls due to crane movement and revision for the maximum load for the crane ( three major cracks identified – two on first floor bldg 16 and one on ground floor of Bldg 16.) the major one is more than 2 meters long and open almost 5 mm!!! Cf pictures7 to 10 on following slides. Painting of one toilet and reparation of tiles in two toilets.(12m2 painting and 2 m2 tiles) External blinds reparation or exchange, (10 windows for buildings 16 and 17) Painting of Copy machine room, bat 16. (10m2)

Picture 1 Picture 2 Picture 3

Picture 4 Picture 5 Picture 6

Picture 7Picture 8

Picture 9 Picture 10

General problems for Building 16, 17, 153, 162 and 173 Heating is actually performed by a very old system. Cf picture 4 Regularly out of order, not efficient and very noisy. But very big volume to heat (16, 17 and 153 and 162) and the insulation of the buildings should be reviewed in parallel Noise: from heating and heat treatment activity (power supply) Cf report at the end

Water leaks from the roof Asbestos dust should be checked Bad smell from waste water

Noise measurement report